| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC WARD NO 22 DADARKHURD DADAR NALA KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹5.5 L Quoted ₹4.6 L | L1 | Accepted-AOC Technically and Financially eligible L1 bidder |
| 2 | L2₹4.7 LRejected-Finance Q NO A 29 POWER CITY JAMNIPALI KORBA CG 495450 | KORBA | CHHATTISGARH | 495450 | ₹4.7 L | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L4₹5.3 LRejected-Finance KORBA | KORBA | CHHATTISGARH | 495119 | ₹5.3 L | L4 | Rejected-Finance Not L1 Bidder |
| 4 | L5₹5.0 LRejected-Finance WARD NO 51 BANKI MONGRA KORBA CG 495447 | KORBA | CHHATTISGARH | 495447 | ₹5.0 L | L5 | Rejected-Finance Not L1 Bidder |
| 5 | L5₹5.4 LRejected-Finance WARD NO 2 MALVIIYANAAGAR P O WEST CHIRIMIRI COLLIERY DISTT MCB CHHATTISGARH PIN 497773 | KOREA | CHHATTISGARH | 497773 | ₹5.4 L | L5 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | ANIRUDH KUMAR CHOUDHARY L2 | AMIT KUMAR CHATTERJEE L5 | SUBHASH CHANDRA VISHWAKARMA L3 | S.B Construction L4 | MK Associates L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Civil Works | ||||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 953.8 | Cum | 110 ₹1.0 L | 91.8 ₹87,558.84 | 80 ₹76,304 | 85 ₹81,073 | 70 ₹66,766 |
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 38,126 | sqm | 3.2 ₹1.2 L | 4.15 ₹1.6 L | 3.8 ₹1.4 L | 4.5 ₹1.7 L | 4 ₹1.5 L |
| 1.03 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth | 111 | each | 1.25 ₹138.75 | 161.87 ₹17,967.57 | 100 ₹11,100 | 98 ₹10,878 | 150 ₹16,650 |
| 1.04 | Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand ) | 40.45 | Cum | 2,900 ₹1.2 L | 2,908.59 ₹1.2 L | 3,500 ₹1.4 L | 3,300 ₹1.3 L | 3,000 ₹1.2 L |
| 1.05 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) | 534.58 | sqm | 140 ₹74,841.20 | 141.27 ₹75,520.12 | 150 ₹80,187 | 140 ₹74,841.20 | 120 ₹64,149.60 |
| 1.06 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1cement : 2coarse sand : 4graded stone aggregate 20 mm nominal size) | 18.69 | cum | 2,850 ₹53,266.50 | 4,250 ₹79,432.50 | 2,500 ₹46,725 | 3,300 ₹61,677 | 2,200 ₹41,118 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - | - |
Tender Value
₹12.7 L
EMD Value
₹15,900
Closing Date
7 Mar 2026, 5:00 pmClosed
Staff Officer Civil SECL Korba Area
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Cleaning of garland drain inside mine premises at Dhelwadih, Bagdewa and Singhali UG Mine of DSB Sub Area of Korba Area
2026_SECL_354315_1
SECL/GM/C/eTender/25-26/150 Dt24.02.2026
Open Tender
Civil Works - Others
45 days
Office of General Manager SECL Korba Area
As per NIT
3 documents required · 3 mandatory
₹15,900
8 Apr 2026
24 Feb 2026
9 Mar 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
25 Feb 2026 - 28 Feb 2026
Civil Works
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth
Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1cement : 2coarse sand : 4graded stone aggregate 20 mm nominal size)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_367242.pdf
finsummary_367242.pdf
aoc.pdf
finance_367242.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 1.36 MB
Tendernotice_3.pdf
PDF • 0.07 MB
BOQ_367242.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid