Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
23 May 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Municipal commsioner
Municipal office Theni
Maintance and repair of the Distribution main and pumping main at Ward 1 to 33Theni-Allinagram Municipal Premises
2025_MAWS_560363_1
462/2005/E2
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
Thein
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,000
23 May 2025
22 May 2025
23 May 2025
22 May 2025
23 May 2025
22 May 2025
Amount
Removing the burts P.V.C. Pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refiling the of pipe with water for retesting the pipe line and the demaged portion of PVC pipes are joint by good quality coupler with proper solution and also the rate including cost for the removal and relaying of upto 3.00m PVC pipes etc. complete and as directed by the Municipal Engineer. a) 90mmm dia (OD) PVC Pipe
Removing the burts P.V.C. Pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refiling the of pipe with water for retesting the pipe line and the demaged portion of PVC pipes are joint by good quality coupler with proper solution and also the rate including cost for the removal and relaying of upto 3.00m PVC pipes etc. complete and as directed by the Municipal Engineer. b) 110mm dia (OD) PVC Pipes
Removing the burts P.V.C. Pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refiling the of pipe with water for retesting the pipe line and the demaged portion of PVC pipes are joint by good quality coupler with proper solution and also the rate including cost for the removal and relaying of upto 3.00m PVC pipes etc. complete and as directed by the Municipal Engineer. c)140mm to 160mm dia (OD) PVC Pipes
Removing the burts A.C. Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculding cost of sound pipe and jointing materials and including cost of earth work and refilling) and as directed by the Municipal. a) 200mm dia A.C. Pipes
Removing the burts A.C. Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculding cost of sound pipe and jointing materials and including cost of earth work and refilling) and as directed by the Municipal. As per TWAD SOR 2024-25 pg no : 179 b) 250mm dia A.C. Pipes
Removing the burts A.C. Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculding cost of sound pipe and jointing materials and including cost of earth work and refilling) and as directed by the Municipal. c) 150mm dia A.C. Pipes
Removing the burts C.I.Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculsing cost of sound pipeand jointing materials and including cost of earth work and refilling) and as directed by the Municipal Officers. a) 250mm dia C.I. pipes
Removing the burts C.I.Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculsing cost of sound pipeand jointing materials and including cost of earth work and refilling) and as directed by the Municipal Officers..b) 200mm dia C.I. pipes
Removing the burts C.I.Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculsing cost of sound pipeand jointing materials and including cost of earth work and refilling) and as directed by the Municipal Officers.c) 125mm dia C.I. pipes
Removing the burts C.I.Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculsing cost of sound pipeand jointing materials and including cost of earth work and refilling) and as directed by the Municipal Officers. d) 100mm dia C.I. pipes
Cleaing the OHT 2.00 Lakhs (Labour charge only)
Cleaing the OHT 4.50 Lakhs (Labour charge only)
Cleaing the OHT 5.00 Lakhs (Labour charge only)
Cleaing the OHT 6.00 Lakhs (Labour charge only)
Cleaing the OHT 6.75 Lakhs (Labour charge only)
Cleaing the OHT 10.00 Lakhs (Labour charge only)
Removing the burts D.I.Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculsing cost of sound pipeand jointing materials and including cost of earth work and refilling) and as directed by the Municipal Officers. a) 250mm dia D.I. pipes
Removing the burts D.I.Pipes from the pipeline and removal of slushysoil and baling out water and replacing the pipe line with sound pipe line etac., complete (exculsing cost of sound pipeand jointing materials and including cost of earth work and refilling) and as directed by the Municipal Officers. b) 300mm dia D.I. pipes
Removing the burts HDPE Pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including cost of additional earthwork excavation in all soils, including BT cutting, CC roads , removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of HDPE pipes, couplers, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete a) 200mm dia HDPE pipes
Removing the burts HDPE Pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including cost of additional earthwork excavation in all soils, including BT cutting, CC roads , removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of HDPE pipes, couplers, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete b) 160mm dia HDPE pipes
Removing the burts HDPE Pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including cost of additional earthwork excavation in all soils, including BT cutting, CC roads , removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of HDPE pipes, couplers, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete c) 140mm dia HDPE pipes
Removing the burts HDPE Pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including cost of additional earthwork excavation in all soils, including BT cutting, CC roads , removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of HDPE pipes, couplers, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete d) 110mm dia HDPE pipes
Removing the burts HDPE Pipe from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including cost of additional earthwork excavation in all soils, including BT cutting, CC roads , removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of HDPE pipes, couplers, jointing materials and required specials, cutting, threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete e) 90mm dia HDPE pipes
Lead wood
white cement
200mm dia CID Joint
250mm dia CID Joint
Bolt and nuts
150mm dia CID Joint
100mm dia CID Joint
110mm dia PVC Pipe
110mm dia PVC Coupler
110mm dia PVC Elbow
110mm dia HDPE pipe
110mm dia PVC End cap
200mm dia PVC Pipe
180mm dia PVC Pipe
160mm dia PVC Pipe
160mm dia PVC Coupler
Rectification of followings Valves including changing check nuts, Threading, all materials, labour and all cost and conveyance etc complete. 100mm dia Valve
Rectification of followings Valves including changing check nuts, Threading, all materials, labour and all cost and conveyance etc complete. 125mm dia Valve
Rectification of followings Valves including changing check nuts, Threading, all materials, labour and all cost and conveyance etc complete. 150mm dia Valve
Rectification of followings Valves including changing check nuts, Threading, all materials, labour and all cost and conveyance etc complete. 250mm dia Valve
N.Velmurugan (BID ID -1348714)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .