Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAdmitted-Finance | ₹24.7 L | L1 | Admitted-Finance |
| 2 | L2₹24.9 L+₹21,040 (0.85%)Admitted-Finance | ₹24.9 L+₹21,040 (0.85%) | L2 | Admitted-Finance |
| 3 | L3₹25.0 L+₹22,662 (0.92%)Admitted-Finance | ₹25.0 L+₹22,662 (0.92%) | L3 | Admitted-Finance |
| 4 | L4₹37.4 L+₹12.7 L (51.4%)Admitted-Finance | ₹37.4 L+₹12.7 L (51.4%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Rejected as per request |
| Sl No | Description | Qty | Unit | M/S BHAT ELECTRICALS L1 | KHAN ELECTRICAL CONSTRUCTION AND SUPPLIERS L4 | QURESHI & CO L2 | M/S KHAN BROTHERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 250 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, cu. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. | 1 | No. | 8,50,650 ₹8,50,650 | 9,00,000 ₹9,00,000 | 4,80,000 ₹4,80,000 | 2,00,000 ₹2,00,000 Lowest |
| 2.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 13 Mtr Long (410-SP-69) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 4 | No. | 28,500 ₹1,14,000 Lowest | 40,000 ₹1,60,000 | 35,000 ₹1,40,000 | 35,000 ₹1,40,000 |
| 3.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 11 Mtr Long (410-SP-56) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 5 | No. | 28,400 ₹1,42,000 | 32,000 ₹1,60,000 | 28,000 ₹1,40,000 Lowest | 33,000 ₹1,65,000 |
| 4.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 20 | No. | 28,100 ₹5,62,000 | 28,000 ₹5,60,000 | 26,000 ₹5,20,000 Lowest | 32,000 ₹6,40,000 |
| 5.00 | Supply , Carriage upto site , Laying , stringing, tensioning and binding of 50 mm2 ACSR Conductor (Rabbit) , including joints by PG clamps wherever required as per REC standard. | 4.5 | kms | 42,500 ₹1,91,250 Lowest | 1,20,000 ₹5,40,000 | 75,000 ₹3,37,500 | 80,000 ₹3,60,000 |
| 6.00 | Cement bottoming of S T Ploes 13Mtrs long in 1:2:4 mix , 0.78 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 4 | No | 1,200 ₹4,800 Lowest | 6,000 ₹24,000 | 2,000 ₹8,000 | 3,524 ₹14,096 |
| 7.00 | Cement bottoming of S T Ploes 11Mtrs long in 1:2:4 mix , 0.66 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 5 | No | 1,100 ₹5,500 Lowest | 5,000 ₹25,000 | 2,000 ₹10,000 | 4,000 ₹20,000 |
| 8.00 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix , 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 20 | No | 1,000 ₹20,000 Lowest | 5,000 ₹1,00,000 | 2,000 ₹40,000 | 3,500 ₹70,000 |
| 9.00 | Supply & fixing of GI nuts and bolts of sizes | 72 | No | 130 ₹9,360 Lowest | 150 ₹10,800 | 300 ₹21,600 | 189 ₹13,608 |
| 10.00 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 36 | No | 680 ₹24,480 Lowest | 1,500 ₹54,000 | 1,000 ₹36,000 | 900 ₹32,400 |
Tender Value
₹24.8 L
EMD Value
₹49,500
Closing Date
15 Jun 2026, 4:00 pmClosed
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
Errection/Extension of 11kv Hot line and Creation of 250kva Sub Station for court complex Handwara under juridiction of ED Handwara for FY 2026-27
2026_PDD_311003_1
e-NIT 08 of 2025-26
Open Tender
Electrical Works
Turn-key
120 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹1,000
Office of Executive Engineer ED Handwara
₹49,500
24 Jun 2026
26 May 2026
16 Jun 2026
26 May 2026
15 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 250 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, cu. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. | 1 | No. | - | - |
| 2 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 13 Mtr Long (410-SP-69) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 4 | No. | - | - |
| 3 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 11 Mtr Long (410-SP-56) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 5 | No. | - | - |
| 4 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 20 | No. | - | - |
| 5 | Supply , Carriage upto site , Laying , stringing, tensioning and binding of 50 mm2 ACSR Conductor (Rabbit) , including joints by PG clamps wherever required as per REC standard. | 4.5 | kms | - | - |
| 6 | Cement bottoming of S T Ploes 13Mtrs long in 1:2:4 mix , 0.78 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 4 | No | - | - |
| 7 | Cement bottoming of S T Ploes 11Mtrs long in 1:2:4 mix , 0.66 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 5 | No | - | - |
| 8 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix , 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 20 | No | - | - |
| 9 | Supply & fixing of GI nuts and bolts of sizes | 72 | No | - | - |
| 10 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 36 | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.08 MB
BOQ_1006739.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .