CPO-WEST ZONE
This tender is floated for Maintenance and Repair jobs covering Civil, Pipeline (including Tanks),
2600028133-HD-07350
5100028133
Open Tender
Two Bid
Goa
22 Oct 2026
22 Oct 2026
13 Nov 2026
13 Nov 2026
23 Oct 2026 - 29 Oct 2026
29 Oct 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | REM FLOORING & WALL | REM FLOORING & WALL — REMOVAL OF EXISTING FLOORING, WALL TILES AND SKIRTING INCLUDING OF DISPOSAL OF DEBRIS AT INDICATED LOCATION OFF SITE. | - | square foot |
| 2 | SURFACE DRESSING,SITE | SURFACE DRESSING,SITE — "SURFACE DRESSING OF THE GROUND INCLUDING REMOVING SMALL PLANTS, BUSHES ,VEGETATION (DIA LESS THAN 4"") AND MAKING SURFACE LEVELLED AND DISPOSAL OF RUBBISH OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE." | - | square meter |
| 3 | EXCAVATION,F/FNDTN,GRND | EXCAVATION,F/FNDTN,GRND — "Excavation for foundation upto required depth below existing ground level up to 1.5m in any tyoe odf soil except hard rock. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. | - | cubic meter |
| 4 | EXCAVATION,F/FNDTN,GRND | EXCAVATION,F/FNDTN,GRND — "Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH UPTO 3 M | - | cubic meter |
| 5 | EXCAVATION,F/FNDTN,BTWN | EXCAVATION,F/FNDTN,BTWN — "Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN EARTH BETWEEN 3 TO 4.5 | - | cubic meter |
| 6 | EXCAVATION,F/FNDTN,HR,GR | EXCAVATION,F/FNDTN,HR,GR — "EXCAVATION FOR FOUNDATION UPTO REQUIRED DEPTH BELOW EXISTING GROUND LEVEL UP TO 1.5 M. DEPTH IN CONCRETE ROAD BY CHISELLING / PNEUMATIC DRILLING . RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING, BACKFILLING AFTER THE JOB TO RESTORE THE ORIGINAL STATE OF THE GROUND AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING CURING, WATERING AND COMPACTION AND COMPLETE . THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION. " | - | cubic meter |
| 7 | EXCAVATION,F/FNDTN,HR,GR | EXCAVATION,F/FNDTN,HR,GR — "EXCAVATION FOR FOUNDATION UPTO REQUIRED IN HARD ROCK AND EXCAVATION SHALL BE DONE BY CHISELLING / PNEUMATIC DRILLING OR BLASTING. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING, BACKFILLING AFTER THE CONSTRUCTION OF FOUNDATION, TRENCHES/PLINTH BEAM ETC COMPACTING BY THE SIDE OF THE FOUNDATION AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING SPREADING, WATERING AND COMPACTION, COMPLETE . THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION WITH APPLICABLE RATE FOR DIFFERENT DEPTHS. EXCAVATION IN HARD ROCK 1.5 MTS- 3.0 MTS" | - | cubic meter |
| 8 | EXCAVATION,F/FNDTN,HR,BT | EXCAVATION,F/FNDTN,HR,BT — "Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK BETWEEN 3 TO 4.5 | - | cubic meter |
| 9 | SUPPLY AND FILLING,WITH | SUPPLY AND FILLING,WITH — "Supply and filling with clean silver / river sand of approved quality in layers of 150 mm each including spreading, compacting by hand ramming and watering etc, all complete as per direction of Engg.-In-Charge. Measurement basis compacted thickness only. | - | cubic meter |
| 10 | SUPPLY&FILLING,CRSHD STN | SUPPLY&FILLING,CRSHD STN — "SUPPLY AND FILLING WITH CRUSH SAND AS PER IS 21116-1980-2 & IS 486:2000 & IS 383.1970 THE PARTICLE SHAPE IS SEMI ROUNDED OR CUBICAL & NOT FLAKEY OR ELONGATED. DUST PERCENTAGE IS STRICTLY CONTROLLED 10 - 15% WITH FINENESS MODULUS 2.6 TO 3. SUPPLY AND FILLING WITH STONE CRUSHED SAND OF APPROVED QUALITY IN LAYERS OF 150 MM EACH INCLUDING SPREADING, COMPACTING BY HAND RAMMING AND WATERING ETC, ALL COMPLETE AS PER DIRECTION OF ENGG.-IN-CHARGE. COMPACTED THICKNESS ONLY." | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2600028133-HD-07350.pdf
TENDER_DOCUMENT • 38.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .