| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.9 LAccepted-AOC 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | SALEM | TAMIL NADU | 636456 | ₹10.9 L Quoted ₹9.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹10.2 LRejected-AOC 39 39 THANGAMAPURI PATTINAM METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | ₹10.2 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | LENIN ENGINEERING WORKS L1 | BHARATH ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Cutting the existing eroded straight coal pipe of length 10mtr after arresting both ends of the rest of the pipe at elevation 16 mtr by loading with chain block or hoist all along the pipe to be rotated and arresting the movement of the pipe to be rotated horizontally. | 15 | Nos | 17,780 ₹2.7 L | 18,900 ₹2.8 L |
| 2.00 | Rotating the cut straight coal pipe to 180º ( Bottom portion has to be brought to top portion vice versa ) from its original position by using hoist / winge ( Grane could not be utilized at this location. Since coal pipe are to be rotated are in mill area under the 18 mtr floor) to align the rest of the coal pipe ends without deviating the original position (ie) straightens. | 15 | Nos | 8,890 ₹1.3 L | 9,500 ₹1.4 L |
| 3.00 | Welding the rotated coal pipe after lifting to ( 16 mtr elevation ) original elevation to suit the rest of the pipe ends and removing the temporary supports and providing the supports already provided. | 15 | Nos | 11,480 ₹1.7 L | 12,600 ₹1.9 L |
| 4.00 | Charges for removing the existing damaged hanger supports assembly arrangements in the coal pipes | 40 | Assy | 2,121 ₹84,840 | 2,500 ₹1 L |
| 5.00 | Rectification of hanger support rod fixture eye, strengthening the pin and its nuts for assembly. | 40 | Assy | 2,121 ₹84,840 | 2,500 ₹1 L |
| 6.00 | Charges for re fixing the hanger supports arrangements in its original position of the coal pipes without changing its elevation for assembly. | 40 | Assy | 2,121 ₹84,840 | 2,500 ₹1 L |
| 7.00 | Cutting gas | 6 | sets | 3,635 ₹21,810 | 3,900 ₹23,400 |
| 8.00 | Cost of MS Welding electrodes | 160 | kgs | 440 ₹70,400 | 490 ₹78,400 |
| 9.00 | Charges for consumables and T& P’s. | 1 | LS | 3,490 ₹3,490 | 4,500 ₹4,500 |
Tender Value
Refer Docs
EMD Value
₹9,900
Closing Date
18 Aug 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit IV Coal flow system to boiler Rotating the existing eroded straight coal pipes of mills 4A 4B 4C 4D 4E 4F for 180 rotation at 16 meter level above the mill and below the 18 meter floor and Dismantling rectification
2025_EB_588409_1
CE / MTPS-I / SE / M-I / MP /OT.191/ 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹9,900
Yes
26 May 2026
4 Aug 2025
19 Aug 2025
4 Aug 2025
18 Aug 2025
4 Aug 2025
Amount
Cutting the existing eroded straight coal pipe of length 10mtr after arresting both ends of the rest of the pipe at elevation 16 mtr by loading with chain block or hoist all along the pipe to be rotated and arresting the movement of the pipe to be rotated horizontally.
Rotating the cut straight coal pipe to 180º ( Bottom portion has to be brought to top portion vice versa ) from its original position by using hoist / winge ( Grane could not be utilized at this location. Since coal pipe are to be rotated are in mill area under the 18 mtr floor) to align the rest of the coal pipe ends without deviating the original position (ie) straightens.
Welding the rotated coal pipe after lifting to ( 16 mtr elevation ) original elevation to suit the rest of the pipe ends and removing the temporary supports and providing the supports already provided.
Charges for removing the existing damaged hanger supports assembly arrangements in the coal pipes
Rectification of hanger support rod fixture eye, strengthening the pin and its nuts for assembly.
Charges for re fixing the hanger supports arrangements in its original position of the coal pipes without changing its elevation for assembly.
Cutting gas
Cost of MS Welding electrodes
Charges for consumables and T& P’s.
BHARATH ENGINEERING WORKS (BID ID -1431898)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid