| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹1.1 L+₹800 (0.70%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | L3₹1.1 L+₹1,140 (1.00%)Rejected-AOC | L3 | Rejected-AOC Found 3rd Highest |
Tender Value
₹1.1 L
EMD Value
₹1,500
Closing Date
3 Dec 2019, 10:00 amClosed
SUPERINTENDING ENGINEER, EDC, BANDA
CHILLA ROAD, INDIRA NAGAR, BANDA
THE WORK OF SHIFTING OF 250 KVA S/S AT POLICE LINE BANDA TOWN AND ERECTION OF LT LINE AND INCREASING CAPACITY OF 11 KV S/S FROM 10 TO 63 KVA T/F AT INFRONT OF URMILA GARDEN MARR. HALL BANDA TOWN UNDER BUSINESS PLAN UNDER EUDD, BANDA
2019_DVVNL_393649_2
76/SE/EDCB/2019-20
Open Tender
Electrical Works
Item Rate
60 days
BANDA TOWN
AS PER ANNEXURED
2 documents required · 2 mandatory
₹1,180
DVVNL
₹1,500
O/O SE, EDC, BANDA
26 Mar 2021
23 Nov 2019
3 Dec 2019
23 Nov 2019
3 Dec 2019
23 Nov 2019
30 Nov 2019
Amount
THE WORK OF SHIFTING OF 250 KVA CAPACITY SUB-STATION AT POLICE LINE BANDA TOWN & ERECTION OF LT LINE AND INCREASING CAPACITY OF 11 KV SUB-STATION FROM 10 KVA TO 63 KVA T/F CHILLA ROAD, INFRONT OF URMILA GARDEN MARRIAGE HALL BANDA TOWN avoiding of overloading & supply interruptions of that area fed from 33/11 KV SUB-STATION, CHILLA ROAD, BANDA at EDSD, CHILLA ROAD, BANDA under BUSINESS PLAN YEAR 2019-20 as per Passed Package No. 10 & 11/BND/BP/2019-20 under EUDD, Banda, including safe carriage of all required material from E.S.C., BANDA to work site and work site to E.S.C., BANDA, alongwith its loading, unloading & dragging at the respective ends, details of the work as given below :-
Safely cartage of 8.5/11 Mtr. long PCC/ST poles
Safely cartage of line material
Erection of single/double pole structure on following poles, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Single Support Structure on 8.5/11 Mtr. long PCC/ST poles
Double Pole Structure on 8.5/11 Mtr. long PCC/ST poles
Erection and grouting of stay set including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material.
Earth of each support by earthing rod with complete fittings as per RESSPO schedule.
Laying, Sagging & Stringing of ACSR Weasel Conductor with proper binding of conductor with insulator fixing, jumpering & jointing of conductor (where necessary) as laid down in RESSPO schedule.
Laying of ABC Conductor of size 3cx120+1x95+1x16 Sq.mm. with spreading, stringing, jumpering etc. and binding with all fittings on the newly erected poles as per direction of supervising engineer/RESSPO manual.
Carriage of LT PVC Cable Al. of size 1x240 Sq.mm. with laying, spreading, stringing, jumpering etc. and binding with all fittings as per direction of supervising engineer/RESSPO manual.
Concreting/Grouting of old/newly erected single/double pole structure on following poles as per direction of supervising engineer/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
Single Support Structure on 8.5/11 Mtr. long PCC/ST poles
Double Pole Structure on 8.5/11 Mtr. long PCC/ST poles
Fixing of LT Distribution Box 3 Phase with all fittings as per norms.
Construction of new 250 KVA Transformer plinth of size 3460x4460x550 mm above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly. After that a retaining wall of 9” width by first class brick in ratio 1:5 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. Jail of 12 mm MS tore shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer.
Removing/dismantling of 250 KVA Capacity T/F from the existing/old double pole structure/old plinth after opening of connections & fittings and safe carriage of the same from old site to newly constructed plinth nearby 400 KVA T/F plinth structure installed at outside of Police Line through the Kachha Pacca/mudding road including the work of its loading, unloading & dragging at the respective ends.
Installation of 250 KVA Capacity Transformer complete on the newly erected double pole structure/plinth in proper alignment and as per direction of supervising engineer/RESSPO manual.
Removing/dismantling of 10 KVA Capacity T/F from the single pole after opening of connections & fittings and safe carriage of the same, including the work of its loading, unloading & dragging.
Safely cartage of 63 KVA Capacity Transformer complete
Installation of 63 KVA Capacity Transformer complete on the newly erected double pole structure in proper alignment and as per direction of supervising engineer/RESSPO manual.
Loading & cartage of 11 KV Drop Out Fuse set from ESC/JE store, Banda to work site such as 11/0.4 KV S/Ss in the same place, including unloading & installation of the same on top of double pole one set of three phase on each S/s as per direction of supervising engineer/standard norms.
Vijaylaxmi Arthmovers
M/s. SHIVOM CONSTRUCTION AND SUPPLIERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .