Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC MIG 39 KUSHA BHAU THAKRE AWAS KHARMORA KORBA CG 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | ₹14.1 L | L1 | Accepted-AOC Technically and financially eligible L1 Bidder |
| 2 | L2₹14.8 LRejected-Finance | ₹14.8 L | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹15.0 LRejected-Finance KORBA | KORBA | CHHATTISGARH | 495119 | ₹15.0 L | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹15.9 LRejected-Finance BEHIND OF PAWAN TALKIES ROAD KORBA CG 495678 | 495678 | ₹15.9 L | L4 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | RVN VENTURES L1 | SATPAL SHARMA L4 | USHA CONSTRUCTION L2 | S.B Construction L3 |
|---|---|---|---|---|---|---|---|
| 1.00Civil Works | |||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 171.14 | Cum | 90 ₹15,402.42 | 108.21 ₹18,519.42 | 100 ₹17,113.8 | 80 ₹13,691.04 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 40 mm nominal size). | 23.36 | Cum | 2,500 ₹58,408.01 | 2,914.66 ₹68,095.71 | 2,000 ₹46,726.41 | 1,800 ₹42,053.77 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 61.71 | Cum | 2,802 ₹1,72,921.92 | 3,813.43 ₹2,35,341.1 | 3,500 ₹2,15,998.12 | 2,800 ₹1,72,798.49 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 16.85 | Cum | 4,000 ₹67,407.12 | 4,457.74 ₹75,120.91 | 4,000 ₹67,407.12 | 3,500 ₹58,981.23 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 273.67 | Sqm | 332 ₹90,859.1 | 375.35 ₹1,02,723.7 | 200 ₹54,734.4 | 350 ₹95,785.2 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 239.67 | Sqm | 150 ₹35,950.8 | 158.03 ₹37,875.69 | 100 ₹23,967.2 | 150 ₹35,950.8 |
| 1.07 | Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand ) | 7.25 | cum | 2,181 ₹15,809.25 | 2,877.57 ₹20,858.45 | 3,000 ₹21,745.87 | 2,000 ₹14,497.25 |
| 1.08 | Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in :
- Cement mortar 1:6 (1 cement : 6 coarse sand) | 43.49 | cum | 3,370 ₹1,46,567.15 | 3,583.49 ₹1,55,852.12 | 3,000 ₹1,30,475.21 | 2,500 ₹1,08,729.34 |
| 1.09 | 12 mm cement plaster of mix : 1:6 (1cement: 6 coarse sand) | 1,797.7 | Sqm | 75 ₹1,34,827.2 | 129.53 ₹2,32,849.81 | 120 ₹2,15,723.52 | 100 ₹1,79,769.6 |
Tender Value
₹27.6 L
EMD Value
₹34,600
Closing Date
18 May 2026, 5:00 pmClosed
Staff Officer SECL Korba
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Construction of boundary wall around Panchayat bhawan and Primary school Jamchua at Arda village of Korba Area
2026_SECL_359146_1
SECL/GM/KA/C/e-Tender/26-27/15 Dt. 05.05.2026
Open Tender
Civil Works - Others
180 days
Office of General Manager SECL Korba Area 495677
As per NIT
3 documents required · 3 mandatory
₹34,600
3 Jul 2026
6 May 2026
20 May 2026
7 May 2026
18 May 2026
7 May 2026
7 May 2026 - 11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 171.14 | Cum | 187.35 | ₹32,062.7 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 40 mm nominal size). | 23.36 | Cum | 5,046.15 | ₹1,17,894.24 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 61.71 | Cum | 6,602.2 | ₹4,07,446.5 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 16.85 | Cum | 7,717.7 | ₹1,30,056.98 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 273.67 | Sqm | 649.85 | ₹1,77,845.75 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 239.67 | Sqm | 273.6 | ₹65,574.26 |
| 1.07 | Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand ) | 7.25 | cum | 4,981.95 | ₹36,112.27 |
| 1.08 | Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in :
- Cement mortar 1:6 (1 cement : 6 coarse sand) | 43.49 | cum | 6,204.1 | ₹2,69,827.07 |
| 1.09 | 12 mm cement plaster of mix : 1:6 (1cement: 6 coarse sand) | 1,797.7 | Sqm | 224.25 | ₹4,03,133.33 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_372011.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 1.48 MB
Tendernotice_3.pdf
PDF • 0.07 MB
BOQ_372011.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid