Tender Value
₹4.5 L
EMD Value
₹8,980
Closing Date
10 Jun 2026, 6:00 pmClosed
XEN RMC DIVISION-II CAD ANTA
XEN RMC DIVISION-II CAD ANTA
Construction of Pipe Culvert and Drain desilting of Baldara Catchment.
2026_CADKO_564471_32
nit 05 of 2026-27
Open Tender
Civil Works - Canal
Percentage
90 days
Anta
Construction of Pipe Culvert and Drain desilting of Baldara Catchment.
2 documents required · 2 mandatory
₹200
XEN RMC DIVISION-II CAD ANTA
₹8,980
Yes
17 Jun 2026
6 Jun 2026
11 Jun 2026
6 Jun 2026
10 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 10.1 Side shuttering including propping etc. complete (to achieve finish F 2 for 10.1.1 Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 34.19 | sqm | 160 | ₹5,470.4 |
| 2 | 18.1 Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
18.1.2 Thick | 23,200 | sqm | 2.5 | ₹58,000 |
| 3 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints.
(diametre) 900mm ( Excluding Labour Charges )
NP-3 Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints.
(diametre) 900mm (Labour Charges only) | 5 | RM | 6,344 | ₹31,720 |
| 4 | Excavation including loading, unloading, disposal and dressing of
excavated earth within initial lead of 50m and lift up to 1.5m including
dressing of excavated area and dewatering wherever required complete in all respect
(b)Hard / dense soil | 2,881.64 | Cum | 79 | ₹2,27,649.56 |
| 5 | 9.2 Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;
(For mix design Cement content considered 400 kg/ cum of concrete)
9.2.4 20 mm | 17.48 | cum | 5,744 | ₹1,00,405.12 |
| 6 | 9.8 Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto
9.8.4 20 mm | 5.46 | cum | 4,654 | ₹25,410.84 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
Tendernotice_2.pdf
PDF • 0.49 MB
BOQ_1005156.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .