| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹5.2 L (5.00%)Admitted-Finance 4 14 A LEMBALAKUDDI PUDUKKOTTAI DISTRICT | PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | ₹1.1 Cr+₹5.2 L (5.00%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.GANESAN L2 | SELVARAJ A L1 |
|---|---|---|---|---|---|
| 1.001 Deepening of Ayyanarkoil Oorani and Construction of Bathing ghat , Baby pond and Lining wall @ Arasur in Thiruvakkudi Panchayat | |||||
| 1.01 | Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification | 90 | Sqm | 5.3 ₹477 | 5.05 ₹454.5 Lowest |
| 1.02 | Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete | 1,366.64 | Cum | 52.5 ₹71,748.6 | 50 ₹68,332 Lowest |
| 1.03 | Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation. | 1,353.14 | Cum | 12.6 ₹17,049.56 | 12 ₹16,237.68 Lowest |
| 1.04 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification. | 18.24 | Cum | 202.86 ₹3,700.17 | 193.2 ₹3,523.97 Lowest |
| 1.05 | Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications. | 3.15 | Cum | 1,933.56 ₹6,090.71 | 1,841.49 ₹5,800.69 Lowest |
| 1.06 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 8.55 | Cum | 5,169.29 ₹44,197.43 | 4,923.13 ₹42,092.76 Lowest |
| 1.07 | Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer. | 48.65 | Sqm | 439.43 ₹21,378.27 | 418.5 ₹20,360.03 Lowest |
| 1.08 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 32.25 | Cum | 6,596.36 ₹2,12,732.61 | 6,282.25 ₹2,02,602.56 Lowest |
| 1.09Leading Channel and Lining wall in Baby Pond | |||||
Tender Value
₹1.0 Cr
EMD Value
₹1.1 L
Closing Date
29 Jul 2022, 3:00 pmClosed
Project Director,
DRDA, Pudukkottai
Deepening and Improvements to the Ooranies_13 nos. in AGAMT-II-2021-22 Village panchayats of Arimalam Block in Pudukkottai District in Package no.13
2022_RDTN_243500_1
PUDUKKOTTAI DISTRICT - AGAMT II - 2021-2022
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
Yes
23 Aug 2022
23 Jul 2022
29 Jul 2022
23 Jul 2022
29 Jul 2022
23 Jul 2022
Amount
1 Deepening of Ayyanarkoil Oorani and Construction of Bathing ghat , Baby pond and Lining wall @ Arasur in Thiruvakkudi Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
2. Deepening of Pillaiyarkoil Oorani and Construction of Bathing ghat and Lining wall @ Vellavayal in Thiruvakkudi Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
3. Desilting of Nambi Oorani and Construction of Bathing ghat, Lining wall and Inlet @ K.Rayavaram in K.Rayavaram Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
4. Deepening of Sunaiyandankanmai and Construction of Weir, Bathing ghat at Kannankarakkudi in Kannankarakkudi Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Bathing ghat
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Dismantling with out damaging the near by structures if any, clearing away and carefully stacking materials useful for reuse for any thickness of wall in brick masonry in cement mortar wall under 3m High as directed by the Engineer in charge of the works as per technical Specification. (B14)
Dismantling with out damaging the near by structures if any, clearing away Plain cement concrete as directed by the Engineer in charge of the works as per technical Specification. (B-35)
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
5. Deepening of PillaiyarkoilOorani and Construction of Bathing ghat, Inlet, and Outlet @ KeelaThemuthupatti in Thekkattur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet and Outlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
6. Desilting of Thulukkan Oorani and Construction of Lining wall, Inlet 2 Nos and Retaining wall (13.50m) @ Melathemuthupatti in Thekkattur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Retaining wall
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
7. Deepening of KarupparkoilOorani and Construction of Bathing ghat, Inlet and Outlet @ Namanasamuthiram Kudieruppu in Thekkattur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet and Outlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
8. Deepening of Mathu Eduppu Oorani and Construction of Bathing ghat and Lining wall @ Kummangudi in Kummangudi Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
9. Deepening of Kallukuli Oorani and Construction of Bathing ghat and Lining wall @ Thallampatti in Kummangudi Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
10. Deepening of SengaiOorani and Construction of Bathing ghat, Inlet and Outlet @ Kanapettai in Kadiyapatti Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet and Outlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
11. Deepening of Naripitchankundu Oorani and Construction of Lining wall and Inlet @ Kadiyapatti Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
12. Deepening of Nanthini Oorani and Construction of Bathing ghat and Lining wall @ Valaramanickam in Valaramanickam Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
13. Deepening of VannanThoppi Oorani and Construction of Bathing ghat and Lining wall @ Valaramanickam in Valaramanickam Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.GANESAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
13_Tech.pdf
Tender Documents • 0.64 MB
BOQ_287823.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .