Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹15.1 L+₹48,430 (3.32%)Rejected-Finance | L2 | Rejected-Finance Rates are high | |
| 3 | L3₹15.6 L+₹98,864 (6.77%)Rejected-Finance | L3 | Rejected-Finance Rates are high | |
| 4 | L4₹16.1 L+₹1.5 L (10.4%)Rejected-Finance | L4 | Rejected-Finance Rates are high |
Tender Value
₹13.4 L
EMD Value
₹26,800
Closing Date
8 Jan 2020, 12:00 pmClosed
GE MIS MHOW
GE MAINT INF SCHOOL, 75 MALL ROAD MHOW
MANNING AND OPERATION OF 33 11 KV SWITCH YARD AT TOP II MAIN RECEIVING STATION UNDER GE MAINT INF SCHOOL MHOW
2019_MES_306273_1
GE MIS MHOW/47 OF 2019-20
Open Tender
Miscellaneous Works
Item Rate
334 days
GE MIS MHOW
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE MIS MHOW
₹26,800
Yes
12 Jun 2020
13 Dec 2019
9 Jan 2020
20 Dec 2019
8 Jan 2020
27 Dec 2019
Amount
Manning and operation of 33/11 KV Sub Station including all switch gears installed at TOP II, Karbala Power House, Mhow round the clock in three shifts (each of eight hours) from 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs & 2200 hrs to 0600 hrs" including maintenance of Daily Log Sheets of all 33 and 11 KV feeders :-
The details of assets are as under:- (a) Power Transformer 33/11 KV, 1200 KVA - 01 No (b) Power Transformer 33/11 KV, 1250 KVA - 01 No (c) Power Transformer 33/11 KV, 3150 KVA - 01 No (d) APFC Transformer 33/0.433 KV, 750 KVA - 01 No (e) Stn Transformer 33/0.433 KV, 50 KVA - 01 No (f) Distr Transformer 11/0.433 KV, 250 KVA - 01 No (g) Distr Transformer 11/0.433 KV, 500 KVA - 01 No (g) 33 KV Grid 8 pole structure along with VCB, AB Switch, CT, PT, control panels and other accessories complete - 03 Sets (h) 33 KV 4 pole structure along with VCB, AB swiches, MPSEB metering unit with complete accessories - 01 Set (j) 11 KV incoming VCB Panel with complete accessories - 03 sets (k) 11 KV out going VCB Panel with complete accessories - 08 Nos (l) LT Distr Panel with complete accessories - 03 Sets (m) LT APFC Panel with complete accessories - 01 Sets (n) 11 KV AB Switches mounted on Two or Four Pole Structure with connected accessories - 08 Sets (o) Battery bank consisting of 4 x 12V, 190 AH batteries and accessories - 01 set
Manning and operation of 33/11 KV Sub Station including all switch gears installed at TOP II, Karbala Power House, Mhow round the clock in three shifts 3 helpers (each of eight hours) from 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs & 2200 hrs to 0600 hrs" and asist the Item No 1 above including maintenance of TOP -II, and all as directed by Engr-in-Charge.
Manning and operation of DG Sets of capacity 1 x 82.5 KVA, round the clock by deploying one FGM in one shift of eight hrs from 0800 hrs to 1600 hrs at Inf Musuem including maintaining batteires, log sheets etc, complete all as specified.
Notes :- 1. The operator must be a skilled FGM/Elect subject to ITI qualified in appropriate trade or four years of experience in concerned operation field and fully conversant to maintenance and operation /handling of DG sets and electrical switchgears. 2. The operator must adhere with the dress code as directed. 3. The operator has to attend the telephone and maintain the record. 4. The operator must be smart in conversation and well behaved.
5. The contractor is responsible to the following :- (a) Maintenance of Batteries and battery charger (The cost of distled water and electrolite and other materials required for maintanance of batteries is deemed to be included in the quoted rate) (b) Collection of FOL (Fuel, oil and lubricants) from AGE E/M No 1 FOL Store for maintenance and operation of DG Set. (Transport will be provided by the deptt) (c) Cleaning and upkeep of DG set and TOP-II Sub Station installation and surrounding area if not found satisfactorily penal recovery of Rs 500/- per day will be charged.
Notes :- For all Items of BOQ ; If the quoted amount is less than the estimated cost of the work i.e. 13.40 Lakhs, then the lowest bidder will have to deposit FDR/BGB in favour of Accepting Officer within 07 days of opening of finacial bid for the difference in estimated cost i.e. 13.40 Lakhs & quoted amount. In case the said FDR/BGB is not submitted within stipulated period mentioned above, the contractor shall be banned for 06 months & his bid will be rejected. The said Amt deposited by the lowest bidder will be released after completion of work.
Sameer Auto Engineers
Vinayak Trading House
HRK ENGINEERING CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .