Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹3.0 L (2.25%)Admitted-Finance 55 KENCHAPPA ROAD FRAZER TOWN BANGALORE BANGALORE KARNATAKA 560005 | BENGALURU URBAN | KARNATAKA | 560005 | ₹1.4 Cr+₹3.0 L (2.25%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹4.7 L (3.54%)Admitted-Finance 203 204 SKYLINE WEALTH SPACE PREMIERROAD VIDYAVIHAR W MUMBAI MAHARASHTRA 400086 | MUMBAI SUBURBAN | MAHARASHTRA | 400086 | ₹1.4 Cr+₹4.7 L (3.54%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹25.8 L (19.5%)Admitted-Finance | ₹1.6 Cr+₹25.8 L (19.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 Cr+₹39.0 L (29.5%)Admitted-Finance OFFICE NO 44 45 2ND FLOOR CRYSTAL PLAZA HIRANANDANI COMPLEX PLOT NO 18 27 SECTOR 7 KHARGHAR RAIGAD MAHARASHTRA 410210 | RAIGAD | MAHARASHTRA | 410210 | ₹1.7 Cr+₹39.0 L (29.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TF Air Systems Pvt Ltd L2 | M/s Associated Engineers L6 | Powermech Services Private Limited L5 | BRITE INDUSTRIES L4 | AIRTEK HVAC LLP L3 | GROMOS INDIA L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Day to day maintenance including breakdown of AHUs, cooling tower & associated valves, strainers, fresh air units, centrifugal blowers, motors etc. as detailed in Clause No. 1.0. of Technical specification. Minimum 10 nos. of manpower shall be deputed by contractor at CFB, H-09, H-10 & H-11 on daily basis during general working days. | |||||||||
| 1.10 | From 1st quarter to 4th quarter (From 1st day to end of 12th month) | 4 | Quarter | 9,18,540 ₹36,74,160 | 9,30,000 ₹37,20,000 | 8,73,604 ₹34,94,416 | 7,35,000 ₹29,40,000 | 5,000 ₹20,000 Lowest | 9,50,000 ₹38,00,000 |
| 1.20 | From 5th quarter to 8th quarter (From 13th month to end of 24th month) | 4 | Quarter | 9,18,540 ₹36,74,160 | 9,80,000 ₹39,20,000 | 9,17,284 ₹36,69,136 | 7,45,000 ₹29,80,000 | 7,500 ₹30,000 Lowest | 11,00,500 ₹44,02,000 |
| 2.00Quarterly maintenance of the following AHUs, Fresh air unit, centrifugal blower etc. from 1st quarter to 4th quarter (From 1st day to end of 12th month) (equipments details as per Annexure- I) in CFB & as per clause No. 2.0. of technical specifications. | |||||||||
| 2.10 | From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 50 TR Capacity AHU (2 nos. X 3 qtr =6 qtr). | 6 | Quarter | 7,650 ₹45,900 | 2,000 ₹12,000 Lowest | 2,337 ₹14,022 | 2,700 ₹16,200 | 3,750 ₹22,500 | 2,300 ₹13,800 |
| 2.20 | From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 45 TR (1 Nos) & 40 TR (7 no) Capacity AHU (8 nos. X 3 qtr = 24 qtr). | 24 | Quarter | 6,093 ₹1,46,232 | 2,500 ₹60,000 | 2,337 ₹56,088 | 3,240 ₹77,760 | 13,680 ₹3,28,320 | 2,300 ₹55,200 Lowest |
| 2.30 | From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 35 TR (1 no.) & 30 TR (3 no) Capacity AHU (4 nos. X 3 qtr = 12 qtr). | 12 | Quarter | 4,689 ₹56,268 | 1,500 ₹18,000 Lowest | 2,337 ₹28,044 | 2,430 ₹29,160 | 4,680 ₹56,160 | 1,500 ₹18,000 Lowest |
| 2.40 | From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 25 TR (2 nos.) & 22 TR (1 no) Capacity AHU (3 nos. X 3 qtr = 9 qtr). | 9 | Quarter | 3,600 ₹32,400 | 1,500 ₹13,500 Lowest | 2,077 ₹18,693 | 1,890 ₹17,010 | 2,700 ₹24,300 | 1,500 ₹13,500 Lowest |
| 2.50 | From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 15 TR (3 Nos.), 10 TR (1 nos) & 06 TR (2 nos.) Capacity AHU (6 nos. X 3 qtr = 18 qtr). | 18 | Quarter | 1,675 ₹30,150 | 1,200 ₹21,600 Lowest | 1,688 ₹30,384 | 1,890 ₹34,020 | 2,050 ₹36,900 | 1,300 ₹23,400 |
| 2.60 | From 1st quarter to 4th quarter (From 1st day to end of 12th month) of Fresh air units, 6000 CFM (3 nos. X 3 qtr = 9 qtr). | 9 | Quarter | 900 ₹8,100 Lowest | 1,000 ₹9,000 | 1,688 ₹15,192 | 2,430 ₹21,870 | 1,685 ₹15,165 | 1,300 ₹11,700 |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
3 Jul 2024, 6:00 pmClosed
Chief Engineer
TSD, BARC, Tromaby, Mumbai 400085
Maintenance of AHUs, blowers, package units, cooling towers, Motors etc. for a period of 24 months at CFB, Hall 09,10 and 11, BARC, Trombay, Mumbai 85.
2024_BARC_809734_1
BARC/TSD/ET/2/2024-2025
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
730 days
CFB, Hall-9 to 11, BARC, Tromaby, Mumbai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.9 L
Common facility Building, BARC, Tromaby, Mumbai
4 Sept 2024
4 Jun 2024
10 Jul 2024
4 Jun 2024
3 Jul 2024
19 Jun 2024
4 Jun 2024 - 14 Jun 2024
14 Jun 2024
Amount
Day to day maintenance including breakdown of AHUs, cooling tower & associated valves, strainers, fresh air units, centrifugal blowers, motors etc. as detailed in Clause No. 1.0. of Technical specification. Minimum 10 nos. of manpower shall be deputed by contractor at CFB, H-09, H-10 & H-11 on daily basis during general working days.
From 1st quarter to 4th quarter (From 1st day to end of 12th month)
From 5th quarter to 8th quarter (From 13th month to end of 24th month)
Quarterly maintenance of the following AHUs, Fresh air unit, centrifugal blower etc. from 1st quarter to 4th quarter (From 1st day to end of 12th month) (equipments details as per Annexure- I) in CFB & as per clause No. 2.0. of technical specifications.
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 50 TR Capacity AHU (2 nos. X 3 qtr =6 qtr).
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 45 TR (1 Nos) & 40 TR (7 no) Capacity AHU (8 nos. X 3 qtr = 24 qtr).
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 35 TR (1 no.) & 30 TR (3 no) Capacity AHU (4 nos. X 3 qtr = 12 qtr).
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 25 TR (2 nos.) & 22 TR (1 no) Capacity AHU (3 nos. X 3 qtr = 9 qtr).
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of 15 TR (3 Nos.), 10 TR (1 nos) & 06 TR (2 nos.) Capacity AHU (6 nos. X 3 qtr = 18 qtr).
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of Fresh air units, 6000 CFM (3 nos. X 3 qtr = 9 qtr).
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of Centrifugal Blowers : Capacity: 8000 CFM, 125 mm WG (2 nos.) and capacity: 10000 CFM, 100 mm WG (2 nos.) (4 nos. X 3 qtr = 12 qtr).
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of Spark resistant and flameproof Centrifugal Blowers : Capacity: 24500 CFM, 85 mm WG (2 nos.) (2 nos. X 3 qtr = 6 qtr).
Quarterly maintenance of the following AHUs, Fresh air unit, centrifugal blower etc. from 5th quarter to 8th quarter (From 13th month to end of 24th month) (equipments details as per Annexure- I) in CFB & as per clause No. 2.0. of technical specifications.
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of 50 TR Capacity AHU (2 nos. X 4 qtr =8 qtr).
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of 45 TR (1 Nos) & 40 TR (7 no) Capacity AHU (8 nos. X 4 qtr = 32 qtr).
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of 35 TR (1 no.) & 30 TR (3 no) Capacity AHU (4 nos. X 4 qtr = 16 qtr).
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of 25 TR (2 nos.) & 22 TR (1 no) Capacity AHU (3 nos. X 4 qtr = 12 qtr).
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of 15 TR (3 Nos.), 10 TR (1 nos) & 06 TR (2 nos.) Capacity AHU (6 nos. X 4 qtr = 24 qtr).
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of Fresh air units, 6000 CFM (3 nos. X 4 qtr = 12 qtr).
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of Centrifugal Blowers : Capacity: 8000 CFM, 125 mm WG (2 nos.) and capacity: 10000 CFM, 100 mm WG (2 nos.) (4 nos. X 4 qtr = 16 qtr).
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of Spark resistant and flameproof Centrifugal Blowers : Capacity: 24500 CFM, 85 mm WG (2 nos.) (2 nos. X 4 qtr = 8 qtr).
Overhauling of the following AHUs, Fresh air unit, centrifugal blower etc. (equipments details as per Annexure-I) once in contract period in CFB as per clause No.03 of technical specifications.
50 TR Capacity AHU (2 nos.)
45 TR (1 Nos) & 40 TR (7 no) Capacity AHU
35 TR (1 no.) & 30 TR (3 no) Capacity AHU
25 TR (2 nos.) & 22 TR (1 no) Capacity AHU
15 TR (3 Nos.), 10 TR (1 nos) & 06 TR (2 nos.) Capacity AHU
Fresh air units, 6000 CFM (3 nos)
Centrifugal blowers : Capacity: 8000 CFM, 125 mm WG (2 nos.) and capacity: 10000 CFM, 100 mm WG (2 nos.)
Spark resistant and flameproof Centrifugal Blowers : Capacity: 24500 CFM, 85 mm WG (2 nos.)
Quarterly maintenance, overhauling & breakdown maintenance of following cooling towers for a period of 24 months as per clause - 4.0. of technical specification. Quarterly maintenance shall not be performed for the quarter in which Overhauling has been carried out.(at CFB)
Quarterly maintenance of Advance make 900 TR cooling towers (3 nos) (3 Nos x 3 qtr = 9 qtr.. ) from 1st quarter to 4th quarter (From 1st day to end of 12th month)
Quarterly maintenance of Advance make 900 TR cooling towers (3 nos) (3 Nos x 4 qtr = 12 qtr.. ) From 5th quarter to 8th quarter (From 13th month to end of 24th month).
Overhauling once in contract period of Advance make 900 TR cooling towers (3 nos)
Quarterly maintenance of 2 nos Mihir make 850 TR cooling towers (2 nos.) of CM series model for LEHIPA Cooling Towers from 1st quarter to 4th quarter (From 1st day to end of 12th month) (2 Nos x 3 qtr = 6 qtr. )
Quarterly maintenance of 2 nos Mihir make 850 TR cooling towers (2 nos.) of CM series model for LEHIPA Cooling Towers from 5th quarter to 8th quarter (From 13th month to end of 24th month)(2 Nos x 4 qtr = 8 qtr. ).
Overhauling once in contract period Mihir make 850 TR cooling towers (2 nos.) of CM series model for LEHIPA
Quarterly maintenance of Mihir make 150 TR cooling towers (2 nos.) of CM series model for CrTD from 1st quarter to 4th quarter (From 1st day to end of 12th month)(2 Nos x 3 qtr = 6 qtr. )
Quarterly maintenance of 2 nos Mihir make 150 TR cooling towers (2 nos.) of CM series model for CrTD from 5th quarter to 8th quarter (From 13th month to end of 24th month)(2 Nos x 4 qtr = 8 qtr. )..
Overhauling once in contract period of Mihir make 150 TR cooling towers (2 nos.) of CM series model for CrTD
Blower Model- 47, Make: M/s Everest Blower Pvt. Ltd. Twin lobe type air blower installed at water treatment plant
Quarterly Maintenance of Blower Model- 47, Make: M/s Everest Blower Pvt. Ltd. Twin lobe type air blower installed at water treatment plant from 1st quarter to 4th quarter (From 1st day to end of 12th month)
Quarterly Maintenance of Blower Model- 47, Make: M/s Everest Blower Pvt. Ltd. Twin lobe type air blower installed at water treatment plant from 5th quarter to 8th quarter (From 13th month to end of 24th month)(2 Nos x 4 qtr = 8 qtr. )
Overhauling once in contract period of Blower Model- 47, Make: M/s Everest Blower Pvt. Ltd. Twin lobe type air blower installed at water treatment plant
One time repairing and servicing of twin lobe type air blower installed at water treatment plant, near PP nursery(Blower Model- 47, Make: M/s Everest Blower Pvt. Ltd.)
Supply of Suction Filter
Supply of Set of oil seal
Supply of Set of gasket
Supply of Set of bearing
Supply of Set of gears with hub (complete with hardware)
Supply and installation of fan Bearings of FYH or SKF make at DE and NDE of AHUs, if existing fitted bearings are found defective, worn out etc. at CFB (Equipment detail as per Annexure- I) as per clause No. 5 of Technical Specification.(at CFB)
FYH make bearing D55 UKP 212 & Adapter Sleeve D55 H2312X or equivalent SKF make bearing & adapter sleeve for FDA 800 TM fan model of Kruger make.
FYH make bearing D40 UK 209, Adapter Sleeve D40 H2309X & Rubber Damper D45 (YET209) & D40 (UK209) or equivalent SKF make bearing, adapter sleeve & Rubber Damper for FDA 560 CM fan model of Kruger make.
FYH make bearing D35 UK 208, Adapter Sleeve D35 H2308X & Rubber Damper D40 (YET208) & D35 (UK208) or equivalent SKF make bearing, adapter sleeve & Rubber Damper for FDA 500 CM & FDA 450 CM fan model of Kruger make.
FYH make ball Bearing D25 SA 205 & Rubber Damper D25 (YET 205 & SA205) or equivalent SKF make bearing, rubber damper for KAT 18/18 S fan & KAT 12/12 S fan model of Kruger make.
FYH make Ball Bearing D20 SA 204 & Rubber Damper D20 (YET 204 & SA204) or equivalent SKF make bearing & rubber damper for KAT 8/8 S fan model of Kruger make.
Supply and installation of blower Bearings of SKF or equivalent make at DE and NDE of Centrifugal blower, if existing fitted bearings are found defective, worn out etc. as per clause No. 5 of Technical Specification.(at CFB)
Bearing no. 2211 K
Bearing no. 2211 KTN9
Bearing no. 6212 2Z C3 (for HWD Blower)
Supply and installation of belt of Fenner (Poly-F Plus) or equivalent make for AHUs & centrifugal blower, if existing fitted belt are found defective, worn out etc. as per clause No. 5.0. of specifications.(CFB)
Belt no. B-140 for AHU
Belt no. B-77 & B-72 for AHU
Belt no. B-65 & B-69 for AHU
Belt no. A-75 for AHU
Belt no. A-61 for AHU
Belt no. A-39, A-35 & A-28 for AHU
Belt no. SPB 2240 for centrifugal fan
Belt no. SPA 2060 for centrifugal fan
Belt no. SPB 3220 for centrifigal fan
Quarterly maintenance of the following AHUs, Fresh air unit, centrifugal blower etc. from 1st quarter to 4th quarter. (equipments details as per Annexure- I) in Hall 09,10 & 11 as per clause No. 2.0. of technical specifications.
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of AHU 140 TR Cooling Capacity ( Excluding Blower) - 02 No (2 nos. X 3 qtr= 6 qtr)
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of AHU 60 TR Cooling Capacity - 02 No (2 nos. X 3 qtr=3 qtr)
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of AHU 54.6 TR Cooling Capacity -2 No & AHU 50 TR Cooling Capacity- 01 No(3 nos. X 3 qtr=9 qtr)
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of AHU 35 TR Cooling Capacity-2 No & AHU 40 TR Cooling Capacity- 01 No(3 nos. X 3 qtr=9 qtr)
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of AHU 25TR Cooling Capacity -01 No, AHU 27 TR Cooling Capacity - 01 No, AHU 30TRCooling Capacity -01 No & AHU 31 TR Cooling Capacity - 01 No, (4 nos. X 3 qtr=12 qtr)
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of AHU 17.7 TR Cooling Capacity-01 No & AHU 23 TR Cooling Capacity- 01 No(2 nos. X 3 qtr=6 qtr)
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of Nadi make centrifugal Blowers: Capacity: 42000 CFM/ 200 mm WG (2 nos.) and capacity: 42000 CFM/250 mm WG (2 nos.) (4 nos. X 3 qtr=12 qtr)
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of Nadi make centrifugal Blowers : Capacity: 22000 CFM/ 125 mm WG (3 nos.) and capacity: 24500 CFM/250 mm WG (3 nos.) (6 nos. X 3 qtr=18 qtr)
Quarterly maintenance of the following AHUs, Fresh air unit, centrifugal blower etc. from 5th quarter to 8th quarter (equipments details as per Annexure- I) in Hall 09,10 & 11 as per clause No. 2.0. of technical specifications.
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of AHU 140 TR Cooling Capacity ( Excluding Blower) - 02 No (2 nos. X 4 qtr=08 qtr)
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of AHU 60 TR Cooling Capacity - 02 No(2 nos. X 4 qtr=8 qtr)
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of AHU 54.6 TR Cooling Capacity -2 No & AHU 50 TR Cooling Capacity- 01 No(3 nos. X 4 qtr=12 qtr)
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of AHU 35 TR Cooling Capacity-2 No & AHU 40 TR Cooling Capacity- 01 No(3 nos. X 4 qtr=12 qtr)
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of AHU 25TR Cooling Capacity -01 No, AHU 27 TR Cooling Capacity - 01 No, AHU 30TRCooling Capacity -01 No & AHU 31 TR Cooling Capacity - 01 No, (4 nos. X 6 qtr=24 qtr)
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of AHU 17.7 TR Cooling Capacity-01 No & AHU 23 TR Cooling Capacity- 01 No (2 nos. X 4 qtr=8 qtr)
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of Nadi make centrifugal Blowers: Capacity: 42000 CFM/ 200 mm WG (2 nos.) and capacity: 42000 CFM/250 mm WG (2 nos.)(4 nos. X 4 qtr=16 qtr)
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of Nadi make centrifugal Blowers : Capacity: 22000 CFM/ 125 mm WG (3 nos.) and capacity: 24500 CFM/250 mm WG (3 nos.) (6 nos. X 4 qtr=24 qtr)
Overhauling of following Flaktwood make AHU and it's Fan, centrifugal blower and Ductable split unit in Hall 09,10&11. as per clause no.3 of TSS
AHU 140 TR Cooling Capacity ( Excluding Blower) - 02 No
AHU 60 TR Cooling Capacity - 02 No
AHU 54.6 TR Cooling Capacity -2 No & AHU 50 TR Cooling Capacity- 01 No
AHU 35 TR Cooling Capacity-2 No & AHU 40 TR Cooling Capacity- 01 No
AHU 25TR Cooling Capacity -01 No, AHU 27 TR Cooling Capacity - 01 No, AHU 30TR Cooling Capacity -01 No & AHU 31 TR Cooling Capacity - 01 No,
AHU 17.7 TR Cooling Capacity-01 No & AHU 23 TR Cooling Capacity- 01 No
Nadi make centrifugal Blowers: Capacity: 42000 CFM/ 200 mm WG (2 nos.) and capacity: 42000 CFM/250 mm WG (2 nos.)
Nadi make centrifugal Blowers : Capacity: 22000 CFM/ 125 mm WG (3 nos.) and capacity: 24500 CFM/250 mm WG (3 nos.)
Cooling tower(at H-09,10&11) as per clause 4.0 of TSS
Quarterly maintenace of Advance 2020 make 240 TR cooling towers (3 nos.) of Model no. A55 X 5.5kW for process water at Engg Hall-09 from 1st quarter to 4th quarter (From 1st day to end of 12th month) (3 nos. X 3 qtr=9 qtr)
Quarterly maintenace of Advance 2020 make 240 TR cooling towers (3 nos.) of Model no. A55 X 5.5kW for process water at Engg Hall-09 from 5th quarter to 8th quarter (From 13th month to end of 24th month).(3 nos. X 4 qtr=12 qtr)
Overhauling once in contract period of Advance 2020 make 240 TR cooling towers (3 nos.) of Model no. A55 X 5.5kW for process water at Engg Hall-09
Quarterly maintenace of 1 nos Cooling Tower of Advance 2020 make 140 TR cooling towers (1 nos.) having Model No A46 X 2.2 kW at Engg Hall 09 from 1st quarter to 4th quarter (From 1st day to end of 12th month)(1 nos. X 3 qtr=3 qtr)
Quarterly maintenace of 1 nos Cooling Tower of Advance 2020 make 140 TR cooling towers (1 nos.) having Model No A46 X 2.2 kW at Engg Hall 09 from 5th quarter to 8th quarter (From 13th month to end of 24th month).(1 nos. X 4 qtr=4 qtr)
Overhauling once in contract period of Advance 2020 make 140 TR cooling towers (1 nos.) having Model No A46 X 2.2 kW at Engg Hall 09
Quarterly maintenace of 2 nos Cooling Towers of Advance 2020 make 300 TR cooling towers (2 nos.) of having model No A55 X 7.5kW at Engg Hall-10 from 1st quarter to 4th quarter (From 1st day to end of 12th month)(2 nos. X 3 qtr=6 qtr)
Quarterly maintenace of 2 nos Cooling Towers of Advance 2020 make 300 TR cooling towers (2 nos.) of having model No A55 X 7.5kW at Engg Hall-10 from from 5th quarter to 8th quarter (From 13th month to end of 24th month).(2 nos. X 4 qtr=8 qtr)
Overhauling once in contract period of Advance 2020 make 300 TR cooling towers (2 nos.) of having model No A55 X 7.5kW at Engg Hall-10
Supply and installation of fan Bearings of FYH or SKF make at DE and NDE of AHU's Fan & Centrifugal Blower , if existing fitted bearings are found defective, worn out etc. (at Hall 09.10,11) as per clause 5 of TSS
FYH make bearing D40 UKP 209 with Adapter Sleeve D40 H2309X and Rubber Damper D45(YET209) & D40 (UK209) or equivalent SKF make bearing with adapter sleeve and Rubber Damper for BDB 560C fan model of Kruger make.
FYH make bearing D55 UKP 212 with Adapter Sleeve D55 H2312X and Rubber Damper D45(YET209) & D40 (UK209) or equivalent SKF make bearing with adapter sleeve and Rubber Damper for BDB 800T fan model of Kruger make.
FYH make bearing D50 UK 211 with Adapter Sleeve D50 H2311X and Rubber Damper D50(UK 211) or equivalent SKF make bearing with adapter sleeve and Rubber Damper for BDB 710C fan model of Kruger make.
FYH make bearing D35 UK 208 with Adapter Sleeve D35 H2308X and Rubber Damper D40(YET208) & D35 (UK208) or equivalent SKF make bearing with adapter sleeve and Rubber Damper for BDB 500C fan model of Kruger make.
FYH make bearing D45 UKP 210 with Adapter Sleeve D45 H2310X and Rubber Damper D45(UK 210) or equivalent SKF make bearing with adapter sleeve and Rubber Damper for BDB 630C fan model of Kruger make.
FYH make bearing D60 UKP 213 with Adapter Sleeve D60 H2313X and Rubber Damper D45(YET209) & D40 (UK209) or equivalent SKF make bearing with adapter sleeve and Rubber Damper for BDB 900T fan model of Kruger make.
SKF make bearing 2215 EK with adapter sleeve and rubber damper for NADW 760 fan model of NADI make.
SKF make bearing 22217 EK with adapter sleeve and rubber damper for NASW 1245 fan model of NADI make
SKF make bearing 22215 EK with adapter sleeve and rubber damper for NASW 925 fan model of NADI Make.
Supply and installation of fan bearing housing as per existing make for cooling tower fan.as per clause 5 of TSS
10 HP/ 720 RPM Cooling tower fan bearing housing
7.5 HP/ 560 RPM Cooling tower fan bearing housing
3 HP/560 RPM Cooling tower fan bearing housing
Supply and installation of belt of Fenner (Poly-F Plus) or equivalent make for AHUs & centrifugal blower, if existing fitted belt are found defective, worn out etc.(at H-09,10&11) as per clause 5 of TSS
Belt for AHU's Fan having size 74 X 2B
Belt for AHU's Fan having size 93 X 4B
Belt for Centrifugal blower having size SPC -4000
Belt for AHU's Fan having size 67 X 2B
Belt for AHU's Fan having size 85 X 3B
Belt for AHU's Fan having size 84 X 3B
Belt for Centrifugal blower having size SPB 3000
Belt for AHU's Fan having Fan Model 800 T, Kruger Make
Belt for AHU's Fan having model no 900 T, Kruger Make
Flat Belt for cooling Tower as per clause 5 of TSS
Flat belt for 10 HP cooling tower
Flat belt for 7.5 HP cooling tower
Flat belt for 3 HP cooling tower
Overhauling of LT motors of following capacities once in contract period as per clause 15.0 of Technical Specification
Upto 7.5 KW capacity motor
Above 7.5 KW to 15 KW capacity motor
Above 15 KW to 30 KW capacity motor
Above 30 KW to 45 KW capacity motor
90 KW capacity motor
Half yeraly servicingng of of LT motors of following capacities as per clause 16.0 of Technical Specification.
Upto 7.5 KW capacity motor
Above 7.5 KW to 15 KW capacity motor
Above 15 KW to 30 KW capacity motor
Above 30 KW to 45 KW capacity motor
90 KW capacity motor
Supply and installation of ball and roller bearing at Drive End and Non Drive end of following capacity motor as per clause 17.0 of Technical Specification.
Upto 7.5 KW capacity motor
Above 7.5 KW to 15 KW capacity motor
Above 15 KW to 30 KW capacity motor
Above 30 KW to 45 KW capacity motor
90 KW capacity motor
Rewinding of motors as per clause 18.0 of Technical Specification.
Upto 7.5 KW capacity motor
Above 7.5 KW to 15 KW capacity motor
Above 15 KW to 30 KW capacity motor
Above 30 KW to 45 KW capacity motor
90 KW capacity motor
Supply and installation of cooling fan suitable for motors in the following range as per clause 19.0 of Technical Specification.. For small ranges the fan made out of plastic can be acceptable. However for higher H.P range, the fan made out of cast iron is preferred.
Upto 7.5 KW capacity motor
Above 7.5 KW to 15 KW capacity motor
Above 15 KW to 30 KW capacity motor
Above 30 KW to 45 KW capacity motor
90 KW capacity motor
Supply and installation of terminal plate with studs made out of brass for motors of fololowing rating as per clause 20.0 of Technical Specification..
Upto 7.5 KW capacity motor
Above 7.5 KW to 15 KW capacity motor
Above 15 KW to 30 KW capacity motor
Above 30 KW to 45 KW capacity motor
90 KW capacity motor
Repair of end shield & Bearing housing for motors of fololowing rating as per clause 21.0 of Technical Specification..
Upto 7.5 KW capacity motor
Above 7.5 KW to 15 KW capacity motor
Above 15 KW to 30 KW capacity motor
Above 30 KW to 45 KW capacity motor
90 KW capacity motor
Supply & installation of Air filter for AHU & Fresh air unit as per technical specification, if existing fitted AHU filters are found defective, worn out etc. as per clause No. 5. of specifications in CFB & Hall-09,10 &11.
3 ply HDPE washable filter of 50 mm thick depth for AHU (Total 110 nos filters) at CFB, Hall-9 to 11
5 ply HDPE washable filter of 150 mm thick depth for Fresh air units (Total 12 nos filters) at CFB, Hall-9 to 11
Air filter (Coarse Type) of 50 mm thick depth for AHU at CFB, Hall-09,10 &11.
Air filter (Fine Filter) of 300 mm thick depth for AHU & Filter Bank at CFB, Hall-09,10 &11.
Supply and application of Chemicals as per clause – 6.0. of technical specification. (at CFB and Hall-09,10&11)
Supply and application of Cleaning Chemical (Vaniklin-WB by M/s Vasu Chemicals or equivalent) for cleaning of cooling coil, filters, blowers and other HVAC components.
Supply and periodic dosing of Algaecide Chemical (Bionil-9225 by M/s Vasu Chemicals or equivalent) in cooling tower as instructed by EIC.
Repair of cooling tower basin FRP lining by filling up the gap in joint with fibre, chemical bonding material, resin etc.as per clause No. 7.0. Technical Specification.
Supply and installation of PVC Fills including take out old/damaged PVC fills as per clause no 8.0 of TSS
Supply and installation of ABS Body Spray Nozzle of cooling tower as per clause no 9.0 of TSS
Supply and installation of PVC Mist Eliminatores as per clause no 10.0 of TSS
Supply, Fabrication & installation of 1.0 mm (20 Gauge) thickness GI ducting as per site conditions complete with suitable supports as per clause no. 11.0 of tender specification and instruction of EIC. Structural steel required for installation of GI ducting shall be paid separately under item MS structure. Removing & refixing of false ceiling tiles and replacing damaged false ceiling tiles for erection of ducting, damper etc., if any, during erection shall be in the scope of this item.
Supply & installation of MS structure as per clause no. 12.0 of tender specification and instruction of EIC.
Supply and Installation of Name Plate made of SS material for all AHU rooms Pump rooms etc.(approx. 100 numbers) as per clause 13.0 of TSS
Labelling of different details with Radium stickers in service rooms as per clause no 13.0 of TSS
Comprehensive maintenance of the following equipments for a period of Eighteen months ie, from 1st quarter to 4th quarter (From 1st day to end of 12th month) as per clause no. 14.0 of specifications. Payment shall be made in each quarter. Bidders are requested for site visit during Pre-bid to access the condition of the equipments.
Vane Axial Fans: 600mm dia. 6000 CFM, 36 mm WG (8 nos. X 12 months=96 months).
16.5 TR (5.5 X 3 nos. compressor each) capacity package units (Qty: 2 nos.) of M/s Blue Star make (Model No.: DPA 1983 R1) for ApSD area on 2nd floor (2 nos. X 12 months=24 months).
8.75 TR (2 nos. compressor) capacity package units (Qty: 2 nos.) of M/s Blue Star make (Model No.: DPA 1052 R1) for RP&CD area on Ground floor. (2 nos. X 12 months=24 months).
5.5. TR (Single compressor) capacity package units (Qty: 2 nos.) of M/s Voltas make (Model No.: DPUASC55R407) for RP&CD area on First floor. (2 nos. X 12 months=24 months).
11 TR (2 nos. ODU) capacity Air-cooled Ducted Split Air conditioners (Qty: 4 nos.) of M/s Blue Star make (Model No.: DSA1322R1) for area located on third floor. (4 nos. X 12 months=72 months).
DX type Fresh air unit of 11 TR capacity (5.5 TR X 2 nos distributor) along with 2 nos. air cooled packaged condensing unit of cooling capacity 5.5 TR each for area on third floor. (1 nos. X 12 months= 12 months).
From 1st quarter to 4th quarter (From 1st day to end of 12th month) of Daikin make11 TR ductable split Unit of daikin make ( 03 No) at H-10
Air cooled Chiller of National make having 5 TR capacity
Cleaning of 4.5*4.8*.45 m Kitchen hood and its Grease filter at CFB(2 Nos.)
Comprehensive maintenance of the following equipments for a period of eighteen months ie, from 5th quarter to 8th quarter (From 13th month to end of 24th month) as per clause no. 14.0 of specifications. Payment shall be made in each quarter. Bidders are requested for site visit during Pre-bid to access the condition of the equipments.
Vane Axial Fans: 600mm dia. 6000 CFM, 36 mm WG (8 nos. X 12 months=96 months).
16.5 TR (5.5 X 3 nos. compressor each) capacity package units (Qty: 2 nos.) of M/s Blue Star make (Model No.: DPA 1983 R1) for ApSD area on 2nd floor (2 nos. X 12 months=24 months).
8.75 TR (2 nos. compressor) capacity package units (Qty: 2 nos.) of M/s Blue Star make (Model No.: DPA 1052 R1) for RP&CD area on Ground floor. (2 nos. X 12 months=24 months).
5.5. TR (Single compressor) capacity package units (Qty: 2 nos.) of M/s Voltas make (Model No.: DPUASC55R407) for RP&CD area on First floor. (2 nos. X 12 months=24 months).
11 TR (2 nos. ODU) capacity Air-cooled Ducted Split Air conditioners (Qty: 4 nos.) of M/s Blue Star make (Model No.: DSA1322R1) for area located on third floor. (4 nos. X 12 months=48 months).
DX type Fresh air unit of 11 TR capacity (5.5 TR X 2 nos distributor) along with 2 nos. air cooled packaged condensing unit of cooling capacity 5.5 TR each for area on third floor. (1 nos. X 12 months= 12 months).
From 5th quarter to 8th quarter (From 13th month to end of 24th month) of Daikin make11 TR ductable split Unit of daikin make ( 03 No) at H-10
Air cooled Chiller of National make having 5 Tr capacity
Cleaning of 4.5*4.8*.45 m Kitchen hood and its Grease filter at CFB(2 Nos.)
TF Air Systems Pvt Ltd
AIRTEK HVAC LLP
BRITE INDUSTRIES
Powermech Services Private Limited
M/s Associated Engineers
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 11.01 MB
TechnicalBid.xls
Tender Documents • 0.32 MB
Tender_document.pdf
Tender Documents • 1.30 MB
Notice.pdf
Tender Documents • 0.07 MB
BOQ_850985.xls
BOQ • 0.35 MB
Man_Power_Recovery_sheet.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .