Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-Finance | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.4 L+₹1,400 (1.03%)Accepted-Finance BAHU FORT BAZIGAR BASTI JAMMU | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹1.4 L+₹1,850 (1.36%)Accepted-Finance | 3 | Accepted-Finance Found Eligible |
Tender Value
₹1.4 L
EMD Value
₹2,760
Closing Date
19 Jan 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, MID Akhnoor Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Upgradation of damaged foundation blocks of pumping unit no. 1 with other allied works And Providing/fitting/installation and commissioning of A630-Volt HRC (High Rupturing Capacity) main switch at LIS Manda 2nd.
2024_IFC_242667_1
MID/AN/128
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
10 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer, MID Akhnoor Nowshera
₹2,760
Yes
Office of Executive Engineer, MID Akhnoor Nowshera
23 Jan 2024
11 Jan 2024
20 Jan 2024
11 Jan 2024
19 Jan 2024
12 Jan 2024
12 Jan 2024
. The job involves demounting the pumping machinery from the bed plate after removing the pump, motor, electric connections, coupling pulleys, suction and delivery pipes and finally removing the base frame. Breaking the damaged RCC foundation blocks with the help of chisel, concrete cutter, electric jack hammer, tools/tackles. Cutting of steel members with the help of cutter stepwise during the process of breaking the RCC block and stacking. Completely removal of broken concrete, soil and TMT bars from pump room in such way that the machinery and electric equipment’s of other pumping machinery are not damaged /effected. Disposal of salvage/debris of dismantled foundation away from pump room to such a place where irrigation land and water source is not polluted. Laying of new RCC foundation of size – 7ft length x 3ft width x 4.0 ft depth for leveling by way of making surface even for laying of new RCC foundation blocks for pumping unit no. 01. Fabrication of steel mesh out of 10 mm TMT bars members placed vertically and horizontally at equidistance of 6 inches. Placing of fabricated iron mesh in RCC foundation and leveling /aligning. The job also involve welding of 6 nos foundation bolts with the steel mesh as per the foundation block requirement not less than 2.5 feet in depth. The job involves laying of RCC foundation block by filling the concrete in the ratio of 1:1.5:3. Fabrication and grouting of 8 no. foundation bolts of size 3 ft in RCC foundation block. The job further involves laying of RCC foundation blocks of size 7 ft x 3 ft for pumping unit no. 01 by filling the concrete in the ratio of 1:1.5:3.The size of the block above the ground level should be of original size and alignment in respect of suction and delivery pipes. The block shall be filled with rich mixture of concrete with using vibrator for compaction. The entire block as one unit is to be laid in such a way that it can damp all types of mechanical vibrations created by dynamic load of pumping unit without causing any defect to the pumping unit as well as to the block itself. Fixing of the base frames of both the units after leveling and fastening with foundation bolts. It further includes fastening of the suction and delivery pipes by providing and welding of the flanges ,nuts, bolts and rubber sheets The Complete job includes Fabrication of steel mesh out of 10 mm TMT bars members placed vertically and horizontally, shuttering charges, charges for concrete mixture , vibrator charges and labour charges of skilled as well as semi skilled labour , curing charges. Complete Job.
Providing/fitting/installation and commissioning of A630-Volt HRC (High Rupturing Capacity) main switch is designed to handle high voltage and to provide protection against over currents. HRC fuses within the switch are design to brake the circuit under high fault currents prevent damage to the system. Switch should be turned ON and OFF manual lever with construction material metal or combination and also compliance with relevant standards and certifications for electrical safety. The job also involve providing of mounting hardware such as nuts and bolts and other components used to mount the switch securely. The complete Job include cost of skilled labour and semi-skilled labour and fitment charges. complete Job
M/S HITAISHI ELECTRICALS AND MECHANICAL WORKS
ROYAL ENGINEERING ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .