| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹44.5 LAccepted-Finance | ₹44.5 L | H3 | Accepted-Finance Quoted Lowest rate |
| 2 | H1₹47.2 LRejected-Finance D 5 1 RANA PRATAP BAGH DELHI 110007 | NORTH | DELHI | 110007 | ₹47.2 L | H1 | Rejected-Finance H1 |
| 3 | H2₹47.1 LRejected-Finance 109 IIND FLOOR MADANGIR VILLAGE NEW DELHI 110 062 | SOUTH | DELHI | 110062 | ₹47.1 L | H2 | Rejected-Finance H2 |
Tender Value
₹45.2 L
EMD Value
₹1.4 L
Closing Date
27 Jan 2026, 11:00 amClosed
SA ASI Meerut Circle
Office of the SA ASI Meerut Circle Shastri Nagar Meerut
SUPPLY OF MATERIAL AND JOB WORK UNDER SR TO RESTORATION AND CONSERVATION OF TOMB OF SAIYED SAIF KHAN AND HIS MOTHER MAJHERA MUZAFFARNAGAR 2025 2026
2026_ASI_892693_1
Nort/Meer/Saha/Tomb/23406345 (Materials and Job work)
Open Tender
Civil Works
120 days
Tomb of Saiyed Saif Khan and his Mother Majhera
Please refer tender document
2 documents required · 2 mandatory
₹0
₹1.4 L
Yes
29 Jan 2026
6 Jan 2026
28 Jan 2026
6 Jan 2026
27 Jan 2026
6 Jan 2026
ITEMS TO BE EXECUTED
Unslaked Lime
Surkhi
C. Sand
Belgiri
Brick Aggregate 20-25 mm
2nd Class Brick
Kakkar Stone
White Marble
65mm thick Red Sand Stone 10 sqm
Grey/White Sand Stone
RR Stone
65mm thick Red Sand Stone 10 sqm (for Arch)
Lakhori Brick
Tile Bricks
Mud Including Top Finish
Kail Wood Sleeper
Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
Ruled/ Flush pointing on White sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 {One lime : 1.5 surkhi (15% dark red and 85% light yellow surkhi) : 1/2 marble dust}. (The rate is inclusive of all materials & labours involved except scaffolding).
Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineerin- charge.
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
"Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil."
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 2.28.1 All kinds of soil
"Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)"
Provision for providing & making lime slacking & mortar pit by means of pit excavation, brick masonry & plastering over it. The size of the over all pit is 8.00M x 3.00M & depth is 1.00M. The pit is divided in to three parts & cement plastere
Provision for removal of Malba for cleaning the sites including collecting, staking and disposal of the rubbish /malba upto 100 meter lead including all the labour and transportation etc complete. out of the monuments premises and further
Provision for the purchasing of essential article and T & P for the proper execution of the work I) PVC sheet
II) PVC Pan (tasla)
III) Hammer with handle 1kg
IV) Iron chisel 4",6", 8"
V) PVC Bucket
VI) PVC Mug
VII)Wire & coir brush
VIII) Wire & coir brush
IX) Gum Boot PVC in pair
X) PVC pipe 1"
XI) Wooden handle (Fawra, Hammer)
XII) First Aid Box with Medicine
Provision for drawing and documentation charges including inspection of existing heritage structure and visitor infrastructure, site measurement survey, preparation of measured drawings (layout, elevation, sections), condition assessment report with photographs, graphical and coloured representations, proposal drawings, and printing/miscellaneous documentation?all complete as per site requirements and client discussions,
"Centering and shuttering including strutting, propping etc. and removal of form for 5.9.3 Suspended floors, roofs, landings, balconies and access platform"
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
2.pdf
Tender Documents • 6.50 MB
BOQ_938299.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid