SE,EDC-IV,LESA-CISS GOMTI,MVVNL
4/82-83, INDERLOK HYDEL COLONY, KRISHNANAGAR, LUCKNOW
Construction of 11 line at Naryanpur Old feeder feeded by 33/11 KV sub Station Sarosa against deposit scheme under Jurisdiction OF E.E., EDD, CESS-II, CISS GOMTI, LESA, Lucknow
2020_MVVNL_457312_1
142/EDC-IV/LESA/2019-20
Open Tender
Electrical Works
Fixed-rate
90 days
CISS GOMTI, LESA
as per tender document
2 documents required · 2 mandatory
₹1,180
A/C-1444100402,IFSC Code-CBIN0280139
₹10,000
27 Apr 2020
7 Apr 2020
16 Apr 2020
7 Apr 2020
16 Apr 2020
7 Apr 2020
Amount
Safe Loading, Carriage & unloading of following Materials from Centre Store to Pit Site/J.E. Dump Store.
a- Line Material
b- ST Pole 11/9 Mtr. Long
c- 11 KV VCB
d- 11 KV XLPE Cable 3x120 sq. mm.
Fabrication, erection of double pole for end terminations/sectional double pole, 11 KV line on ST/PCC Pole with fixing of necessary clamps & other accessories like 1 nos top channel 100x50 mm 2.24 m. 1 No. Guarding Angle. Its grouting in ratio 1:4:8 plinthing 300 mm above ground level, earthing of support & one side cable expose.
Grouting & Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand, Brick blast & cement). All material except stay wire shall be supplied by the contractor.
Ordinary earthing by 11 KV MS earth Rod 2500mm long as per RESPO Schedule. All material except earthing wire shall be supplied by the contractor.
Laying of 11 KV 3x120 sq. mm XLPE cable double circuit digging of trench 1050 mm deep, 750 mm side including supply of required material, 1st class bricks, stone pad & fine sand. The inter spacing between two cable should be in between 0.25 m to 0.40m. The cables shall be laid in trench by first filling layer of sand and laying on sides with bricks, fixing bricks as partitions between two cables, after laying cable, covering cable by stone pads resting on bricks, covering it by earth, all work as per RESPO norms. (Allmaterial required for laying will be supplied by the contractor except 11 KV XLPE cable). One length cable-1600 Mtr Total length 3200 Mtr.).
Laying of 3X120 sq.mm 11 KV XLPE cable by drill method as per RESPO Norms. Only 11 KV XLPE cable supplied by Department.
Cable Hosting of 11 KV 3x120 sq. mm XLPE Cable at the following including jumpering etc complete with help of GI Pipe as Per RESPO Norms. GI pipe and other required material shall be supplied by contractor.
High pressure testing of 11 KV 3x120 XLPE cable along with arrangement of High Pressure equipment.
Commissioning of 11 KV O/G FDR VCB at 33/11 KV S/S including connection with, Busbar its Empire tap, PVC tap after grouting 2 No. Channel 75x40 mm 0.90 M lag its commissioning after taking proper S/D.
Well type earthing of with 60 Fit Deep borring and providing GI Pipe 1.5" dia ("B" Class) and earthing must be joint by G.I. Strip of 32x5 mm thick long attached with nut & bolts and GI pipe cap. All material and labour shall be supplied the contractor.
GST Extra as per Rules
B.N. ENTERPRISES
BALAJI BHAGWATI ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .