Road Protection Work on Pahara rudayan ODR Road in FY 2026-27
2026_CEALG_1163262_1
1143/16A Dt 15-06-2026
Open Tender
Civil Works - Others
180 days
Etah
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
Yes
₹1.9 L
Yes
23 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
23 Jun 2026 - 30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface :- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. I/C cost of material, labour, T&P and all Taxes but Excluding GST | 1,850 | Sqm | 615 | ₹11,37,750 | BI01010001010000000000000515BI0100001116 |
Type - A, "W": Metal Beam Crash Barrier Providing and erecting a "w metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150×75×5 mm spaced 2 m centre to centre, 1.8 m high. 1.1 m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fittings to conform to IS: 1367 and 18:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150×75×5 mm, 330 mm long complete as per clause 810. I/C cost of material, labour, T&P and all Taxes but Excluding GST | 200 | Rm | 3,100 | ₹6,20,000 | - | |
Direction and place Identification signs up to 0.90 sqm size Board : Providing and erecting direction and place identification retro-reflectorised sign as per IRC-67 made of high intensity grade sheeting The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage, flexibility. liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from International/Government Laboratory Institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D 4956-09) on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer/Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67:2012. Legends , letters, numerals and borders etc should be as per MORTH specification No-801.3.7. Sheet fixed over aluminium sheeting 2 mm thick with area not exceeding 0.9 sqm. Supported on a mild steel single angle iron post 75×75×6 mm firmly fixed to the ground by means of property designed foundation with M-15 grade cement concrete 45×45×60 cm., below ground level as per approved drawing, complete. I/C cost of material, labour, T&P and all Taxes but Excluding GST | 12 | No. | 6,300 | ₹75,600 | - | |
Maintenance Charges for Road Signage Part
Maintenance Charge including repair of painted surface, earthwork on patri etc complete as per direction of E.I. for the period of five years from the actual date of completion of work.
For First Year @ Zeero % | 1 | Job | - | - | - | |
Maintenance Same as Item No. 4 but for Second Year 0.25% of cost of total executed Work | 1 | Job | - | - | - | |
Maintenance Same as Item No. 4 but for Third Year 0.50% of cost of total executed Work | 1 | Job | - | - | - | |
Maintenance Same as Item No. 4 but for Fourth Year 0.75% of cost of total executed Work | 1 | Job | - | - | - | |
Maintenance Same as Item No. 4 but for Fifth Year 1.00% of cost of total executed Work | 1 | Job | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_2180739.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid