Loading…
Loading…
Tender ID
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
27 Apr 2026, 6:00 pmClosed
CAPT LAKESH JAMWAL, OFFG GE AF LEH
GE AF LEH NEAR POLICE HEAD QUARTER LEH PIN 194101
CAMOUFLAGE PAINTING TO CERTAIN BUILDINGS IN DOMESTIC AND TECHNICAL AREA AT AF STN LEH AND AF KARGIL UNDER GE AF LEH
2026_MES_759331_1
GE(AF)Leh/T-11/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE AF LEH
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE AF LEH
₹90,000
Yes
7 Apr 2026
7 Apr 2026
29 Apr 2026
7 Apr 2026
27 Apr 2026
20 Apr 2026
7 Apr 2026 - 18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Taking down cement or cement lime plaster of any description on brick or stone walls etc including raking out joints, hacking for key etc complete all as specified and directed by Engr-in-Charge. | - | Sqm | - | - |
| - | M&L for rendering 15mm thick in CM 1:4 on fair faces of brick work or concrete surfaces finished even and smooth without using extra cement complete all as specified and directed by Engr-in-Charge. | - | Sqm | - | - |
| - | M&L preparation of old treated wooden surface of any description over 10 cm in width or girth and applying one coat of synthetic enamel paint complete all as specified | - | Sqm | - | - |
| - | M&L for preparation of newly plastered surfaces of wall, projected face of chajja, projected face of roof slabs & face and sides of sunshade including preparation of surfaces including cornices, plasters etc complete and applying two coat of exterior emulsion paint in pattern (two or more colour combination) over one coat of exterior primer applied complete all as specified and as directed by the Engr-in-Charge. (Note : Design, pattern & colour will be approved by the GE)
Notes: (i) Camouflaging pattern will be approved by the GE.
(ii) Work shall be executed Upto 10 mtr high .
(iii) All Safety measures for the safety of workmen shall be ensured by the contractor. Insurance of workers shall also be got done by the contractor before execution of work | - | Sqm | - | - |
| - | M&L Complete removal of existing treatment of walls including preparation of surface wall, projected face of chajja, projected face of roof slabs & face and sides of sunshade including preparation of surfaces including cornices, plasters etc complete and applying two coat of exterior emulsion paint in pattern (two or more colour combination) over one coat of exterior primer applied complete all as specified and as directed by the Engr-in-Charge. (Note : Design, pattern & colour will be approved by the GE)
Notes: (i) Camouflaging pattern will be approved by the GE.
(ii) Work shall be executed Upto 10 mtr high .
(iii) All Safety measures for the safety of workmen shall be ensured by the contractor. Insurance of workers shall also be got done by the contractor before execution of work | - | Sqm | - | - |
| - | M&L for preparation of old surfaces of wall, projected face of chajja, projected face of roof slabs & face and sides of sunshade including cornices, plasters etc complete and applying one coat of exterior emulsion paint in pattern (two or more colour combination) over existing pattern complete all as specified and as directed by the Engr-in-Charge.
Notes: (i) Camouflaging pattern will be approved by the GE.
(ii) Work shall be executed Upto 10 mtr high .
(iii) All Safety measures for the safety of workmen shall be ensured by the contractor. Insurance of workers shall also be got done by the contractor before execution of work | - | Sqm | - | - |
| - | M&L for complete removal of existing paint from steel surface by paint removers or burning by blow lamp and cleaning with scrapers any number of coats of any description exceeding 10 cm width or girth including preparation of surface and applying two coat of synthetic enamel paint in comouflage pattern (Two or more Colour Combination) over one coat red oxide primer complete all as specified and as directed by the Engineer-in-charge.
Notes: (i) Camouflaging pattern will be approved by the GE.
(ii) Work shall be executed Upto 10 mtr high .
(iii) All Safety measures for the safety of workmen shall be ensured by the contractor. Insurance of workers shall also be got done by the contractor before execution of work | - | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_850518.xls
BOQ • 0.31 MB
TENDERDOCUMENTST11.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .