| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC 00 KIWADI SAFEDABAD BARABANKI BARABANKI UTTAR PRADESH 225001 | BARABANKI | UTTAR PRADESH | 225001 | L1 | Accepted-AOC As per TC recommendation and approval. | |
| 2 | L2₹1.1 L+₹11,290 (11.4%)Rejected-Finance CINAMA ROAD ANPARA P O ANPARA SONEBHADRA 231220 UTTAR PRADESH INDIA | SONBHADRA | UTTAR PRADESH | 231220 | L2 | Rejected-Finance As per NIT | |
| 3 | L3₹1.1 L+₹14,828 (15.0%)Rejected-Finance HOUSE NO 3 KAKRI SONEBHADRA UTTAR PRADESH INDIA 231224 | SONBHADRA | UTTAR PRADESH | 231224 | L3 | Rejected-Finance As per NIT |
Tender Value
₹1.3 L
EMD Value
₹1,700
Closing Date
22 Mar 2024, 10:00 amClosed
M K Pandey, SO(Excavation)
O/o Staff officer (Excavation), Bina Project, NCL, District Sonebhadra (UP), Pincode 231220.
Repairing, welding, grinding and reconditioning of worn-out 2 nos. propel 2 nd intermediate pinion shaft of propel gear box assembly, 2 nos. swing 1st pinion shaft, 2 nos. gear wheel of swing 1st pinion shaft and 2 nos. gear wheel of swing 2 nd pini
2024_NCL_304693_1
Bina/SO(Excv)/Tender/23-24/111 dt 11.03.2024
Open Tender
Excavation Department Work
Item Rate
26 days
Bina Project, NCL
As per NIT
5 documents required · 5 mandatory
₹1,700
18 May 2024
11 Mar 2024
23 Mar 2024
12 Mar 2024
22 Mar 2024
12 Mar 2024
12 Mar 2024 - 19 Mar 2024
Amount
Labour charges including contractors profit (consists of 1 no. Skilled welder for 8 shift-days i.e. 2 Shift X 4 days, 1 no. Grinderman for 6 shift-days i.e. 2 Shift X 3 days and 1 no. Unskilled for a period of 8 shift-days i.e. 2 shift X 4 days) for repairing / reconditioning of 02 nos. 2nd intermediate pinion shaft (Z#11 Teeth) of propel gear box assly
Labour charges including contractors profit (consists of 1 no. Skilled welder for 8 shift-days i.e. 2 Shift X 4 days, 1 no. Grinderman for 6 shift-days i.e. 2 Shift X 3 days and 1 no. Unskilled for a period of 8 shift-days i.e. 2 shift X 4 days) for repairing / reconditioning of , 2 nos. swing 1st pnion shaft (Z# 12 teeth)
Labour charges including contractors profit (consists of 1 no. Skilled welder for 20 shift-days i.e. 2 Shift X 10 days, 1 no. Grinderman for 16 shift-days i.e. 2 Shift X 8 days and 1 no. Unskilled for a period of 20 shift-days i.e. 2 shift X 10 days) for repairing / reconditioning of and 2 nos. gear wheel of swing 1st pinion shaft ( Z# 56 teth)
Labour charges including contractors profit (consists of 1 no. Skilled welder for 16 shift-days i.e. 2 Shift X 8 days, 1 no. Grinderman for 12 shift-days i.e. 2 Shift X 6 days and 1 no. Unskilled for a period of 16 shift-days i.e. 2 shift X 8 days) for repairing / reconditioning of and 2 nos. gear wheel of swing 2nd pnion shaft ( Z# 47 teeth)
Hiring charges for 1 no. welding machine along with accessories, 1 set of welding accessories and 1 no. grinding machine with stone for a period of 20 days.
Total impact of GST for the purpose of CTC
MANISH ENTERPRISES
M/s RAJENDRA ENGINEERING WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_315680.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .