Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-Finance | ₹13.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹14.3 LAccepted-Finance 71 NORTH STREET VILLUPURAM | VILLUPURAM | TAMIL NADU | 604001 | ₹14.3 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | BALAGURU L1 | N Sundarrajan and Co L2 |
|---|---|---|---|---|---|
| 1.00Hiring the JCB for clearing the heavy jungle including all labour charges, fuel charges loading unloading charges etc.,.complete as directed by departmental officers. | |||||
| 2.00 | JCB | 40 | Hrs | 950 ₹38,000 | 2,000 ₹80,000 |
| 3.00 | Poclain | 40 | Hrs | 2,544 ₹1.0 L | 2,600 ₹1.0 L |
| 4.00 | Hiring charges for Transportation to site including cost and conveyan and labour charges and complete etc. at site. (LR). | 15 | Trip | 2,400 ₹36,000 | 2,400 ₹36,000 |
| 5.00 | Supply and delivery of HDPE pipes 200 mm/ PN.8/HDPE Pipe ‘ISI’(PE 100 Grade) for sewerage PE 100 PN 8 conforming to IS : 14333/1996 (amended in 2009) | 520 | Rm | 1,494 ₹7.8 L | 1,494 ₹7.8 L |
| 6.00 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers | 520 | Rm | 36.29 ₹18,870.80 | 36.29 ₹18,870.80 |
| 7.00 | Refilling with excavated soil (other than sand) complying with the standard specification for filling in foundation and basement | 520 | Rm | 38.97 ₹20,264.40 | 38.97 ₹20,264.40 |
| 8.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 18 | Cum | 2,578 ₹46,404 | 2,578 ₹46,404 |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 4.5 | Cum | 5,457.8 ₹24,560.10 | 5,457.8 ₹24,560.10 |
| 10.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 4.5 | Cum | 6,925.4 ₹31,164.30 | 6,925.4 ₹31,164.30 |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
6 Jan 2026, 3:00 pmClosed
COMMISSIONER VILLUPURAM MUNICIPALITY
COMMISSIONER VILLUPURAM MUNICIPALITY
Providing new UGSS Sewerage Pumping main line at Earikarai Road
2026_MAWS_639364_2
0126/2025/E4
Open Tender
Civil Works
30 days
Villupuram Municipality
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹14,000
30 May 2026
5 Jan 2026
6 Jan 2026
5 Jan 2026
6 Jan 2026
5 Jan 2026
Hiring the JCB for clearing the heavy jungle including all labour charges, fuel charges loading unloading charges etc.,.complete as directed by departmental officers.
Poclain
Hiring charges for Transportation to site including cost and conveyan and labour charges and complete etc. at site. (LR).
Supply and delivery of HDPE pipes 200 mm/ PN.8/HDPE Pipe ‘ISI’(PE 100 Grade) for sewerage PE 100 PN 8 conforming to IS : 14333/1996 (amended in 2009)
Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers
Refilling with excavated soil (other than sand) complying with the standard specification for filling in foundation and basement
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means
Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means
Supply of DUCTILE IRON CLASS PN10 FLANGED PIPES AS PER IS 8329/2000 2 m length of pipes including all cost materials, conveyance labours etc., complete.
Supply of DUCTILE IRON CLASS PN10 FLANGED PIPES AS PER IS 8329/2000 100mm - 200 mm dia including all cost materials, conveyance labours etc., complete.
GST. 18% (CGST-9%, SGST-9%)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_765415.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid