Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 L+₹39.47 (<0.01%)Rejected-AOC | ₹4.2 L+₹39.47 (<0.01%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SELVANAYAGI BUILDERS & DEVELOPERS L1 | SRI MARUTHAMALAYAAN ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain etc complete as per direction of departmental officers. | 7 | M3 | 108 ₹756 Lowest | 127.84 ₹894.88 |
| 2.00 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 6 | M3 | 4,311 ₹25,866 | 0.5 ₹3 Lowest |
| 3.00 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 14 | M3 | 486 ₹6,804 Lowest | 572.25 ₹8,011.5 |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 50 | M3 | 108 ₹5,400 Lowest | 128 ₹6,400 |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 12 | M3 | 5,100 ₹61,200 Lowest | 5,500 ₹66,000 |
| 6.00Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | |||||
| 6.01 | i. Drain | 223 | M2 | 454 ₹1,01,242 Lowest | 534 ₹1,19,082 |
| 6.02 | ii.Slab bottom | 6 | M2 | 1,003 ₹6,018 | 0.5 ₹3 Lowest |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm gauge hard broken granite stone jelly for All CC items of work xcluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 28 | M3 | 5,748 ₹1,60,944 Lowest | 6,650 ₹1,86,200 |
| 8.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 48 | M2 | 263 ₹12,624 Lowest | 309 ₹14,832 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
24 Jun 2026, 3:00 pmClosed
Assisstant Commissioner-West Zone
West Zone, Coimbatore Corporation
Reconstruction of storm water drain at AD colony in Ward no 39of west zone.
2026_MAWS_681513_14
E1/WESTZONE/2026
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per document attached
4 documents required · 4 mandatory
₹0
₹6,000
Yes
21 Aug 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
24 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting the existing drain etc complete as per direction of departmental officers. | 7 | M3 | - | - |
| 2 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 6 | M3 | - | - |
| 3 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 14 | M3 | - | - |
| 4 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 50 | M3 | - | - |
| 5 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 12 | M3 | - | - |
| 6Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | |||||
| 6.01 | i. Drain | 223 | M2 | - | - |
| 6.02 | ii.Slab bottom | 6 | M2 | - | - |
| 7 | Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm gauge hard broken granite stone jelly for All CC items of work xcluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 28 | M3 | - | - |
| 8 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 48 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.88 MB
SWD.pdf
Tender Documents • 0.85 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_819166.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .