| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAdmitted-Finance GOA | NORTH GOA | GOA | 403524 | ₹7.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.6 CrAdmitted-Finance | ₹7.6 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | D K BHOMKAR L1 | GAJ CONSTRUCTION PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00CIVIL WORKS | |||||
| 1.01 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 2 | 100 sq.m | 522.9 ₹1,045.80 | 537.84 ₹1,075.68 |
| 1.02 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil | 502 | cu.m | 300.3 ₹1.5 L | 308.88 ₹1.6 L |
| 1.03 | Earthwork in excavation in trenches for all leads & lifts in all type of strata comprising of any type of materials either in full or part as the case may be adopting any method/methods as may be convenient as permitted excluding blasting in all conditions such as dry, moist, foul, saturated, submerged, etc,. including dressing of sides, planking & strutting, timbering ,ramming of bottom ,pumping and bailing out water ,barricading danger lighting guarding, getting out excavated soil & stacking as directed by Engineer for all leads & lifts etc. complete | 333 | cu.m | 345.45 ₹1.2 L | 355.52 ₹1.2 L |
| 1.04 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer . | 159 | cu.m | 257.25 ₹40,902.75 | 264.6 ₹42,071.40 |
| 1.05 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. Moorum | 525 | cu.m | 695.1 ₹3.6 L | 714.96 ₹3.8 L |
| 1.06 | Disposal of unserviceable materials such as laterite stones, bricks, cement concrete, scrap materials, excess earth by tipper truck or as directed by Engineer in charge including loading, transportation, unloading, levelling etc at the risk and cost of agency / contractor including selection of site for disposal with all lifts and leads etc. all complete. | 976 | cu.m | 418.95 ₹4.1 L | 430.92 ₹4.2 L |
| 1.07 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 157 | cu.m | 2,321.55 ₹3.6 L | 2,387.88 ₹3.7 L |
| 1.08 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All work up to Plinth level | 91 | cu.m | 7,150.5 ₹6.5 L | 7,354.8 ₹6.7 L |
| 1.09 | Providing and laying in position ready mixed concrete (RMC) manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continious agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level. M-30 grade of concrete | 201 | cu.m | 9,317.7 ₹18.7 L | 9,583.92 ₹19.3 L |
Tender Value
₹8.3 Cr
EMD Value
₹16.6 L
Closing Date
20 May 2026, 3:00 pmClosed
Executive Engineer
Paryatan Bhavan pato Panaji Goa
Development and Beautification of Sabhamandap of Shree Sateri Pissani Temple at Kalsai Kirlapal Dabal Dharbandora Goa
2026_GTDCL_29136_1
GTDC/PC/EE(S)/2026-27e-20
Open Tender
Civil Works
365 days
Paryatan Bhavan pato Panaji Goa
Please refer Tender documents.
7 documents required · 7 mandatory
₹20,000
₹16.6 L
27 May 2026
7 May 2026
21 May 2026
7 May 2026
20 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1CIVIL WORKS | ||||||
| 1.01 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 2 | 100 sq.m | - | - | 18% |
| 1.02 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil | 502 | cu.m | - | - | 18% |
| 1.03 | Earthwork in excavation in trenches for all leads & lifts in all type of strata comprising of any type of materials either in full or part as the case may be adopting any method/methods as may be convenient as permitted excluding blasting in all conditions such as dry, moist, foul, saturated, submerged, etc,. including dressing of sides, planking & strutting, timbering ,ramming of bottom ,pumping and bailing out water ,barricading danger lighting guarding, getting out excavated soil & stacking as directed by Engineer for all leads & lifts etc. complete | 333 | cu.m | - | - | 18% |
| 1.04 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer . | 159 | cu.m | - | - | 18% |
| 1.05 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. Moorum | 525 | cu.m | - | - | 18% |
| 1.06 | Disposal of unserviceable materials such as laterite stones, bricks, cement concrete, scrap materials, excess earth by tipper truck or as directed by Engineer in charge including loading, transportation, unloading, levelling etc at the risk and cost of agency / contractor including selection of site for disposal with all lifts and leads etc. all complete. | 976 | cu.m | - | - | 18% |
| 1.07 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 157 | cu.m | - | - | 18% |
| 1.08 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All work up to Plinth level | 91 | cu.m | - | - | 18% |
| 1.09 | Providing and laying in position ready mixed concrete (RMC) manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continious agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level. M-30 grade of concrete | 201 | cu.m | - | - | 18% |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 0.37 MB
Tendernotice_3.pdf
PDF • 0.53 MB
Tendernotice_4.pdf
PDF • 0.65 MB
Tendernotice_5.pdf
PDF • 1.43 MB
Tendernotice_6.pdf
PDF • 0.77 MB
BOQ_29569.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid