Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 LAccepted-AOC VPO SARNA STATION PATHANKOT 145 025 PB | PATHANKOT | PUNJAB | 145025 | ₹32.8 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹33.0 L+₹19,577 (0.60%)Rejected-Finance | ₹33.0 L+₹19,577 (0.60%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹33.5 L+₹66,755 (2.03%)Rejected-Finance | ₹33.5 L+₹66,755 (2.03%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹37.3 L+₹4.5 L (13.7%)Rejected-Finance | ₹37.3 L+₹4.5 L (13.7%) | L4 | Rejected-Finance Other than L1 |
| 5 | L5₹42.3 L+₹9.5 L (28.9%)Rejected-Finance | ₹42.3 L+₹9.5 L (28.9%) | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | pardeep singh marwaha L4 | SUBASH MAHAJAN L1 | BUILDEX CONSTRUCTION CO L5 | JAGDISH SINGH ASSOCIATES L2 | M/S P.S CONSTRUCTION CO L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Racking out existing filling in dummy/construction joints upto 25mm width and depth as required to provide backup rod and minimum 15mm thick sealant compound and making it perfectly U shaped with vertical sides by means of mechanical cutter and ensure that joints should be cleaned to remove sealing compound from sides of joint , after cleaning and fanning with air compressor to make the joints free from all loose material (i.e. dirt/dust etc ) and provide polyethylene foam rod backup material of suitable size (Backup rod to be fixed with wooden roller) and applying primer of approved make to side and bottom of joints and filling with polyurethane sealant of approved make (minimum 15mm thick over backup rod) , all as manufacturer instruction and old material should be removed from Technical area as directed by Engineer-in-Charge.
Note: (1) Masking tape on edge of joint to be provided on top surface to give neat finish to sealant and removing the masking tape after sealant is applied.
(2) An exclusive team of 06 labourers for each task such as removing of existing fiiling, cleaning of open opened joint, finishing of edges with grinder/cutter, applying of primer by one forward stroke and second backward stroke of brush, then applying joint sealant after appropriate time gap and as directed by the Manufacturer's instruction.
(3) Quantity of joint filling material required shall be produced by contractor from approved manufacturer and store under supervision of Engr-in-Charge. Qty shall be procured in advance in cunsultation with Engr-in-Charge on quarterly basis. | 7,250 | RM | 255 ₹18,48,750 | 196 ₹14,21,000 Lowest | 320 ₹23,20,000 | 197.86 ₹14,34,485 | 205 ₹14,86,250 |
| 2.00 | Racking out existing filling in dummy/construction joints above 25mm wide upto 40mm wide (for more than 40mm width of joint, for every 25mm width additional length will be measured) and depth as required to provide backup rod and minimum 15mm thick sealant compound and making it perfectly U shaped with vertical sides by means of mechanical cutter and ensure that joints should be cleaned to remove sealing compound from sides of joint , after cleaning and fanning with air compressor to make the joints free from all loose material (i.e. dirt/dust etc ) and provide polyethylene foam rod backup material of suitable size (Backup rod to be fixed with wooden roller) and applying primer of approved make to side and bottom of joints and filling with polyurethane sealant of approved make(minimum 15mm thick over backup rod) , all as manufacturer instruction and old material should be removed from Technical area as directed by Engineer-in-Charge.
Note: (1) Masking tape on edge of joint to be provided on top surface to give neat finish to sealant and removing the masking tape after sealant is applied.
(2) An exclusive team of 06 labourers for each task such as removing of existing fiiling, cleaning of open opened joint, finishing of edges with grinder/cutter, applying of primer by one forward stroke and second backward stroke of brush, then applying joint sealant after appropriate time gap and as directed by the Manufacturer's instruction.
(3) Quantity of joint filling material required shall be produced by contractor from approved manufacturer and store under supervision of Engr-in-Charge. Qty shall be procured in advance in cunsultation with Engr-in-Charge on quarterly basis. | 5,000 | RM | 233 ₹11,65,000 | 206 ₹10,30,000 | 300 ₹15,00,000 | 200 ₹10,00,000 Lowest | 210 ₹10,50,000 |
| 3.00 | Repair to pop out spalled joints, corner, pot holes in concrete slab by cutting, chiselnng manually & mechanical cutter, side prependicular to a minimum depth of 2.5 to 3 cm and cleaned off all loose or broken material remove outside Technical area, cleaning the surface with mechanical blower to remove all dust/loose particle outside Technical area and repair concrete slab floor with elastomeric PU concrete incl apply primer as per manufacturer instruction to match the existing surface including fomwork where required complete all as specified. Make:- CIPY/SIKA/FOSROC and as per E-in-C's branch approvrd list
NOTES:
(1) Application shall be followed as per manufacture instruction.
(2) All the health and safety measurer shall be followed by the contractor during used of flexo elastromeric concrete.
(3) An exclusive team of adequate number of labourers for repair to joints/corners with elastromeric PU concrete shall be deployed by the contractor as per directions of Engr-in-Charge.
(4) The execution of 30% quantity is to be completed in within 60 days after acceptance of contract; failing to meet this execution target in the given due date shall incur irreversible panel recovery.
(5) For next 50% quantity is to be completed within 120 days after acceptance of contract; failing to meet this execution target in the given due date shall incur irreversible panel recovery.
(6) Last 20% quantity is to be completed in before completion date of contract given in the acceptance letter.
Recovery = (Target % of total qty of Sr. No. 4,5,6 of notes of this item - executed qty)x10% x quoted rate in Rs. | 2,000 | Per 1000 Cucm | 350 ₹7,00,000 | 396 ₹7,92,000 | 200 ₹4,00,000 Lowest | 427.86 ₹8,55,720 | 400 ₹8,00,000 |
| 4.00 | S&F Retro reflective coloured tape (colour as approved by GE) of approved make and width 15 cm complete all as specified and directed by Engr-in-charge. | 200 | RM | 90 ₹18,000 | 196 ₹39,200 | 50 ₹10,000 Lowest | 57.86 ₹11,572 | 63.52 ₹12,705 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
16 Jun 2026, 6:00 pmClosed
Sh Vishal Kumar
GE (AF) Pathankot
REPAIR TO JOINT FILLING OF RUNWAY PTT ALL TAXI AND ALL DISPERSAL AND CRACK FILLING OF FLEXIBLE PORTION OF RUNWAY AT AF STN PATHANKOT
2026_MES_760676_2
GE/PAF-09/2026-27
Open Tender
Civil Works
Item Rate
270 days
GE (AF) Pathankot
As per NIT
8 documents required · 8 mandatory
₹500
Yes
GE (AF) Pathankot
₹90,000
Yes
21 Sept 2026
26 May 2026
18 Jun 2026
26 May 2026
16 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Racking out existing filling in dummy/construction joints upto 25mm width and depth as required to provide backup rod and minimum 15mm thick sealant compound and making it perfectly U shaped with vertical sides by means of mechanical cutter and ensure that joints should be cleaned to remove sealing compound from sides of joint , after cleaning and fanning with air compressor to make the joints free from all loose material (i.e. dirt/dust etc ) and provide polyethylene foam rod backup material of suitable size (Backup rod to be fixed with wooden roller) and applying primer of approved make to side and bottom of joints and filling with polyurethane sealant of approved make (minimum 15mm thick over backup rod) , all as manufacturer instruction and old material should be removed from Technical area as directed by Engineer-in-Charge.
Note: (1) Masking tape on edge of joint to be provided on top surface to give neat finish to sealant and removing the masking tape after sealant is applied.
(2) An exclusive team of 06 labourers for each task such as removing of existing fiiling, cleaning of open opened joint, finishing of edges with grinder/cutter, applying of primer by one forward stroke and second backward stroke of brush, then applying joint sealant after appropriate time gap and as directed by the Manufacturer's instruction.
(3) Quantity of joint filling material required shall be produced by contractor from approved manufacturer and store under supervision of Engr-in-Charge. Qty shall be procured in advance in cunsultation with Engr-in-Charge on quarterly basis. | 7,250 | RM | - | - |
| 2 | Racking out existing filling in dummy/construction joints above 25mm wide upto 40mm wide (for more than 40mm width of joint, for every 25mm width additional length will be measured) and depth as required to provide backup rod and minimum 15mm thick sealant compound and making it perfectly U shaped with vertical sides by means of mechanical cutter and ensure that joints should be cleaned to remove sealing compound from sides of joint , after cleaning and fanning with air compressor to make the joints free from all loose material (i.e. dirt/dust etc ) and provide polyethylene foam rod backup material of suitable size (Backup rod to be fixed with wooden roller) and applying primer of approved make to side and bottom of joints and filling with polyurethane sealant of approved make(minimum 15mm thick over backup rod) , all as manufacturer instruction and old material should be removed from Technical area as directed by Engineer-in-Charge.
Note: (1) Masking tape on edge of joint to be provided on top surface to give neat finish to sealant and removing the masking tape after sealant is applied.
(2) An exclusive team of 06 labourers for each task such as removing of existing fiiling, cleaning of open opened joint, finishing of edges with grinder/cutter, applying of primer by one forward stroke and second backward stroke of brush, then applying joint sealant after appropriate time gap and as directed by the Manufacturer's instruction.
(3) Quantity of joint filling material required shall be produced by contractor from approved manufacturer and store under supervision of Engr-in-Charge. Qty shall be procured in advance in cunsultation with Engr-in-Charge on quarterly basis. | 5,000 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tender09.pdf
Tender Documents • 0.89 MB
CorrigendumNIT.pdf
Additional Documents • 3.04 MB
BOQ_860018.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .