Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹30.2 LAccepted-AOC | L3 | Accepted-AOC Being L1 | |
| 2 | L2₹30.5 LRejected-AOC 1 TROPICAL REFRIGERATION PHONIX BAY PORT BLAIR PORT BLAIR ANDAMAN NICOBAR 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | L2 | Rejected-AOC Being Not L1 | |
| 3 | L3₹34.1 LRejected-AOC OPP MINI ZOO HADDO SOUTH ANDAMAN 744 102 | SOUTH ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744102 | L3 | Rejected-AOC Being Not L1 |
Tender Value
₹33.7 L
EMD Value
₹67,500
Closing Date
31 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Col Arvind Bhakuni, CWE Port Blair
Commander Works Engineer Military Engineer Services Junglighat Post Minniebay Port Blair-744103
81039 Periodical Maintenance of Central type AC plants at INHS Dhanvantari HQ 34 WEU and other connected items under AGE EM-I of GE Minniebay Port Blair
2023_MES_619545_1
81039 Maintenance of Central type AC GE Minniebay
Open Tender
Civil Works - Others
Item Rate
270 days
Port Blair
Class D Category c i
7 documents required · 7 mandatory
₹500
GE Minniebay
₹67,500
21 Dec 2023
19 Sept 2023
6 Nov 2023
19 Sept 2023
31 Oct 2023
17 Oct 2023
19 Sept 2023 - 27 Sept 2023
Amount
M&L for Servicing of the Air-conditioning Plant /unit of capacity 70 TR by checking the functioning of chiller unit/pump, checking of refrigerant , replenishing refrigerant gas if required, Checking of chilled pipeline, condenser pipeline, safety valves, compressor and connected accessories for its proper working and replenishing of compressor oil, checking of Microprocessor control panel and replacement of control panel wiring, lubricating the pump sets and fan motor including replacement of bearing and tightening of bolts and nuts complete all as specified and as directed. Note : - (i) The cost of compressor oil, PVC Cable for control panel wiring, grease for lubricating and bearing of motors shall be deemed to be included in the quoted rate. (ii) Refrigerant gas will be measured and paid separately. (iii) The quoted rate deemed to be inclusive of repair/replacement of defective safety of pressure rating 450 PSI all as per existing, repair/replacement of pitted control wiring/lugs/ferrules complete for ensuring proper functionality of AC plant.
M&L for De-scaling of condenser unit of AC plant capacity 70 TR by washing with chemical agent (HCL) and water through circulation pump including brushing with wire brush and testing complete all as specified and as directed.
M&L for Servicing of Air Handling Units (AHU), air qty of range 3000 CFM to 5800 CFM by removing the filter, vacuumising the filter, washing the filter and reinstalling the cleaned filter, brush the cooling coil and spray the foam coil cleaner including rinsing of coil, alignment of shaft & Motor, servicing of chilled water line strainer for the AHUs, tightening of terminals of motor, replacement of V belts, replacement of bearings complete all as specified and as directed Note: The rate quoted deemed to be inclusive of blowing out the dust, chemical cleaning by spraying the organic based scale removing agent (Vaniklin) at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion valve; greasing of blower motor, checking of electrical connection, cleaning of air filters,greasing of blower motor,replacement of unserviceable bearings, V belts, water drain lines, renewal of rusted sheet metal screws, applying synthetic enamel paint over a coat of primer on the rusted portion and testing & commissioning the unit all as specified and as directed by Engineer-in-Charge
M&L for repairing of hermitically sealed unit compressor having capacity of 17.5 TR , 3-phase, 440V, model SY300A4PBE by disconnecting the suction and discharge refrigerant pipe line, electrical connection, etc., by cutting and remove the upper portion of compressor body by laser cutting method, taking out unserviceable items and replacement with new rotor, stator, one way valve, piston, suction and discharge port, filling of compressor oil, unite the previously cut upper portion of compressor body by suitable welding, connecting the suction and discharge refrigerant pipe line, electrical connection, etc as suitable for working on R-404 A gas including charging the system with refrigerant gas including testing of compressor complete all as specified and as directed. Note : (i) The cost of transportation from Port Blair (AC Installation) to Mainland (Workshop) and back shall be deemed to be included in the quoted rate.
M&L for disconnecting/dismantling (electrically & mechanically) the monoblock pump set having capacity of 20 HP and transporting to workshop , opening the pump motor, cleaning the pump, greasing to bearing/bushes, replace the gland rope, gland nut bolts, opening motor, varnishing to stator winding with class I varnish, heating and baking the same, greasing to motor bearing, cleaning the rotor and re-assembling the same, bringing back at site, fixing it at its original location with proper alignment and testing complete all as specified and directed by Engineer-in-charge.
M&L for leak testing of Air-conditioning Plant /unit having capacity of 70 TR comprising of condenser units and chiller units with pressure testing the complete plant by dry nitrogen gas by separating high side and low side, brazing and low side, rectifying the leakage by gas welding, brazing, pressure testing, vaccumising gas, gas charging the system with existing Refrigerant gas, testing and commissioning complete all as specified and as directed. Note :- (a) Refrigerant gas paid and measured separately. (b)The cost for the nitrogen gas shall be deemed to be included in the quoted rate.
M&L for preparation of old painted steel surfaces of located at various places of air conditioning plant 70 TR and connected structure by means of scrapping and filling cavities, etc., and applying two coats of synthetic enamelled paint by means of spray painting and writing SM/MES number complete all as specified and as directed.
S&F as in repairs Voltas compressor Electronic protection module mounted in terminal box of current range 4 to 61 Amp with Aux supply 0 to 11VAC, 0 to 13 VAC, 5 Sec time, of Model SCR 44TR (MPD)(V4) complete all as specified and as directed.
S&F as in repairs Voltas Motor Protection Unit 1A - 10A, Model M2PD-WOD complete all as specified and as directed.
S&F as in repairs Voltas Motor Protection Unit 4A-61A, Model SCR 44TR complete all as specified and as directed.
S&F as in repair Contactor AC-3, 65A of model 3TS47 complete all as specified and as directed. Make : Siemens/L&T/Havells or equivalent as approved by GE.
S&F as in repair Contactor AC-3 12A of model 3TS31 complete all as specified and as directed Make : Siemens/L&T/Havells or equivalent as approved by GE.
S&F as in repair PC board as per existing make and model suitable for air conditioning plant of capacity 70 TR complete all as specified and as directed.
S&F as in repair Auxilary supply unit of model SPP-PHR complete all as specified and as directed. Make : Voltas
S&F Butterfly valve of size 150 mm bore, both ends flanged and drilled with disc of DI with epoxy coating or CI with nylon coating and duly sealed with neoprene rubber / EPDM, of class 'PN- 1.6, lSI marked including taking down unserviceable butterfly valve complete all as specified and as directed.
All as per item No 15 above here-in-before but butterfly valve of the size 100 mm bore complete all as specified and as directed
All as per item No 15 above here-in-before but butterfly valve of the size 80 mm bore complete all as specified and as directed
S&F Non-return valve of size 150 mm DI with epoxy coating or CI with nylon coating and duly sealed with neoprene rubber / EPDM, of class 'PN- 1.6, lSI marked including taking down unserviceable non return valve complete all as specified and as directed.
All as per item No 18 above here-in-before but Non return valve of size 100 mm bore complete all as specified and as directed
All as per item No 18 above here-in-before but Non return valve of the size 80 mm bore complete all as specified and as directed
S&F as in repair ball valve of size 25mm dia including taking down unserviceable ball valve complete all as specified and as directed.
S&F as in repair Star-Delta starter air break suitable for chilled water pump of capacity 20 HP including taking out old unserviceable starter all as specified and as directed.
S&F MCB TP 80 A with suitable size of copper lugs including taking down unserviceable MCB complete all as specified and as directed.
Supply and replenishing Refrigerant gas R 134/R407C in manufacturer's sealed cylinder complete all as specified and as directed. Note:-(i) Empty cylinder shall be returned to contractor. (ii) Payment shall be made for net weight of gas.
M&L for rewinding of Squirral cage induction fan motor 2.2 KW by taking out burnt copper winding from the motor and winding the motor with insulated copper wire as per existing gauge & turns, varnishing, heating complete complete all as specified and as directed.
S&F as in repair Nylon filters as per existing size suitable for AHU 5800 CFM, model ZDS-560 all as specified and as directed.
S&F as in repair water flow switch suitable for air conditioning plant 70 TR including taking down unserviceable water flow switch complete all as specified and as directed
S&F as in repair stem type thermostat of 6" length into the water inlet and out let connections with MS coupling including taking down unserviceable thermostat complete all as specified and as directed.
S&F as in repair V-belt of size B-73 including taking down unserviceable belt complete all as specified and as directed.
Supply and fixing V-belt of size B-100 including taking down unserviceable belt complete all as specified and as directed.
M&L for Servicing the Air-conditioning Plant /unit 50 TR by checking the functioning of chiller unit/pump, checking the refrigerant, replenishing refrigerant gas if required, Checking of chilled pipeline, condenser pipeline, safety valves, compressor and connected accessories for its proper working and replenishing of compressor oil, checking of Microprocessor control panel and replacement of control panel wiring, lubricating the pumpsets and fan motor including replacement of bearing and tightening of bolts and nuts complete all as specified and as directed. Note : - (i) The cost of compressor oil, PVC Cable for control panel wiring, grease for lubricating and bearing of motors shall be deemed to be included in the quoted rate. (ii) Refrigerant gas will be measured and paid separately. (iii) The quoted rate deemed to be inclusive of repair/replacement of defective safety of pressure rating upto 450 PSI all as per existing, repair/replacement of pitted control wiring/lugs/ferrules complete for ensuring proper functionality of AC plant.
M&L for De-scaling of condensor unit of AC plant capacity 50 TR by washing with chemical agent (HCL) and water through circulation pump including brushing with wire brush and testing complete all as specified and as directed.
M&L for Servicing of Air Handling Units (AHU) Model ZDS-160, Air Qty-15600 CFM by remove the filter, vacuum the filter, wash the filter and reinstall the filter, brush the cooling coil and spray the foam coil cleaner including rinse the coil, alignment of shaft & Motor, servicing of chilled water line strainer for the AHUs, tightening of terminals of motor, replacement of V belts, replacement of bearings and servicing of VFDs for the AHU complete all as specified and as directed Note: The rate quoted deemed to be inclusive of blowing out the dust, chemical cleaning by spraying the organic based scale removing agent (Vaniklin) at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion valve; greasing of blower motor, checking of electrical connection, cleaning of air filters,greasing of blower motor,replacement of un serviceable bearings, V belts, water drain lines, renewal of rusted sheet metal screws, applying synthetic enamel paint over a coat of primer on the rusted portion and testing & commissioning the unit all as specified and as directed by Engineer-in-Charge
M&L for servicing round bottle shaped cooling tower of capacity 100 TR, DM Series, replacement of defective sprinkler assembly & fins complete including descaling of entire plant by chemical agent and water through circulation pump, brushing and replacement of bearing of motor of cooling tower complete all as specified and as directed. Model No DMA 1260 of Make - Advance cooling towers Pvt Ltd
M&L for leak testing of Air-conditioning Plant /unit 50 TR comprising of condenser units and chiller units with pressure testing the complete plant by dry nitrogen gas by separating high side and low side, brazing and low side, rectifying the leakage by gas welding, brazing, pressure testing, vaccumising gas, gas charging the system with existing Refrigerant gas, testing and commissioning complete all as specified and as directed. Note :- (a) Refrigerant gas paid and measured separately. (b)The cost for the nitrogen gas shall be deemed to be included in the quoted rate.
M&L for disconnecting/dismantling (electrically & mechanically) the 7.5 HP capacity monoblock pump and transporting to workshop , opening the pump motor, cleaning the pump, greasing to bearing/bushes, replace the gland rope, gland nut bolts, opening motor, varnishing to stator winding with class I varnish, heating baking the same, greasing to motor bearing, cleaning the rotor and re assembling the same, brought back at site, fixing it at its original location with proper alignment and testing complete all as specified and directed.
M&L for disconnecting/dismantling (electrically & mechanically) the 3 HP capacity monoblock pump and transporting to workshop , opening the pump motor, cleaning the pump, greasing to bearing/bushes, replace the gland rope, gland nut bolts, opening motor, varnishing to stator winding with class I varnish, heating baking the same, greasing to motor bearing, cleaning the rotor and re assembling the same, brought back at site, fixing it at its original location with proper alignment and testing complete all as specified and directed.
M&L for repairing of hermitically sealed unit compressor 12.5 TR capacity, 3 phase, 440Volts, model SZ185S4RC by disconnecting the suction and discharge refrigerant pipe line, electrical connection, etc., cutting and remove the upper portion of compressor body by lazer method, taking out unserviceable items and replacement with new rotor, stator, one way valve, piston, suction and discharge port, filling of compressor oil, unite the upper portion fo compressor body by suitable welding, connecting the suction and discharge refrigerant pipe line, electrical connection, etc as suitable for working on R 404 A gas including charging the system with refrigerant gas including testing of compressor complete all as specified and as directed. Note : (i) The cost of transportation from Port Blair (AC Installation) to Mainland (Workshop) and back shall be deemed to be included in the quoted rate.
M&L for preparation of old painted steel surfaces of located at various places of air conditioning plant 50 TR and connected structure by means of scrapping and filling cavities, etc., and applying two coats of synthetic enamelled paint by means of spray painting and writing SM/MES number complete all as specified and as directed.
S&F as in repair Auto thermostat, range -300C to +150C, model KP61 including taking down unserviceable thermostat complete all as specified and as directed.
S&F as in repair Temperature gauge, range -100C to +500C, including taking down unserviceable temp gauge complete all as specified and as directed.
S&F as in repair Water flow controller switch, model HFS-25 including taking down unserviceable water flow controller switch complete all as specified and as directed.
S&F as in repair Thermostatic expansion valve, model TGEX 11TR, including taking down unserviceable valve complete all as specified and as directed.
S&F as in repair Nylon filters as per existing size 2m x 1.5m of AHU 15600 CFM, model ZDS-160 complete all as specified and as directed.
Supply and replenishing Refrigerant gas R-404 A in manufacturer's sealed cylinder complete all as specified and as directed. (i) Empty cylinder shall be returned to contractor. (ii) Payment shall be made for net weight of gas.
S&F as in repair V belt of size C-112 including taking down unserviceable belt complete all as specified and as directed.
S&F as in repair timer 800 SD including taking down unserviceable timer complete all as specified and as directed.
S&F as in repair PCB controller kit (micro processor based control panel) complete suitable for AC plant capacity 50 TR including taking down unserviceable PCB kit complete all as specified and as directed.
M&L in replacement of Solenoid pilot control valve coil assembly, 11 watt, 230 volt AC, type 6, size 2 including taking down unserviceable valve complete all as specified and as directed
M&L in replacement of HP/LP cut off switch MP - 15 with flare nut including taking down unserviceable cut off switch complete all as specified and as directed
M&L in replacement of water pressure cut out, IP 70 including taking down unserviceable cut out complete all as specified and as directed
M&L in replacement of oil pressure cut off switch, MP - 55 including taking down unserviceable cut off switch complete all as specified and as directed
S&F as in repair contactor 25 A, model NC1-4011, 220/415V including taking down unserviceable contactor complete all as specified and as directed.
S&F as in repair Micro computer control panel blue star suitable for AC plant capacity 50 TR including taking down unserviceable panel complete all as specified and as directed.
S&F MCB TP 50 A with suitable size of copper lugs including taking down unserviceable MCB complete all as specified and as directed.
S&F as in repair MCB TP 6A - 32A, 10 KA breaking capacity including taking out old unserviceable MCB complete all as specified and as directed.
S&F as in repair valve cum actuator of model VXF47.80 suitable for AC plant capacity 50 TR including taking down unserviceable valve complete all as specified and as directed.
S&F as in repair display unit suitable for VXF47.80 auto 3 way valve controller including taking down unserviceable display unit complete all as specified and as directed.
S&F as in repair Fuse size A4, 125 A, 80 KA including taking down unserviceable fuse complete all as specified and as directed.
Supply and fix in repair MCCB 4 Pole 400 Amp thermal magnetic type 50 KA breaking capacity with suitable size of lugs including taking out old unserviceable MCCB complete all as specified and as directed.
Supply and fix in repair MCCB 4 Pole 160 Amp thermal magnetic type 25 KA breaking capacity with suitable size of lugs including taking out old unserviceable MCCB complete all as specified and as directed.
Supply and fix in repair MCCB 4 Pole 125 Amp thermal magnetic type 25 KA breaking capacity with suitable size of lugs including taking out old unserviceable MCCB complete all as specified and as directed.
Supply and fix in repair MCCB 4 Pole 100 Amp thermal magnetic type 16 KA breaking capacity with suitable size of lugs including taking out old unserviceable MCCB complete all as specified and as directed.
S&F as in repair Liquid line filter drier with 1/4 inch flare including taking out old unserviceable filter drier complete all as specified and as directed.
S&F as in repair Star-Delta starter air break suitable for chilled water pump of capacity 7.5 HP including taking out old unserviceable starter all as specified and as directed.
S&F as in repair Pressure gauge Dial type 0 to 100 Kg/Cm2 including taking out old unserviceable pressure gauge complete all as specified and as directed.
S&F as in repair Butterfly valve of size 150 mm bore, both ends flanged and drilled with disc of DI of class PN- l.6, lSI marked including taking down unserviceable butterfly valve complete all as specified and as directed.
S&F Butterfly valve of size 65 mm bore, both ends flanged and drilled with disc of DI with epoxy coating or CI with nylon coating and duly sealed with neoprene rubber / EPDM, of class 'PN- l.6, lSI marked including taking down unserviceable butterfly valve complete all as specified and as directed.
S&F as in repair Non-return valve of size 150 mm bore, both ends flanged and drilled with disc of DI of class PN- l.6, lSI marked including taking down unserviceable non return valve complete all as specified and as directed.
S&F as in repair Non-return valve of size 65 mm bore, both ends flanged and drilled with disc of DI with epoxy coating or CI with nylon coating and duly sealed with neoprene rubber / EPDM, of class 'PN- l.6, lSI marked including taking down unserviceable non return valve complete all as specified and as directed.
Note for Item No 1 to 70: The MCCBs shall be thermal adjustable type with ICs=100%ICu and all the spares of AC plant considered shall be as per OEM approved suitable all as per existing. It is responsibility of contractor to engage required manpower as per requirement and take necessary measures to run the plant in event of breakdown to the satisfaction of user and as directed by Eng- in-charge .Considering the sensitive nature of installation the contractor shall always be in a position to make alternate standby arrangement in case of break down. Contractor shall keep his spares ready in advance for carrying out repairs without any delay. Any breakdown/complaint shall be attended within 2 Hrs and defects shall be rectified within 24 Hrs of time otherwise a recovery of Rs 5000/Hr due to non-functional of AC plant shall be attributed to Contractor without any further claim. The cost for same is deemed to be included in scope of item. The repairs to be carried out by experienced/authorized service engineer/mechanic and the credentials for the same to be submitted for approval of GE before commencement of work.
Tropical Refrigeration
PSS ELECTRICAL WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .