Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.8 LAccepted-AOC | ₹12.8 L | 1 | Accepted-AOC lowest bidder |
| 2 | 2₹14.2 L+₹1.4 L (10.8%)Rejected-Finance | ₹14.2 L+₹1.4 L (10.8%) | 2 | Rejected-Finance 2nd lowest bidder |
| Sl No | Description | Qty | Unit | M/s ARVIND KUMAR CONTRACTOR L1 | NARANG TRADERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods CSR Item 6.2 (a) | 1 | Cum | 79 ₹79 Lowest | 81 ₹81 |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. CSR Item 6.2 (b) | 1 | Cum | 110 ₹110 Lowest | 114 ₹114 |
| 3.00 | Dressing of New Earthwork CSR Item 6.3 (i) | 1 | Sqm | 1 ₹1 Lowest | 1.3 ₹1.3 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. CSR Item 6.8 (b-i) | 1 | Cum | 140 ₹140 Lowest | 145 ₹145 |
| 5.00 | Re-handling of earthwork recently executed (-) 20% less of CSR Item 6.2 (a)-note II | 1 | Cum | 60 ₹60 Lowest | 65 ₹65 |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. CSR Item 6.18 (a) | 1 | KM | 800 ₹800 Lowest | 850 ₹850 |
| 7.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 180 ₹180 Lowest | 190 ₹190 |
| 8.00 | Dismantling brick work, tile masonry or tile lining (in cement mortar). | 1 | Cum | 800 ₹800 Lowest | 900 ₹900 |
| 9.00 | Dressing of Bed and Preparation of Sub-grade for Lining CSR Item 19.1 | 1 | Sqm | 12 ₹12 Lowest | 12 ₹12 Lowest |
| 10.00 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 1 | Cum | 7,100 ₹7,100 Lowest | 7,200 ₹7,200 |
Tender Value
₹13.3 L
EMD Value
₹26,500
Closing Date
25 May 2026, 10:00 amClosed
Divisional Engineer, Abohar PWRMDC Division, Aboha
Divisional Engineer, Abohar PWRMDC Division, Abohar
Estimate for Lining/Relining of watercourses of O/L RD 108968-L/ 131968-L of Sukhchain Mr. by laying brick masonry (bed cement concrete) of Village Bhaggu Distt. Fazilka.
2026_WR_168345_1
NIT 05 of 2026
Open Tender
Civil Works
Item Wise
120 days
Abohar
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹26,500
Divisional Engineer, Abohar PWRMDC Division, Aboha
12 Jun 2026
13 May 2026
25 May 2026
13 May 2026
25 May 2026
13 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods CSR Item 6.2 (a) | - | Cum | 1 | - |
| 2 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. CSR Item 6.2 (b) | - | Cum | 1 | - |
| 3 | Dressing of New Earthwork CSR Item 6.3 (i) | - | Sqm | 1 | - |
| 4 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. CSR Item 6.8 (b-i) | - | Cum | 1 | - |
| 5 | Re-handling of earthwork recently executed (-) 20% less of CSR Item 6.2 (a)-note II | - | Cum | 1 | - |
| 6 | Dag belling single kassi stroke minimum 7.5 cm depth. CSR Item 6.18 (a) | - | KM | 1 | - |
| 7 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | Cum | 1 | - |
| 8 | Dismantling brick work, tile masonry or tile lining (in cement mortar). | - | Cum | 1 | - |
| 9 | Dressing of Bed and Preparation of Sub-grade for Lining CSR Item 19.1 | - | Sqm | 1 | - |
| 10 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | - | Cum | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 0.79 MB
TB01.xls
Tender Documents • 0.05 MB
BOQ_342837.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .