| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.7 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L2₹24.7 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 4 | L2₹24.7 LSame as L1Rejected-Finance FARSAI THANA KADARBOUK DISTRICT BUDAUN UTTAR PRADESH | BUDAUN | BUDAUN | UTTAR PRADESH | L2 | Rejected-Finance L2 | |
| 5 | L2₹24.7 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹29.1 L
EMD Value
₹87,303
Closing Date
16 Feb 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Work of construction of interlocking tiles and drain near Ward-33 Bajaria police station.
2026_DOLBU_1113580_5
107/Nirman/2025-26 Date 16.01.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹87,303
5 Mar 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of Engineer-in-Charge.
Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200feet).
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1
S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 }
First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a)
12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM )
S/L C:C (1:2:4) with 20 mm stone grit, coarse sand & cement etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2022 279 ( a).
R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour, tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .)
Steel reinforcement for R.C.C work including straightening ,cutting ,bending,placing in position and binding all complete upto plinth level mild steel and medium tensile steel bars DSR 2023 ITEM N.5.22.1
Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. The earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 .(AS PER PWD SOR 2022/231( a)+253 (a) S I NO-4.03.
S/L of stone ballast 22.4 to 53 mm size with stacking for 10 measurment etc all complete as per the direction of engineer in-charge . AS PER PWD SOR 2020 RMR
Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR
Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1
Supply & laying 80 mm thick Precase cement concrete ishape interlocking paver block (Grey color) with top layer of minimum 8 mm thickness having plan dimension 00X(160+120mm) of O.P cement smoothing gloss finish,skid resistant manufacturered from rubber moulds M-30 GRADE AS PER SOR 2022.
Deduct of old bick Bats
Deduct of old Brick
Deduct of old Tiles
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2062269.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .