Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹6.4 L (4.44%)Rejected-Finance BALLIA UTTAR PRADESH | BALLIA | UTTAR PRADESH | 221701 | ₹1.5 Cr+₹6.4 L (4.44%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹1.5 Cr+₹10.6 L (7.38%)Rejected-Finance | ₹1.5 Cr+₹10.6 L (7.38%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹1.7 Cr+₹28.3 L (19.8%)Rejected-Finance | ₹1.7 Cr+₹28.3 L (19.8%) | L4 | Rejected-Finance Not L1 |
| 5 | L5₹1.9 Cr+₹43.2 L (30.2%)Rejected-Finance | ₹1.9 Cr+₹43.2 L (30.2%) | L5 | Rejected-Finance Not L1 |
Tender Value
₹1.3 Cr
Closing Date
21 May 2021, 6:00 pmClosed
COMMANDER WORKS ENGINEERS NO.2, SECUNDERABAD
COMMANDER WORKS ENGINEERS NO.2, SECUNDERABAD
PROVN OF SEWAGE TREATMENT PLANT AT MKD LINES IN ARTY CENTRE HYDERABAD UNDER GE GOLCONDA
2021_MES_416003_3
81017/E8
Open Tender
Civil Works
Lump-sum
270 days
HYDERABAD
As per tender documents
6 documents required · 6 mandatory
₹1,000
GE GOLCONDA, HYDERABAD
Exempted
21 Jun 2021
29 Apr 2021
24 May 2021
29 Apr 2021
21 May 2021
29 Apr 2021
Amount
Schedule 'A' Part I (STP) Lumpsum price worked out by the tenderer for CONSTRUCTION, INSTALLATION, TESTING AND COMMISSIONING OF SEWAGE TREATMENT PLANT OF 150 KLD all as descripted in Schedule ‘A’ Part-I.
Lumpsum price worked out by the tenderer for SITE CLERANCE AND LAND DEVELOPMENT as listed in Schedule ‘A’ Part-II
Lumpsum price worked out by the tenderer for ROAD, PATH, CULVERT, HARD STANDING as listed in Schedule ‘A’ Part-III
Lumpsum price worked out by the tenderer for SEWAGE DISPOSAL as listed in Schedule ‘A’ Part-IV
Lumpsum price worked out by the tenderer for PUMP HOUSE BLDG/OPERATOR ROOM as listed in Schedule ‘A’ Part-V
Lumpsum price worked out by the tenderer for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-VI
Lumpsum price worked out by the tenderer for EXTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-VII
Lumpsum price worked out by the tenderer for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-VIII
Supply, install, testing & commissioning, factory assembled, silent Diesel Engine driven generating set, to give an output of 20 kVA all as per Srl Item No. 1 of Sch 'A' Part- IX DG Set
Earthing with GI steel strip 25x4 mm all as per Srl Item No. 2 of Sch 'A' Part- IX DG Set
Earth continuity conductor with GI steel strip 25x4 mm all as per Srl Item No. 3 of Sch 'A' Part- IX DG Set
SCHEDULE 'A' PART - X (MISCELLANEOUS ITEMS) S&F LED bulb 10W AC 240V Complete all specified and directed. Make : Philips, CG, Bajaj, Wipro
S&F MCB SPN, 240 Volts, AC 6-32 Amps all as specified and directed.
S&F MCB SP, 240 Volts, AC 6-32 Amps all as specified and directed.
S&F LED Building security lights New generation energy saving & enviromental friendly long life versitile pressure die cast aluminum roadway luminarie with high power LEDS 20 Watts as light source and electronic driver bracket made into required shape for fittings complete with MS clamp, nuts and bolts and washsers as required at site of minimum 1.5 m long light grade GI pipe 40 mm dia including painting with one coat of primer and to coat of aluminium paint to MS clamps complete all as specified and directed. Make:- Philips model No. BRP042 LED 19 CW MR S1 PSU GR or equivalent model of Wipro, Bajaj, CG
Earthing complete with GI earth plate electrode 600x600x.6.3 mm buried directly in ground vertically to a depth of not less than 2.25m deep below ground level with the top edge of earth plate at a depth of not less than 1.5m below ground level connected to GI earth wire 4mm dia by means of bolts, nuts, washers of galvanised iron or steel, GI earth wire shall be protected by 15mm dia GI pipe 'light grade', watering pipe 20 mm dia GI pipe 'medium grade', GI wire meshed funnel, alternate layer of charcoal and salt on all side to earth plate upto a thickness of 150mm, filling of black cotton soil in earth pit upto GL, and connected to earth plate including necessary excavation & earthwork, PCC (1:3:6) type C-1 earth chamber, 40mm thick RCC cover (1:2:4) type B1 mix with 8mm dia TMT bars @ 100mm c/c both ways etc complete all as shown in electrical plate No.3 connected to earthing test point, complete including testing on completion all as speciified and as directed. Note: Quoted rate shall deemed to include the cost of excavation and earth work in any type of strata, funnel etc.
S&F LED tube light fitting 1x20 W, 230 V including LED tube rod T8 1200 mm alongwith LED tube having system efficacy of 2100Lm and CCT-6500k, THD must be <15%, housing made of CRCA, LED life hours should not be less than 25k hours as per LM80 report, BIS mark is mandatory, supplier has to provide LM79/80 report, connecting upwith PVC copper conductor from ceiling rose complete all as specified and directed. Make: Philips Cat No. TMC 501 P 1xT LED 22W P 3241 & 20 W 865 T8 IND I, or equivalent in CG, Bajaj, Wipro
S&F of Ceiling Fan of sweep 1200 mm,230 volts, 50 Hz complete all as specified and directed at site.
S&F of Exhaust fan of sweep 230 mm, 1200 RPM, 230 Volts, 50 Hz, iron body with louvers, frame complete fixing to the wall, according to the hole provided complete all as specified and directed.
S&F CPRI aprroved LT panel cubical type of suitable size, 415 Volt, factory made dust proof vermin proof (Kiosik type) for out door use made out of CRCA sheet 3.15 mm thick exept inner sheath OG 2 mm powder coated, machine pressed, both side opening in two halves with provision of rubber beading and locking system, inciuding aluminium bus bar of 100 Amp capacity, 4 strip mounted on porcelain insulator, bus bar chamber shall be provided with inspection covers each MCCB/cubical switch shall have be independent opening, panel should be monthed on angle iron frame and legs (vertcal height of legs not less than 30 cm exept in PCC) made from angle of size 50x50x6 mm, frame and legs duly spray painted internally and externally with two coats of synthetic enamel paint over a coat of red oxide primer legs grouted in PCC 1:2:4, type B-2 (using 20 mm graded stone aggregate) complete including all connection/ control wiring with suitable size of copper conductor cable, including danger notice sticker, comprising the following accessory including testing complete all as specified. Note: The Panel should be placed on STP plant at suitable location for carrying electric supply through Cables to STP pumps. (a) MCCB 100 Amp 25 kA, 4 pole - 01 No. (Incomer) (b) MCCB 32 Amp 16 kA - 02 Nos. (Outgoing for Sewage Line Panel & One Spare) (c) MCB 10 Amp 10 kA, TP - 04 Nos. (Outgoing for 2 hp & 5 hp Air blower pump) (d) MCB 6 Amp 10 kA, TP - 7 Nos. (Outgoing 0.5 & 1 hp pump) (e) MCB 6 Amp to 32 A, 10 kA, SPN-02 (Outgoing Security light & Operator Room) (f) DOL Starter for 2hp Motor - 02 Nos (g) DOL Starter for 1 hp Motor - 04 Nos (h) DOL Starter for 0.5 hp Motor - 03 Nos (i) Dol Starter suitable for 5Hp Air compressor - 02 Nos (j) Single phase preventer - 11 Nos (k) R,Y,B Indicators - 01 Set (l) Digital Amp meter (0-100) Amp including necessary CTs (set of three) - 1 set (m) Digital Volt meter (0-500) - 01 No (n) Rubber matting 12 mm thick for full length of main electric control panel - 01 No
S&F 9.0 m long Steel tubular swaged pole complete with cast iron base plate, finial taper plug, bolts, nuts, screws as specified type 410 SP-31, including two coats of bituminous paint internally and externally for the portion embedded in concrete and two coats of aluminium paint over one coat of red oxide primer to external/ exposed surfaces all as specified and directed. Note: (i) Rate quoted by the contractor shall deemed to includes excavation and earth work, 150 mm thick PCC 1:3:6, type C2 using 40mm graded stone aggregate below ploe and filled in trench up to 20cm above ground and coping concrete Shall be with PCC 1:2:4 type B1.
S&F 30 W high efficient LED Street light fixture (as security light) with aluminium pressure die cast housing for long life, system efficiency ≥120 lm/W, system Lumens 3600 lm, high purity polycarbonate/glass diffuser, with silicon gaskets for IP66 protection, IK07, in built electronic driver with 10 kV surge protection (with in the fixure compartment) has features of constant current with low/over Voltage protection with phase to phase 440 V protection for 8 Hrs, duly wired up to terminal block, surge protection in 10 kV, driver efficiency >88%, power factor > 0.95, THD <10% LED Make : Nichia/ Cree/ Osram/ Lumiled, colour rendering index CRI >70, temp range 0 to 45 degree centigrade, CCT 5700k-6500K, LED life 50000 burning hrs (min) as per L70 B50, photo biological safety report as per IEC 62471 & electrical insulation class 1, Voltage range 110-270 V AC and safety on low Voltage/high Voltage. LM79 & LM 80 certification. BIS R No. is mandatory for LED light fixtures/drivers and fixture shall be fitted to GI bracket 40 mm dia, light grade, min 1.5 m length, bent to shape required as per site and quoted rate is deemed to be included pron of GI pipe with brackets, nuts and bolts. Make:- Philips model No. BRP046 LED 36 CW MR S1 PSU GR or equivalent model of Wipro, Bajaj, CG
M&L for construction of valve chamber 90x90x90 cm inner dimensions, with brick masonary in CM 1:4, PCC base in 1:3:6 of 7.5 cm thick & plastering 15 cm thick in CM 1:4 in inner side/ coping of all chamber fabrication of Iron frame 40x40x6 mm size angle iron MS cover 3 mm thick with hinges and locking arrangements duly painted with two coats over a coat of primer excavation, earth work all as directed.
Cutting/boring on the existing CI/GI pipe line 80/25mm dia (in position) for insertion of new galvanised Tee 80x25 mm for branch connection including necessary jointing material complete all as specified and as directed.
S&F factory made junction box of size 275x200x70 mm with 4 Nos of aluminium bus bar of suitable capacity for street light fixed on pole, made out of CRCA sheet 2mm thick having front hinged shutter with lockable arrangements, outdoor type, weather proof duly painted with two coats of synthetic enamel paint over a coat of red oxide primer, having the provision to connect incoming and outgoing cable of size 10 sqmm 2 core with one number MCB SP 6 A, 10 kA, 240 Volts and earthing point complete all as specified and directed at site.
SCHEDULE 'A' PART - XI (MANNING AND OPERATION FOR 03 YEARS DURING DEFECTS LIABILITY PERIOD OF 03 YEARS) Manning and operation, Routine mainteanance of 01 (One) No of Sewage Treatment Plant of 150 KLD, including DG Sets 20 kVA, including chemicals and consumable for day to day operations by provisioning of qualified 01 (one) operator/shift in 02 shifts of 08 hours duration for operation of plant daily including sundays and public holidays and carrying out daily, weekly, monthly, quarterly & half yearly maintenance complete all as specified and directed, during defects liability period after physical completion, testing and taking over of plant by MES all as specified and as directed.
Manning and operation, Routine mainteanance of 01 (One) No of Sewage Treatment Plant of 150 KLD, including DG Sets 20 kVA, including chemicals and consumable for day to day operations by provisioning of qualified 01 (one ) operator/shift in 02 shifts of 08 hours duration for operation of plant daily including sundays and public holidays and carrying out daily, weekly, monthly, quarterly & half yearly maintenance complete all as specified and directed, during defects liability period and after completion of 09 months of handing over STP to MES.
Manning and operation, Routine mainteanance of 01 (One) No of Sewage Treatment Plant of 150 KLD, including DG Sets 20 kVA, including chemicals and consumable for day to day operations by provisioning of qualified 01 (one) operator/shift in 02 shifts of 08 hours duration for operation of plant daily including sundays and public holidays and carrying out daily, weekly, monthly, quarterly & half yearly maintenance complete all as specified and directed,during defects liability period maintenance complete all as specified and directed, during defects liability period after completion of 18 months of handing over STP to MES.
Manning and operation, Routine mainteanance of 01 (One) No of Sewage Treatment Plant of 150 KLD, including DG Sets 20 kVA, including chemicals and consumable for day to day operations by provisioning of qualified 01 (one) operator in 02 shifts of 08 hours duration for operation of plant daily including sundays and public holidays and carrying out daily, weekly, monthly, quarterly & half yearly maintenance complete all as specified and directed, during defects liability period after completion of 27 months of handing over STP to MES.
SCHEDULE 'A' PART - XII (MANNING AND OPERATION FOR 24 MONTHS AFTER EXPIRY OF DEFECTS LIABILITY PERIOD OF 03 YEARS) Manning and operation, Routine mainteanance of 01 (One) No of Sewage Treatment Plant of 150 KLD, including DG Sets 20 kVA, including chemicals and consumable for day to day operations by provisioning of qualified 01 (one) operator/shift in 02 shifts of 08 hours duration for operation of plant daily including sundays and public holidays and carrying out daily, weekly, monthly, quarterly & half yearly maintenance complete all as specified and directed after completion of defect liability period of 36 months.
Manning and operation, Routine mainteanance of 01 (One) No of Sewage Treatment Plant of 150 KLD, including DG Sets 20 kVA, including chemicals and consumable for day to day operations by provisioning of qualified 01 (one) operator/shift in 02 shifts of 08 hours duration for operation of plant daily including sundays and public holidays and carrying out daily, weekly, monthly, quarterly & half yearly maintenance complete all as specified and directed after completion of 45 months (including 36 months defects liability period and 09 months maintenance and operation of STP).
Manning and operation, Routine mainteanance of 01 (One) No of Sewage Treatment Plant of 150 KLD, including DG Sets 20 kVA, including chemicals and consumable for day to day operations by provisioning of qualified 01 (one) operator/shift in 02 shifts of 08 hours duration for operation of plant daily including sundays and public holidays and carrying out daily, weekly, monthly, quarterly & half yearly maintenance complete all as specified and directed after completion of 54 months (including 36 months defects liability period and 18months maintenance and operation of STP). . Note: (i) Manning and operation shall be carried out by the OEM only (ii) Electricty and water for operation of the plant shall be issued by the department free of cost. (iii) The period of operation and maintenance will start from the date of handing over of STP to MES by contractor subject to nil defects at the time of handing over STP. Maintenance and operation of STP is accordingly planned for 05 years from date of handing over of STP to MES. (iv) Sludge from drying beds shall be removed in closed container to out side MD Land (v) The contractor shall operate and maintain all the T&P installed under this work at no extra cost. (vi) The manning and operation include all consumables including all chemicals for testing and lubricants for operation and testing. (vii) All log sheets shall be maintained for every shift. The details of consumables used shall also recorded as directed by Engineer-in-Charge. (viii) Diesel required for DG set will be issued by the department free of cost. Transporatation of Diesel from place of issue to the DG sets shall be borne by the contractor. Records for running hours and fuel consumed shall be maintained daily on log sheet and plant running record for DG set. (ix) Manning and operation shall be carried out in two shifts including holidays of 8 hours each with one FGM. In case of non operation of the plant on account of contractor’s default/non employment of operators, recovery at Rs. 2000/- per shift shall be recovered from contractor's dues. (x) Any tradesman/employees shall not be allowed to continue their employment for more than 11 month. (xi) The manning and operation includes replacement of essential electrical and mechanical parts as decided by GE for smooth functioning of the plant.
Chandel Construction Company
RYSA INFRATECH
SANJEEV CONSTRUCTIONS
m. surender singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .