Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹33 L
Closing Date
20 Jul 2020, 3:00 pmClosed
JV Choudhary, Sc E
CHESS, Vignyana Kancha Post, Hyderabad 500069
Establishment of Controlled Environment Facility for Integration and Testing of High Power Lasers, Optical Components and Optical Systems
2020_DRDO_560580_1
CHESS/BU/C/2020-21/ST/OBM/07
Open Tender
Civil Construction Goods
450 days
CHESS, Vignyana Kancha Post, Hyderabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹33 L
Yes
CHESS SINT Conference Hall
23 Dec 2020
22 May 2020
21 Jul 2020
22 May 2020
20 Jul 2020
24 Jun 2020
23 Jun 2020
Amount
Establishment of Controlled Environment Facility for Integration and Testing of High Power Lasers, Optical Components and Optical Systems:-
Door interlocks (vide 2.2 of specs)
Laser protective panels (vide 2.6 and 2.10 of specs)
Laser beam guiding hollow pipes (assorted) (vide 2.7 of specs)
Stand for laser beam guiding hollow pipes (assorted) with support (vide 2.8 of specs)
Optical tables (type – I) with passive vibration isolation stand (vide 3.9.1 of specs)
Optical tables (type – II) with passive vibration isolation stand (vide 3.9.2 of specs)
Optical tables (type – III) with passive vibration isolation stand (vide 3.9.3 of specs
Optical tables (type – IV) with passive vibration isolation stand (vide 3.9.4 of specs
Optical tables (type – V) with passive vibration isolation stand(vide 3.9.5 of specs
Optical tables (type – VI) with Rigid support (vide 3.9.6 of specs)
Optical tables (type – VII) with Rigid support (vide 3.9.7 of specs)
Work benches (Type – I) (vide 3.9.8 of specs)
Work benches (Type – II) (vide 3.9.9 of specs)
Storage cabinet: Type – I (vide 3.9.10 of specs)
Storage cabinet: Type – II (vide 3.9.11 of specs)
Light equipment movement platform (vide 3.9.12 of specs)
Nitrogen cylinder housing and distribution interface (vide 4.0 and 4.3 of specs)
Process water manifold (vide 5.0, 5.2 and 5.3 and 5.4 of specs)
Controlled environment design cost (vide 6.2 of specs)
Controlled environment wall panels (vide 6.4 of specs)
Controlled environment supporting channels
Ceiling Panels (vide 6.5 of specs)
Flush Double-Glazed Controlled environment View panels(vide 6.6.0 of specs)
Emergency doors(vide 6.1 and 6.6.0 of specs)
Controlled environment Doors(vide 6.1 and 6.6.0 of specs)
Antistatic vinyl flooring (vide 6.5 of specs)
Air shower (vide 6.15 of specs)
Garments cubicle(vide 6.15 of specs)
Shoe racks(vide 6.15 of specs)
HEPA filter H14 (Terminal Hooded type) (vide 6.3.5 of specs)
Chilled water distribution system (vide 6.9.0 of specs)
Chiller Units (vide 6.8.0 of specs)
Water pumps (vide 6.9.0 of specs)
Pressurization units (vide 6.9.0 of specs)
Air handling units (vide 6.10.0 of specs)
Air blower units (vide 6.10.0 of specs)
Air distribution system, ducting (vide 6.11.0 of specs)
Humidifier, (vide 6.7 of specs)
Hot water distribution systems (vide 6.7.6 of specs)
Building management system (BMS) with temperature, RH and pressure sensors (vide 6.12.0 of specs)
Fire detection system (Fire alarm system) and manual suppression systems (vide 6.13.0 of specs)
Fire extinguishers (vide 6.13.5 and 6.13.6 of specs)
AHU support structure (vide 6.16 of specs)
Controlled environment light fixtures for illuminations (vide 6.3.3 of specs)
LAN cables (Vide 6.14.4 to 6.14.18 of specs)
Intercom cables (vide 6.14.2 of specs)
Camera for CCTV surveillance (vide 6.14.0, 6.14.11, 6.4.12 and 6.14.13 of specs))
Router / Switches for LAN (vide 6.14 of specs)
LAN points (Vide 6.14.4 to 6.14.18 of specs)
Intercom points (vide 6.14.3 of specs)
CCTV cameras (vide 6.14.0, 6.14.1, 6.4.10 and 6.14.11 of specs))
Any items not mentioned here but required to complete the scope of work if any (details to be given)
Three phase 63 A sockets (vide 7.13-7.16 of specs)
Three phase 100 A sockets (vide 7.13-7.16 of specs)
Three phase 180 A sockets (vide 7.13-7.16 of specs)
Three phase 32 A sockets (vide 7.13-7.16 of specs)
Single phase 32 A sockets (vide 7.12 of specs)
Single phase 5A/15 A universal sockets (vide 7.17 of specs)
Chemical erthing and cabling (vide 7.6 of specs)
Electrical Distribution Panel as per scope of work (vide 7.5 of specs)
Cables for single phase 5A/15 A sockets (vide 7.17 of specs)
MCBs / equivalent - 63 A (3 phase ) (vide 7.13-7.16 of specs)
MCBs / equivalent -100 A (3 phase ) (vide 7.13-7.16 of specs)
MCBs / equivalent - 180 A (3 phase ) (vide 7.13-7.16 of specs)
MCBs / equivalent - 32 A (3 phase ) (vide 7.13-7.16 of specs)
Cables for 63 A / 32 A three phase (vide 7.0 of specs)
Cables for 63 A three phase (vide 7.0 of specs)
Cables for 63 A three phase (vide 7.0 of specs)
Cables 32 A single phase (vide 7.0 of specs)
MCBs /equivalent - 32 A (single phase, Vide 7.12 of specs)
Establishment of air conditioning with coarse air filtration (vide 8.0 of specs)
Installation charges (vide 1.1 of specs)
Third party validation charges (vide 6.17 of specs)
AMC Charges (vide 6.18 of specs)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid