Tender Value
₹9.0 Cr
EMD Value
₹18.0 L
Closing Date
2 Sept 2026, 6:00 pm7d left
Superintending Engineer WR circle nohar
Superintending Engineer WR circle nohar
Renovation of badbirana minor of raslana distributary of sidhmukh nohar irrigation project
2026_WRDAS_587420_1
NIB 01/2026-27
Open Tender
Civil Works
Percentage
Nohar
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
executive engineer wrd nohar
₹18.0 L
Yes
Superintending Engineer WR circle nohar
14 Aug 2026
14 Aug 2026
3 Sept 2026
14 Aug 2026
2 Sept 2026
14 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Section: Part-1 Earthwork section | |||||
| 1.1 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In ordinary soil Depth upto 3 metre Depth upto 3 metre | 806.23 | Cum | 190 | ₹1,53,183.7 |
| 2 | Carriage of Bats Ballast, Kankar, Sand, Bajri, Stone, Grit, Murram, Soling Stones For Road, Water, Good Earth. 4.3.2 1 KM | 14,658.76 | Per Cubic Meter | 49.5 | ₹7,25,608.62 |
| 3 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 5.1.1.1 30 Cm. to below 60 Cm. Girth | 420 | Each | 200 | ₹84,000 |
| 4 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 5.1.1.2 60 Cm. to below 120 Cm. Girth | 370 | Each | 905 | ₹3,34,850 |
| 5 | Uprooting Juli Flora /sarkanda 5.1.5.2 Uprooting Juli Flora /sarkanda, pahari kikar or arrows upto 0.50m. depth below ground level. | 1,08,000 | Per Square Meter | 6.75 | ₹7,29,000 |
| 6 | 6.10 Compaction of earthwork by mechanically operated Vibro-Compactor/ any other mechanical means to attain a density 95% of Maximum Dry Density. | 6,007.5 | Per Cubic Meter | 44 | ₹2,64,330 |
| 7 | Dressing of earthwork. | 14,933.59 | Per Cubic Meter | 1.3 | ₹19,413.67 |
| 8 | Earth work excavation in ordinary soil for distributaries and minors having discharge less than 10 cumecs; 6.3.1 Kassi work undressed. | 20,941.09 | Per Cubic Meter | 42.5 | ₹8,89,996.33 |
| 9 | Earth work excavation in ordinary soil for distributaries and minors having discharge less than 10 cumecs; 6.3.2 Earthwork undressed with combined lead upto 50m. | 20,618.87 | Per Cubic Meter | 55 | ₹11,34,037.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_1043329.xls
BOQ • 0.34 MB
niB.pdf
Tender Documents • 0.37 MB
bid.pdf
Other Document • 5.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].