Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | -30.00% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | -30.00% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹3.4 L+₹3,257.23 (0.96%)Admitted-Fee/PreQual/Technical/Finance | -29.33% | ₹3.4 L+₹3,257.23 (0.96%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹3.5 L+₹10,841.24 (3.19%)Admitted-Fee/PreQual/Technical/Finance | -27.77% | ₹3.5 L+₹10,841.24 (3.19%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹3.5 L+₹14,584.63 (4.29%)Admitted-Fee/PreQual/Technical/Finance | -27.00% | ₹3.5 L+₹14,584.63 (4.29%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹14,580
Closing Date
12 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONST. OF PROTECTION WALL ZIYARAT SHARIEF KASHIRA TO HOUSE OF NAZIR UD DIN BANIYA, TARIQ HUSSAIN BANIYA AND OTHERS
2026_RDPR_319681_15
NIT NO 87 OF 2026-27 GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹14,580
17 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
6 Aug 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mechanical means in trenches for foundations,including dressing of sides and ramming of bottoms lift upto 1.0 m, including getting out excavated earth and disposal of surplus excavated earth for all kinds of soils as directed by engineer incharge. | 50.98 | cum | 479.3 | ₹24,434.71 |
| 2 | Providing and Laying of dry stone soling duly hand packed including all carriages complete | 19.68 | cum | 1,000 | ₹19,680 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 65.25 | cum | 5,733.6 | ₹3,74,117.4 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for foundations footing bases of column for Mass concrete | 89.22 | sqm | 286.35 | ₹25,548.15 |
| 5 | Carriage of Materials Sand/Bajri(Crusher) from source of supply to site of Work by MT 25 km. | 88.09 | cum | 465.14 | ₹40,974.18 |
| 6 | Provision for community information board and A4 size phtographs. | - | No. | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1059726.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .