| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.4 LAccepted-AOC | 1 | Accepted-AOC ok | |
| 2 | 2₹10.4 L+₹5,520.69 (0.53%)Rejected-Finance | 2 | Rejected-Finance OK | |
| 3 | 3₹11.7 L+₹1.3 L (12.5%)Rejected-Finance | 3 | Rejected-Finance OK |
Tender Value
₹11.1 L
EMD Value
₹11,090
Closing Date
17 Mar 2022, 12:00 pmClosed
Executive Engineer, Karnal W/S Division, Karnal
o/o The Executive Engineer, Karnal W/S Division, The Mall Road Karnal
Construction of Bridge at RD 16290 of Bansa Minor.
2022_HRY_210973_3
No.1827-42/53M dated 28/02/2022
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
KARNAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹11,090
7 May 2022
8 Mar 2022
17 Mar 2022
8 Mar 2022
17 Mar 2022
8 Mar 2022
Amount
Works Details
Dismantling brick work, Tile masonry or Tile lining and Tile Terracing in cement including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORT&H specifications Ordinary soil by Mechanical means Depth upto 3 m including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR 15.1.2.1
Earth excavation in all kind of soil including all lead & lifts and all other allowances including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR No. 6.29.1
Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR No. 6.29.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded stone aggregate 20 mm nominal size) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item No.6.1.2
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 : 1 ½: 3 ( 1 Cement: 1 ½ coarse sand (zone-Ill) : 3 graded stone aggregate 20 mm nominal size) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item No.6.1.1
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item No.6.14.1
Brick work with common burnt clay non-modular bricks of class designation 10.5 in Foundation and plinth in: Cement mortar 1:3 (1 cement: 3 coarse sand) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and MoRT&H pecifications including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR No.27.51.3
Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR No. 9.57.2 (110mm Dia.)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc.complete in all respect above & below plinth level, Thermo-Mechanically Treated bars of grade Fe-500D or more including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR 6.33.6
Supplying and filling sand behind the structure including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Painting on concrete surface, Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1litre for 2 sqm including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR No 27.49
Supply and fixing of Sign Board including painting, letter writing, border and arrows etc. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Credit of material - Brick recovered after dismantling
The New Bala Sundri Co-op L&C Society Ltd
THE GURU KRIPA COOP L&C SOCIETY LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .