| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹36.6 L+₹53,121 (1.47%)Rejected-Finance | L2 | Rejected-Finance REJECT |
| Sl No | Description | Qty | Unit | THE SHREE SHYAM JULANA COOPERATIVE LABOUR CONSTRUCTION SOCIETY LTD. JULANA L1 | The Shri Ganesh Cooperative Labour and Construction Society Ltd. Uchana L2 |
|---|---|---|---|---|---|
| 1.00NS items | |||||
| 1.01 | S/E of 45 watt led street light fitting (philips /bajaj/wipro/cromton/GE/havells) make including necessary conection | 4 | Each | 700 ₹2,800 | 100 ₹400 Lowest |
| 1.02 | S/E of 20 Watt LED Tube light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells/ Syska/ Surya) make including all patty material required to complete the job in all respect | 24 | Each | 125 ₹3,000 | 50 ₹1,200 Lowest |
| 1.03 | S/E of PVC insulated and FR PVC round seathed copper conductor (Flexible) wire 1100 V grade conforming to is 694 in pipe excluding cost and erection of pipe.
Size 1.50 sqmm ( 48 / 0.20mm) 2 core Copper cable | 40 | Per Metre | 60 ₹2,400 | 10 ₹400 Lowest |
| 1.04 | Rate anaiysis of S/E of 16 sqmm 4 core armaured cable of approved make including making necessary connetions | 90 | Metre | 190 ₹17,100 | 10 ₹900 Lowest |
| 1.05 | S/E of Water Cooler 40/80 Ltr. (Climatrol,Voltas, Usha ,) make including making necessery connections and all patty material required to complete the job in all respect. | 1 | NO. | 35,000 ₹35,000 | 15,000 ₹15,000 Lowest |
| 1.06 | S/E of R.O. 25 L.P.H.. (Livpure ,Kent,Aquaguard) make including making necessery connections and all patty material required to complete the job in all respect. | 1 | Each | 40,000 ₹40,000 | 3,000 ₹3,000 Lowest |
| 1.07 | S/E of PVC drain pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect. | 20 | sqft | 100 ₹2,000 | 10 ₹200 Lowest |
| 1.08 | S/E of copper pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect. | 20 | sqft | 250 ₹5,000 | 50 ₹1,000 Lowest |
| 1.09 | S/E of split A.C. 1.5 Ton 5 star (Lloyed/Voltas/Blue Star/Diakin) make including making necessary connections and all patty material required to complete the job in all respect. | 2 | Each | 40,000 ₹80,000 | 15,000 ₹30,000 Lowest |
Tender Value
₹42.0 L
EMD Value
₹1.3 L
Closing Date
18 Dec 2025, 3:00 pmClosed
POSHAN kanyan
Executive Engineer Jind
Construction of the building of Block Public Health Unit (BPHU) at existing campus of Community Health Centre (CHC) at village Alewa BLOCK ALEWA in District Jind.
2025_HRY_489083_1
202509B28A49 122D 4CC8 8041 4C35E2AF8D1A701DEV
Open Tender
Civil Works
Works
180 days
ALEWA
Construction of the building of Block Public Health Unit (BPHU) at existing campus of Community Health Centre (CHC) at village Alewa BLOCK ALEWA in District Jind.
3 documents required · 3 mandatory
₹5,000
₹1.3 L
Yes
26 Dec 2025
10 Dec 2025
19 Dec 2025
10 Dec 2025
18 Dec 2025
10 Dec 2025
Amount
NS items
S/E of 45 watt led street light fitting (philips /bajaj/wipro/cromton/GE/havells) make including necessary conection
S/E of 20 Watt LED Tube light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells/ Syska/ Surya) make including all patty material required to complete the job in all respect
S/E of PVC insulated and FR PVC round seathed copper conductor (Flexible) wire 1100 V grade conforming to is 694 in pipe excluding cost and erection of pipe. Size 1.50 sqmm ( 48 / 0.20mm) 2 core Copper cable
Rate anaiysis of S/E of 16 sqmm 4 core armaured cable of approved make including making necessary connetions
S/E of Water Cooler 40/80 Ltr. (Climatrol,Voltas, Usha ,) make including making necessery connections and all patty material required to complete the job in all respect.
S/E of R.O. 25 L.P.H.. (Livpure ,Kent,Aquaguard) make including making necessery connections and all patty material required to complete the job in all respect.
S/E of PVC drain pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect.
S/E of copper pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect.
S/E of split A.C. 1.5 Ton 5 star (Lloyed/Voltas/Blue Star/Diakin) make including making necessary connections and all patty material required to complete the job in all respect.
Bidder Name
Amount
THE SHREE SHYAM JULANA COOPERATIVE LABOUR CONSTRUCTION SOCIETY LTD. JULANA (GSTN-NA) BID ID -1388619
The Shri Ganesh Cooperative Labour and Construction Society Ltd. Uchana (GSTN-NA) BID ID -1386155
THE SHREE SHYAM JULANA COOPERATIVE LABOUR CONSTRUCTION SOCIETY LTD. JULANA (BID ID -1388619)
The Shri Ganesh Cooperative Labour and Construction Society Ltd. Uchana (BID ID -1386155)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_567258.xls
BOQ • 0.28 MB
AD0144358.pdf
Additional Documents • 0.78 MB
OT0144358.pdf
Other Document • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .