| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC | ₹19.3 L | L1 | Accepted-AOC OK |
| 2 | L2₹19.4 L+₹9,674.03 (0.50%)Rejected-Finance NO 8 109 1 ARASAMARATHU KAADU MUTHUNAICKENPATTI SEMMAN KODAL POST OMALUR TALUK SALEM DISTRICT 636 304 | SALEM | TAMIL NADU | 636304 | ₹19.4 L+₹9,674.03 (0.50%) | L2 | Rejected-Finance REJECT |
| Sl No | Description | Qty | Unit | KJS CONSTRUCTION L2 | SRI SS AND CO L1 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | |||||
| 1.10 | FOOTING | 33 | Cu.m | 210 ₹6,930 | 205.5 ₹6,781.5 Lowest |
| 1.20 | PLINTH BEAM GROUND LEVEL | 10 | Cu.m | 105 ₹1,050 | 102 ₹1,020 Lowest |
| 2.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 35 | Cu.m | 255 ₹8,925 | 252 ₹8,820 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with sand filling in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 6 | Cu.m | 1,640 ₹9,840 | 1,637 ₹9,822 Lowest |
| 4.00 | Refilling with excavated earth in layers of 30 cm watered well rammed and consolidatred conforming to standard specification including labour charges as directed by Engineer in Charge | 14.6 | Cu.m | 39 ₹569.4 | 38.5 ₹562.1 Lowest |
| 5.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 10 | Cu.m | 5,295 ₹52,950 | 5,290 ₹52,900 Lowest |
| 6.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | |||||
| 6.10 | Footing and Plinth Beam | 26 | Sq.m | 307 ₹7,982 | 306 ₹7,956 Lowest |
| 6.20 | ROOF SLAB AND ROOF BEAM,LINTEL BEAM | 104 | Sq.m | 1,025 ₹1,06,600 | 1,023.5 ₹1,06,444 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
8 Aug 2025, 3:00 pmClosed
COMMISSIONER
EDANGANASALAI MUNICIPAL OFFICE
CONSTRUCTION OF RCC ROOF BUS SHELTER IN EDANGANASALAI MUNICIPALITY
2025_MAWS_585838_1
666/2025/E1
Open Tender
Civil Works - Buildings
Works
180 days
EDANGANASALAI MUNICIPAL OFFICE
REFER TENDER NOTICE
2 documents required · 2 mandatory
₹0
₹20,000
19 Feb 2026
26 Jul 2025
8 Aug 2025
26 Jul 2025
8 Aug 2025
26 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .