| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44.3 LAdmitted-Finance | -1.37% | ₹44.3 L | L1 | Admitted-Finance |
| 2 | L2₹44.6 L+₹27,838.92 (0.63%)Admitted-Finance FIROZABAD | UTTAR PRADESH | 224172 | -0.75% | ₹44.6 L+₹27,838.92 (0.63%) | L2 | Admitted-Finance |
| 3 | L3₹44.7 L+₹38,615.27 (0.87%)Admitted-Finance GRAM KHANJAPUR PO GAZIPUR FIROZABAD | FIROZABAD | FIROZABAD | UTTAR PRADESH | -0.51% | ₹44.7 L+₹38,615.27 (0.87%) | L3 | Admitted-Finance |
Tender Value
₹53.0 L
EMD Value
₹4.2 L
Closing Date
8 Jun 2026, 3:00 pmClosed
Executive Engineer
Nagar Nigam Firozabad
Construction work of RCC drain and CC road from Pankaj Kumar to Ashram, from Vineeta Devi to Sevak Ram and from Mandir to Hariom in Ward No. 42 Vijay Nagar.
2026_DOLBU_1148317_31
05/PWD_15vitt_Rajvitt/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,298
Municipal Corporation
₹4.2 L
4 Jul 2026
18 May 2026
8 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance.(As per Analysis of Rate) | 2,044.16 | cum | 374 | ₹7,64,515.84 |
| 2 | Grandular Sub- base with well Graded Material (A) BY Mix in place method construction of granular sub- base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with smooth wheelo roller to achieve the desired density complete.(As per Analysis) | 134.04 | cum | 3,234 | ₹4,33,485.36 |
| 3 | providing and laying cement concrete in 1:5:10 nlcuding suplly of all meterials, all complete. | 141.69 | Cum | 5,100 | ₹7,22,619 |
| 4 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 36.44 | Cum | 8,100 | ₹2,95,164 |
| 5 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) | 39.75 | Cum | 8,300 | ₹3,29,925 |
| 6 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.(PWD SOR 2025-26 Chapter No-06 Item No. 2 Spec. No. 6.1) | 31.74 | Cum | 5,500 | ₹1,74,570 |
| 7 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand ( Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level...... All complete.(PWD/SOR 2025-26 Chapter No-07 SI No. 2) | 39 | Sqm | 200 | ₹7,800 |
| 8 | CEMENT CONCRETE PAVEMENT(CC ROAD) Construction of unreinforced cement concrete road with cement, coarse sand and stone grit and fixing of 125 micron thick polythene film, .............................. …………….Complete(PWD SOR 2025-26,Chapter -12 SI No.11) | 163.59 | cum | 7,700 | ₹12,59,643 |
| 9 | RCC Work Providing and laying inposition specified grade of reinforced cement concrete slab including the cost of centering, shuttering, finishing and excluding reinforcement All work upto plinth level :1:1.5:3 (1cement :1.5 coarse sand: 3graded stone aggregate 20mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.8 Spec. No. 5.1). | 1.38 | Cum | 8,600 | ₹11,868 |
| 10 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) | 60.89 | Qtl | 7,800 | ₹4,74,942 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
BOQ_2150140.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .