Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
30 Jul 2021, 3:00 pmClosed
PROJECT DIRECTOR DRDA MADURAI
DRDA MADURAI -20
RETENDER RENOVATION OF CLASS ROOM BUILDINGS,KITCHEN SHED IN KALLIKUDI BLOCK IN MADURAI DISTRICT. PACKAGE NO 16 UNDER RCSIDS 2020_21
2021_RDTN_206103_1
D4/2141/2020/RCSID/KALL16
Open Tender
Civil Works
Item Rate
60 days
KALLIKUDI
REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
₹8,000
15 Jun 2022
20 Jul 2021
30 Jul 2021
21 Jul 2021
30 Jul 2021
22 Jul 2021
Amount
Dismantling of damaged wall Plaster and removed away from the site including all labour charges etc complete.
Dismantling of damaged Floor finish and removed away from the site including all labour charges etc complete.
Dismantling of damaged RCC Concrete and removed away from the site including all labour charges etc complete.
Dismantling the existing damaged pressed tiles removed away from the site including all labour charges etc complete.
Supplying and Centring shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Supply and fabrication of Ms steel including cost and conveyance of all materials and all labour charges etc complete.
RCC 1:11/2:3 mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement and labour for mixing, laying, watering curing and compacting concrete and labour for form work and all other incidential charge
Plastering 1:3 (one cement and three sand) to 10 mm thick including mixing mortar, working in all heights curing watering with good water etc., complete complying with standard specification
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Terrace flooring with one course of new machine ( including cost of tiles ) pressed tiles of size 23x23x2 cm using Cm 1:3 etc complete.( Using New pressed tiles )
Terrace flooring with one coarse of old available machine( excluding cost of tiles ) pressed tiles of size 23x23x2 cm using Cm 1:3 etc .( Using Old pressed tiles )
Paving the floor with Stain free nano polish vitrified tiles of approved quality and colour of size 600 mm x 600 mm x 8 mm of approved make, quality and colour in all floors over a base layer of CM 1:3, 20mm Tk and laid straight alignment and pointed neatly with colour cement at the rate of 0.40 kg/m2 laid without any air gap in the tiles neatly and fixing in position as per the colour & quality of tiles should be got approved.
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc
Distembering two coat using oil paint including cost and conveyance of all materials to site and all labour charges etc completed
Emulsion painting with two coat using emulsion paint including cost and conveyance and all labour charges etc complete
Painting two coat of old iron works such as steel including cost and conveyance and all labour charges etc complete
Block board Painting including all cost and conveyance of all materials and all labour charges etc., complete.
Point wiring with 2x1.5 sqm copper contuct light point all labour charges etc., complete.
Point wiring with 2x1.5 sqm copper contuct Plug point all labour charges etc., complete.
Point wiring with 2x1.5 sqm copper contuct Fan point all labour charges etc., complete.
Supply and fixing of Tube light fittings and all labour charges etc., complete.
Supply and fixing of Fan SD No 100 all labour charges etc., complete.
Dismantling of damaged wall Plaster and removed away from the site including all labour charges etc complete.
Dismantling of damaged Floor finish and removed away from the site including all labour charges etc complete.
Best tiled Re roofing with Mangalore tiles, including cost and conveyance of all materials to site and all labour charges etc., complete ( Re roofing 80% excluding tiles Using Old available tiles )
Best tiled Re roofing with Mangalore tiles, including cost and conveyance of all materials to site and all labour charges etc., complete ( Re roofing 20% including tiles Using new tiles )
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix to using 40mm HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Brick work in CM 1:5 using country bricks including cost and conveyance all materials to site including cost of cement including labour charges for mixing , laying, curing,hire charges for tools and plants including all other incidental charges etc
Supply and fixing of Steel Door including all cost and conveyance of materials and all labour charges etc complete.size (1.10x2.10)
Supply and fixing of Steel Window including all cost and conveyance of materials and all labour charges etc complete.size (0.90x1.20m)
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the floor with Stain free nano polish vitrified tiles of approved quality and colour of size 600 mm x 600 mm x 8 mm of approved make, quality and colour in all floors over a base layer of CM 1:3, 20mm Tk and laid straight alignment and pointed neatly with colour cement at the rate of 0.40 kg/m2 laid without any air gap in the tiles neatly and fixing in position as per the colour & quality of tiles should be got approved.
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Distembering two coat using oil paint including cost and conveyance of all materials to site and all labour charges etc completed
Emulsion painting with two coat using emulsion paint including cost and conveyance and all labour charges etc complete
Painting two coat of New iron works such as steel including cost and conveyance and all labour charges etc complete
Painting two coat of old iron works such as steel including cost and conveyance and all labour charges etc complete
Painting two coat of old Wood works such as steel including cost and conveyance and all labour charges etc complete
Block board Painting including all cost and conveyance of all materials and all labour charges etc., complete.
Point wiring with 2x1.5 sqm copper contuct light point all labour charges etc., complete. SD 20
Point wiring with 2x1.5 sqm copper contuct Plug point all labour charges etc., complete. SD 36
Supply and fixing of Tube light fittings and all labour charges etc., complete. SD 88
Supply and fixing of Fan SD No 110 all labour charges etc., complete.
Dismantling of damaged wall Plaster and removed away from the site including all labour charges etc complete.
Dismantling of damaged Floor finish and removed away from the site including all labour charges etc complete.
Best tiled Re roofing with Mangalore tiles, including cost and conveyance of all materials to site and all labour charges etc., complete ( Re roofing 75% excluding tiles Using Old available tiles )
Best tiled Re roofing with Mangalore tiles, including cost and conveyance of all materials to site and all labour charges etc., complete ( Re roofing 25% including tiles Using new tiles )
Supply and fixing of Steel Door including all cost and conveyance of materials and all labour charges etc complete.size (1.10x2.10)
Supply and fixing of Steel Window including all cost and conveyance of materials and all labour charges etc complete.size (0.90x1.20m)
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
Distembering two coat using oil paint including cost and conveyance of all materials to site and all labour charges etc completed
Emulsion painting with two coat using emulsion paint including cost and conveyance and all labour charges etc complete
Painting two coat of old iron works such as steel including cost and conveyance and all labour charges etc complete
Painting two coat of old Wood works such as steel including cost and conveyance and all labour charges etc complete
Block board Painting including all cost and conveyance of all materials and all labour charges etc., complete.
Point wiring with 2x1.5 sqm copper contuct light point all labour charges etc., complete. SD 20
Point wiring with 2x1.5 sqm copper contuct Plug point all labour charges etc., complete. SD 36
Supply and fixing of Tube light fittings and all labour charges etc., complete. SD 88
Supply and fixing of Fan SD No 110 all labour charges etc., complete.
Dismantling of damaged wall Plaster and removed away from the site including all labour charges etc complete.
Dismantling of damaged Floor finish and removed away from the site including all labour charges etc complete.
Plastering 1:3 (one cement and three sand) to 10 mm thick including mixing mortar, working in all heights curing watering with good water etc., complete complying with standard specification
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Pointing with cement Mortar 1:3 mix for Random Rubble masonry including cost and conveyance of all materials and labour charges
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete.,
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc
Distembering two coat using oil paint including cost and conveyance of all materials to site and all labour charges etc completed
Emulsion painting with two coat using emulsion paint including cost and conveyance and all labour charges etc complete
Painting two coat of old iron works such as steel including cost and conveyance and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V SARAVANAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .