| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.1 LAccepted-AOC | ₹32.1 L Quoted ₹32.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹35.1 L+₹2.4 L (7.30%)Rejected-Finance | ₹35.1 L+₹2.4 L (7.30%) | L2 | Rejected-Finance L2 |
| 3 | L3₹35.9 L+₹3.3 L (9.97%)Rejected-Finance | ₹35.9 L+₹3.3 L (9.97%) | L3 | Rejected-Finance L3 |
| 4 | L4₹46.7 L+₹14.0 L (42.9%)Rejected-Finance | ₹46.7 L+₹14.0 L (42.9%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/s DATAAR BUILDERS L4 | SUDESH ENTREPRISES L3 | MS FUTEC ENGINEERS L2 | S M BUILDERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of brick tiles or terracing tiles in single or double layers on roofs complete all as specified and as directed by Engineer-in-charge .
Notes:- (i) . If any lightining conducture is found duing dismantling of roof tiles at site, it shall be carefully removed and refixed in the same position after laying of APP membrane as per direction by Engr-in Charge.
(ii) No additional rate shall be paid for removal and refixing of lighting conducture to the contractor. | 1,300 | Sqm | 100 ₹1,30,000 | 200 ₹2,60,000 | 30 ₹39,000 Lowest | 60 ₹78,000 |
| 2.00 | Demolition of concrete in Roof and paving not exc 15 cm thickness in roof and similar suspended work and removal of Debris out side of MOD land complete all as specified and as directed by Engineer-in-charge | 104 | Cum | 700 ₹72,800 | 500 ₹52,000 | 400 ₹41,600 | 200 ₹20,800 Lowest |
| 3.00 | Roughening surfaces of old concrete floor/roof by picking, sweeping clean and washing down with water to remove dust etc. including providing neat cement slurry @ 3Kg/Sqm and preparing slab surface with wire brushing complete and finishing top surface of PCC rough & even to receive the bedding layer complete all as specified and as directed by Engineer-in-charge | 1,300 | Sqm | 130 ₹1,69,000 | 30 ₹39,000 | 30 ₹39,000 | 10 ₹13,000 Lowest |
| 4.00 | Material & Labour for 50 mm thick PCC 1:2:4 type B-1 using 20 mm graded stone aggregate as in roof padding, levelling course complete all as specified and as directed by Engineer-in-charge | 1,300 | Sqm | 390 ₹5,07,000 | 250 ₹3,25,000 Lowest | 350 ₹4,55,000 | 250 ₹3,25,000 Lowest |
| 5.00 | Material and labour priming surfaces and applying normal treatment (for moderate conditions) using glass fibre base bitumen felt, grade -2 complete all as specified and as directed by Engineer-in-charge | 1,370 | Sqm | 180 ₹2,46,600 | 50 ₹68,500 Lowest | 50 ₹68,500 Lowest | 100 ₹1,37,000 |
| 6.00 | M & L for providing 3 mm thick APP based polymeric membrane minimum weight 3kg/sqm and minimum 3mm thick reinforced with polyester non woven fabric (wt. not less than 150 gms/sqm ) land on primed surface by forced applicationcomplete all as specified and as directed by Engineer-in-charge | 1,370 | Sqm | 520 ₹7,12,400 | 350 ₹4,79,500 | 390 ₹5,34,300 | 300 ₹4,11,000 Lowest |
| 7.00 | Material & Labour 40 mm thick brick tiles laid over and including15 mm thick screed bed in cement mortyar 1:6 and pointed in cement mortar 1:3 mixed with crude oil @ 5% by weight of cement complete all as specified and directed by Engineer-in-Charge | 1,300 | Sqm | 670 ₹8,71,000 | 600 ₹7,80,000 Lowest | 600 ₹7,80,000 Lowest | 700 ₹9,10,000 |
| 8.00 | Demolition of cement concrete (unreinforced) in ground floor amd paving n, exc 15 cm thickness (below or above ground level) and removal of debris ouside MOD land complete all as specified and as directed by Engineer -in-charge | 8 | Cum | 500 ₹4,000 | 500 ₹4,000 | 400 ₹3,200 | 150 ₹1,200 Lowest |
| 9.00 | Material and labour for cement concrete type B-0,1:2:4 using 12.5mm graded stone aggregates, as in steps; seismic and other similar bands, plinth courses, string courses, parapets and copings, kneelers, apex stones, bed plates, kerbs , water troughs and the like including weathering, slightly rounded or chamfered angles and throating complete all as specified and as directed by Engineer -in-charge | 8 | Cum | 5,500 ₹44,000 | 6,000 ₹48,000 | 4,500 ₹36,000 Lowest | 5,000 ₹40,000 |
| 10.00 | Demolition of brick work or stone/ boulder masonary including all quoins, arches, pillar etc built in cement mortar or cement lime mortar complete all as specified and as directed by Engineer -in-charge. | 30 | Cum | 500 ₹15,000 | 500 ₹15,000 | 400 ₹12,000 | 150 ₹4,500 Lowest |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
6 Aug 2026, 6:00 pmClosed
CWE Patiala
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact - 01712200082
REPAIR TO LEAKAGE, SEEPAGE, ROOF TREATMENT, RCC WORKS, ROOF TILING, BRICK WORK, PLASTERING WORK, SUNKEN PORTION TREATMENT AND OTHER CONNECTED WORKS IN DOMESTIC AND TECH AREA AT DAPPAR UNDER AGE (I) DAPPAR
2026_MES_777524_1
CWE/PAT/T-27/2026-27
Open Tender
Civil Works
Item Rate
180 days
AGE (I) Dappar
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
AGE (I) Dappar
₹1 L
2 Sept 2026
9 Jul 2026
10 Aug 2026
9 Jul 2026
6 Aug 2026
23 Jul 2026
9 Jul 2026 - 20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of brick tiles or terracing tiles in single or double layers on roofs complete all as specified and as directed by Engineer-in-charge .
Notes:- (i) . If any lightining conducture is found duing dismantling of roof tiles at site, it shall be carefully removed and refixed in the same position after laying of APP membrane as per direction by Engr-in Charge.
(ii) No additional rate shall be paid for removal and refixing of lighting conducture to the contractor. | 1,300 | Sqm | 1.25 | ₹1,625 |
| 2 | Demolition of concrete in Roof and paving not exc 15 cm thickness in roof and similar suspended work and removal of Debris out side of MOD land complete all as specified and as directed by Engineer-in-charge | - | Cum | 11 | - |
| 3 | Roughening surfaces of old concrete floor/roof by picking, sweeping clean and washing down with water to remove dust etc. including providing neat cement slurry @ 3Kg/Sqm and preparing slab surface with wire brushing complete and finishing top surface of PCC rough & even to receive the bedding layer complete all as specified and as directed by Engineer-in-charge | - | Sqm | 100 | - |
| 4 | Material & Labour for 50 mm thick PCC 1:2:4 type B-1 using 20 mm graded stone aggregate as in roof padding, levelling course complete all as specified and as directed by Engineer-in-charge | - | Sqm | 53 | - |
| 5 | Material and labour priming surfaces and applying normal treatment (for moderate conditions) using glass fibre base bitumen felt, grade -2 complete all as specified and as directed by Engineer-in-charge | 1,370 | Sqm | 10 | ₹13,700 |
| 6 | M & L for providing 3 mm thick APP based polymeric membrane minimum weight 3kg/sqm and minimum 3mm thick reinforced with polyester non woven fabric (wt. not less than 150 gms/sqm ) land on primed surface by forced applicationcomplete all as specified and as directed by Engineer-in-charge | - | Sqm | 10 | - |
| 7 | Material & Labour 40 mm thick brick tiles laid over and including15 mm thick screed bed in cement mortyar 1:6 and pointed in cement mortar 1:3 mixed with crude oil @ 5% by weight of cement complete all as specified and directed by Engineer-in-Charge | 1,300 | Sqm | 22 | ₹28,600 |
| 8 | Demolition of cement concrete (unreinforced) in ground floor amd paving n, exc 15 cm thickness (below or above ground level) and removal of debris ouside MOD land complete all as specified and as directed by Engineer -in-charge | 8 | Cum | - | - |
| 9 | Material and labour for cement concrete type B-0,1:2:4 using 12.5mm graded stone aggregates, as in steps; seismic and other similar bands, plinth courses, string courses, parapets and copings, kneelers, apex stones, bed plates, kerbs , water troughs and the like including weathering, slightly rounded or chamfered angles and throating complete all as specified and as directed by Engineer -in-charge | 8 | Cum | 10 | ₹80 |
| 10 | Demolition of brick work or stone/ boulder masonary including all quoins, arches, pillar etc built in cement mortar or cement lime mortar complete all as specified and as directed by Engineer -in-charge. | 30 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
tendert27.pdf
Tender Documents • 0.79 MB
BOQ_870790.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .