Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹79.1 Cr
Closing Date
20 Jul 2026, 5:00 pm
CE(MPS), UPRVUNL
CE(MPS), UPRVUNL 12th Floor Shakti Bhawan Lucknow
Request for selection of Developer for setting up of minimum 640 MW Pumped Hydro Storage Plant PSP by using upper reservoir at Rihand dam and lower reservoir at Obra Dam at Distt Sonebhadra UP on TBCB basis
2026_UPJVN_1117341_1
03/E-Tender/Jal Vidyut/2026
Global Tenders
Power/Energy Projects/Products
Sonebhadra
As per Bid Document
3 documents required · 3 mandatory
₹35.4 L
UP Rajya Vidyut Utpadan Nigam Ltd
₹79.1 Cr
12th Floor Shakti Bhawan Lucknow
18 Feb 2026
18 Feb 2026
22 Jul 2026
18 Feb 2026
20 Jul 2026
18 Feb 2026
18 Feb 2026 - 2 Mar 2026
6 Mar 2026
The bidder is required to quote the Annual Fixed Charge (INR/MW/Annum) excluding GST. . NOTE: 1. If any subsidy, concession, or discount is granted by the State Government or others, the bidders are required to quote the Annual Fixed Charges after duly factoring the aforesaid subsidy/ concessions/discounts. 2. The Bidder shall submit the details of the incentive / discounts considered while arriving at his quoted AFC. 3. Final Evaluation will be carried out seperately based on tariff quoted by Bidders and cycle losses in confirmance to conditions of RFS .
The bidder is required to quote theCycle Loss in percentage (%) . NOTE : The quoted Cycle Loss % shall be fixed for the entire term of the Pumped Storage purchase Agreement (PSPA) at the delivery point. We also undertake that the above declared Cycle Loss shall in no case be more than [25]% on an annual basis.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_2076077.xls
BOQ • 0.27 MB
PSPTENDERDOC.pdf
Tender Documents • 2.32 MB
TIMEEXTENPSP5th.pdf
PDF • 0.32 MB
TIMEEXTENPSP4.pdf
PDF • 0.20 MB
TimeExtentionPSP3.pdf
PDF • 0.20 MB
PSPEXT2.pdf
PDF • 0.20 MB
dateextensionpsp.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid