| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAccepted-Finance | ₹39.5 L | L1 | Accepted-Finance as per financial evaluation |
| 2 | L2₹39.6 LRejected-Finance | ₹39.6 L | L2 | Rejected-Finance as per financial evaluation |
| Sl No | Description | Qty | Unit | A.Panneer Selvam L1 | SKP AND CO L2 |
|---|---|---|---|---|---|
| 1.00Providing CC Pavement (298m) from Yercaud main road to Maariyamman kovil at Kondappanaickenpatty H/O Kondappanaickenpatty | |||||
| 2.00 | Earth work Excavation in all soils & Sub Soil to full
depth as may be directed except in hard rock
requiring blasting but inclusive of shoring strutting,
Sectioning the street to lay concrete pavement per
SS 20 B. | 35.76 | cum | 131 ₹4,684.56 | 134 ₹4,791.84 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG
metal for foundation including watering wherever
necessary and laid in layers of not more than 15cm
thick., compacting etc., complete | 165.09 | cum | 5,479 ₹9.0 L | 5,485 ₹9.1 L |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,.
complete | 357.6 | sqm | 547.5 ₹2.0 L | 555 ₹2.0 L |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two
M.Sand and four hard broken stone jelly) using
20mm jelly for wearing coat including laying,
compacting, finishing and curing, etc., complete as
per standard specificatins and as directed by the
departmental officers. | 161.81 | cum | 6,771.9 ₹11.0 L | 6,775 ₹11.0 L |
| 6.00 | Provision for Bitumen pad | 44.7 | sqm | 234.3 ₹10,473.21 | 235 ₹10,504.50 |
| 7.002.Construction of CC drainage (210m) from Vali house to Kuppayee house at Ayyan nagar H/o Kondappanaickenpatty | |||||
| 8.00 | Earth work excavation for foundation in all soils and
sub soils to full depth etc., ordinary soil complete | 154.08 | cum | 197.84 ₹30,483.19 | 200 ₹30,816 |
| 9.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand
and eight hard broken stone jelly) using 40 mm
gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid inlayers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 25.68 | cum | 5,477 ₹1.4 L | 5,480 ₹1.4 L |
| 10.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs,staircase steps, bed blocks, critical pier etc,.
complete | 648.5 | sqm | 547 ₹3.5 L | 550 ₹3.6 L |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
28 Feb 2026, 3:00 pmClosed
S.Karthikeyan
BDO VP Salem
Salem Block - Peri Urban (Panchayat Fund) 2025-26 - Providing CC Pavement (298m) and Construction of CC Driainage (210m) H/o Kondapanayakkanpatty
2026_RDTN_663972_1
533-2026-T3
Open Tender
Civil Works
BDO Office
as per document
3 documents required · 3 mandatory
₹0
₹80,000
Yes
7 Mar 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
Providing CC Pavement (298m) from Yercaud main road to Maariyamman kovil at Kondappanaickenpatty H/O Kondappanaickenpatty
Earth work Excavation in all soils & Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,. complete
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Provision for Bitumen pad
2.Construction of CC drainage (210m) from Vali house to Kuppayee house at Ayyan nagar H/o Kondappanaickenpatty
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid inlayers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs,staircase steps, bed blocks, critical pier etc,. complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators,finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
Techdoc.pdf
Tender Documents • 0.79 MB
BOQ_797231.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid