| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹3.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.1 Cr+₹14.8 L (3.76%)Rejected-AOC | ₹4.1 Cr+₹14.8 L (3.76%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.5 Cr+₹52.0 L (13.2%)Rejected-AOC | ₹4.5 Cr+₹52.0 L (13.2%) | L3 | Rejected-AOC L3 |
| 4 | L4₹4.5 Cr+₹60.6 L (15.4%)Rejected-AOC CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹4.5 Cr+₹60.6 L (15.4%) | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | - | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹5.9 Cr
EMD Value
₹11.9 L
Closing Date
26 Sept 2022, 2:00 pmClosed
SE IWC SRE
OFFICE OF THE SE IWC SRE
Restoration of Damaged work on E.Y.C. at k.m. 22.000 Gangroo Level Crossing and k.m. 27.200 Kalsia Level Crossing in Distt. Saharanpur for Year 2021-22
2022_UPIDC_729666_2
02/SE/SRE/2022-23
Open Tender
Civil Works
Item Rate
180 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹11.9 L
7 Nov 2022
20 Sept 2022
27 Sept 2022
20 Sept 2022
26 Sept 2022
20 Sept 2022
Amount
Earth work excavation in foundation in dry ordinary soil (loam clay or sand) i/c lift up to 1.50m and lead up ot 30m i/c back filling, watering and ramming of excavated earth i/c all cost of material, labour,t&P etc complete. (Per Cum)
E/W in filling for restoration of Bank i/c lead upto 1.00 Km i/c cost of all meterial , labour , t&p etc & proper completion of work.
Supply of 8 swg G.I. wire crates size 3.0x1.50x1.0 m with 15x15 cm sq. mesh with double kontted i/c cost of G.I. wire at site etc. (per No.)
Laying & Packing of Boulder in G.I. Wire crate of size 3.0x1.50x1.0m i/c tying of crate (Labour only)
Making C.C. Block in 1:3:6 with 20% plum of 1.50 x 1.50 x 0.90 m size i/c cost of all material, labour, T&P etc. i/c mechanical vibration, form work etc complete.
Centring & shuttering for C.C. work i/c cost of labour material T&P etc complete.
Centering and shuttering in special type of C.C. work i/c cost of material, labour, T&P etc complete.
Filling Gaps/ Jhirrie with shingle (4-40) mm size between C.C. blocks i/c cost of material, Labour etc comp. (Per Cum)
Laying C.C. Grouting in 1:1.5:3 c.m. over dry bolder i/c cost of material,T&P, Labour etc comp.
Supply Dry Boulder 20 to 40 kg. from Quarry to stacking yard i/c all cost of Boulder, labour, t&P etc.
Laying C.C. 1:2:4 with cement, sand & shingle i/c all cost of material, labour T&P etc complete. for proper completion of work.
Providing & Fixing M.S. Sheet 6 mm thick on Deck of Torrent croosing i/c All Cost Of Material Labour T&P etc Comp
Providing and laying Painting of Torrent crossing Gate by applying 1 coat of red oxide zinc chromate primer and 02 coat of high build black bituminous paint of standard make after proper cleaning, scrapping the surface i/c cost of material, all material, labour T&P and scoffolding bridges with proper safety arrangement as per required for proper completion of work.
Supply & Laying of Cement concrete with stone ballast size 10mm to 20mm in C.C. work (1:3:6) i/c all cost of labour , material T&P etc complete.
Ist class Brick work in 1:4 cement mortar i/c cost of material labour t&p etc for proper completion of work.
Cement pointing { struck deep} on brick masonry in 1:2 C.M i/c cost of material, labour T&P etc
S/Laying Dry Brick on edge Pitching in sand i/c preparation of sub grade and filling joints with local sand i/c all cost of material, labour, t&P etc complete.
M/S Construction Gallery
M/S ARUN CONSTRUCTION
M/S AJAY KUMAR
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .