Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹16.2 L+₹63,142.46 (4.04%)Rejected-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L2 | Rejected-Finance TC recommendation |
Tender Value
₹15.6 L
EMD Value
₹19,600
Closing Date
11 Aug 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 1000mm. Wide x150 mtr. long belt conveyor at 30L and 54 dip to 58 dip and 10 mtr. discharge point at Mill. Incline of Shankarpur colliery
2023_ECL_284390_1
ECL/GM/BA/E TENDER/23-24/EnM/42 Dt. 25.07.2023
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Shankarpur Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹19,600
20 Sept 2023
26 Jul 2023
12 Aug 2023
26 Jul 2023
11 Aug 2023
26 Jul 2023
26 Jul 2023 - 31 Jul 2023
Amount
Item Description/ Heading
Installation with transportation of 1000mm. Size single drive unit installation at 48 dip/30L with single gear, single motor, drum 02 nos. with base frame =9.80 mt+ discharge unit 2.48 mt. + switch starter 1.20 mt. + 1000mm. Wide structure 150 mtr.@ 68kg/ mtr. = 10.20 mt. +tailend 5 time @ 0.80mt= 4.00 mt + loadtable 9 time @ 1.00 mt= 9.00 mt. = total 36.68 mt.
Making loadtable 1no.
Making scapper
Belt laying including transportation of belt, tenssioning, joining & trial run etc (2 x140) =280 mtr.+20 mtr. at discharge point.= 300 mtr.
Providing bolt & nuts for fitting of above structure 150 mtr. @1.25kg/mtr.= 187.5 kg.
Foundation bolting for jamming drive unit 32 nos. + discharge unit 20 nos. + tailend 30 nos. = 82 nos.
Concrete job above belt i.e foundation of drive base, gear base, motor base, discharge & tailend = 6.40 cum
Making vertical support from roof & floor for hanging the conveyor structure from drive head to discharge by welding,gas cutting etc considering cost of consumeable
Total impact of GST for the purpose of CTC
BABLU SINHA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .