Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.2 LAccepted-AOC AT UPPER BOOTY NEAR KRISHNA NURSING HOME P S SADAR RANCHI JHARKHAND 835217 | RANCHI | JHARKHAND | 835217 | ₹30.2 L | L-1 | Accepted-AOC because of L1 bidder |
| 2 | L-2₹30.5 L+₹33,244 (1.10%)Rejected-Finance FLAT NO 02B GAMHARIA SAWARNA PALACE TATA KANDRA MAIN ROAD VILLAGE TOWN GAMHARIA CITY JAMSHEDPUR SERAIKELA KHARSAWAN JHARKHAND 832108 INDIA | SARAIKELA KHARSAWAN | JHARKHAND | 832108 | ₹30.5 L+₹33,244 (1.10%) | L-2 | Rejected-Finance As per TEC recommendation. |
| 3 | L-3₹33.2 L+₹3.1 L (10.1%)Rejected-Finance KOTO PTPS PATRATU | PATRATU | JHARKHAND | ₹33.2 L+₹3.1 L (10.1%) | L-3 | Rejected-Finance As per TEC recommendation. |
Tender Value
₹30.2 L
EMD Value
₹60,500
Closing Date
25 May 2026, 12:00 pmClosed
GM, TZ-IV, Medininagar
office GM, TZ-IV, Medininagar AT- Sudna, bypass road, near irrigation dept. Medininagar- 822101.
Annual maintenance work of 400/220/132 KV Grid Sub-Station, Latehar for the period from 01.07.2026 to 31.12.2026.
2026_JSEB_113530_1
60/PR/JUSNL/2026-27
Open Tender
Electrical Works
Works
400/220/132 kV GSS Latehar
please refer tender documents
2 documents required · 2 mandatory
₹5,900
₹60,500
Yes
27 Jun 2026
4 May 2026
26 May 2026
4 May 2026
25 May 2026
4 May 2026
Supply of Manpower For Preventative / Routine Maintenance of Grid Substation as per schedule provided by Engineer Incharge.
Mobilisation of Lobour (one gang should consist of 20 person) in special case.
Erection, Connection, Testing & Commissioning all Complete work :
Dismantling of following equipments at site.
Engagement of Hydra/ Crane for routine/breakdown the maintenance work in the GSS whenever required
Add. Hrs.
Transportation of equipments/materials by up to 6 MT truck from Transmission Central Store Namkum or Other GSS/Sites within 200 KM radius to GSS Latehar.
Transportation of equipments/materials by up to 6 MT truck from Stores/GSS within 100 KM radius to GSS Latehar.
Provision of self propelled manlift with operator and their labour & statutory compliances for maintenance work in Switchyard equipments and Power Transformers.
Loading, unloading, Mobilisation and Demobilisation Charges for the self propelled manlift.
Provision of fuel for man-lift @ 4 litres/ hour for 120 hours.
Provision of fuel for 250 KVA DG set @ 24 litres/ hour for 60 hours.
Assessment of battery charger at 400/220/132 KV GSS, latehar
Maintenance and replacemnt of defective parts/ equipments of battery.
Testing transfomer oil by recognized laboratory including supply of sampling bottle
Repair and Overhauling of 3 ph Submerisble pump set including cost of materials, lifting & lay down of Submersible pump from bore well, repair of water supply pipe all complete job and Transportation cost.
Rewinding and overhauling of 3-phase motor of motorised isolator/ earthswitch, including dismantling and erection.
Rewinding and overhauling of 1-phase spring charging motor of SF6 circuit breakers including dismantling and erection.
Repair and overhauling of Fire fighting pump
Preventive & periodic maintenance of DG set including all necessary consumables used in maintenance
Supply of Consumables viz. Markin cloth, Cotton waste, cable lugs, cable ties, Brush, torch cell, Petrollium Jelly, Grease, Petrol, lubricant, WD-40 rust remover, etc., whatever required time to time for O&M work of G/S/S.
Repair / servicing / ovehauling of vacume pump of 400 KV C.B.
Air Conditioner (Split, tower and Casette type) Maintenance. In single tower type unit there are two units of AC, so for maintenance two nos. have been considered for each one tower type unit. (i) Tower Unit (x 2 nos. AC units) = 8x 2 = 16 Nos. (ii) Casette Type = 08 Nos. (iii)Split (Wall mounted) Type = 09 Nos.
Sub-Total A (Rs.) (Sl. No. 1)
Sub-Total B (Rs.) (sum of Sl. No. 02 to 21)
Tools & Tackles, Dress Code etc. @3% on Sub-Total A (Rs.)
Contractor Profit@10% on Sub-Total A (Rs.)
E.P.F. Contribution by employer @ 12% on Sub-Total A (Rs.)
Adiministrative Charge@ 1% on Sub-Total A (Rs.)
E.S.I.C. Contribution by employer @ 3.25% on Sub-Total A (Rs.)
Total (Rs.) (sum of Sl. No. 22 to 28)
Quoted value/rate on Total (Rs.) ie on Rs. 25,35,855.03 (To be quoted by bidder in digit only below or above upto two decimal places only)
GST @18% on quoted amount (Rs.)
Total after GST (Rs.)
Labour Cess @1%
Grand total (Rs.)
Says (Rs.)
Amount in word:
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
boq60.pdf
Tender Documents • 1.80 MB
boqpricepart60.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .