| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.6 LAccepted-Finance VILLAGE ULDEYPUR MEERUT | L1 | Accepted-Finance Ok | |
| 2 | L1₹79.6 LRejected-Finance | L1 | Rejected-Finance Ok | |
| 3 | L1₹79.6 LRejected-Finance | L1 | Rejected-Finance Ok | |
| 4 | L2₹93.2 L+₹13.6 L (17.0%)Rejected-Finance GRAM HAZRATPUR PO SAHKARI NAGAR DISTRICT BULANDSHAHR | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | L2 | Rejected-Finance Ok | |
| 5 | L3₹93.6 L+₹14.0 L (17.5%)Rejected-Finance | L3 | Rejected-Finance Ok |
Tender Value
₹94.6 L
EMD Value
₹6.7 L
Closing Date
9 Oct 2026, 12:00 pmClosed
SE, BSR CIRCLE, PWD, BULANDSHAHR
SE, BSR CIRCLE, PWD, BULANDSHAHR
Reconstruction work of RCC Box Culvert 6x3 in palace of Damage and narrow bridge located at Km 1 of Baral Link Road in District Bulandshahar
2026_CEMRT_1192267_1
9234 /96M/E-TENDER/BSR CIRCLE/2026-27 Dated 16.09.2026
Open Tender
Civil Works - Bridges
Percentage
180 days
SE, BSR CIRCLE, PWD
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹6.7 L
SE, BSR CIRCLE, PWD, BULANDSHAHR
12 Oct 2026
3 Oct 2026
9 Oct 2026
3 Oct 2026
9 Oct 2026
3 Oct 2026
4 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical SpecificationSr No. 2.5 Ref No.202 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 95 | Cum | 450 | ₹42,750 |
| - | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 712 | Cum | 42 | ₹29,904 |
| - | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 | 104 | Cum | 8,100 | ₹8,42,400 |
| - | Providing concrete for Plain cement concrete (M-10) in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 11.4 Ref No.800 & 1200 in leveling coarse including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 64 | Cum | 7,650 | ₹4,89,600 |
| - | Providing concrete for Reinforced cement concrete (M-25) in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 11.4 Ref No.800 & 1200 including necessary centering and shuttering etc.complete including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 129 | Cum | 8,600 | ₹11,09,400 |
| - | Providing concrete for Reinforced cement concrete (M-25) in Sub structure complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 12.5 Ref No.800 including necessary centering and shuttering etc.complete including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 114 | Cum | 9,100 | ₹10,37,400 |
| - | Supplying, Fitting and Placing TMT bar Reinforcement (Fe 415) in substructure complete as per Drawing and Technical Specifications. Clauses 1002,1005,1010 & 1202 Sr No. 12.7 including supply of and all material, labour, T&P all taxes, labour cessetc. as per direction by the Engineer In-charge Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 23 | MT | 80,000 | ₹18,40,000 |
| - | Providing concrete for Reinforced cement concrete (M-25) in Super structure complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 13.1 Ref No.800 including necessary centering and shuttering etc.complete including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 115 | Cum | 9,850 | ₹11,32,750 |
| - | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 Sr. No. 13.2 Ref. No. 1000 including supply of and all material, labour, T&P all taxes, labour cessetc. as per direction by the Engineer In-charge Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 12 | MT | 81,500 | ₹9,78,000 |
| - | Providing & Fixing of Weep Hole in abutment wall & retaining wall completed as per drawing & specification.including supply of all material, labour, T&P all taxes, labour cess etc. required for proper completion of work as per direction by the Engineer In-charge . Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 58 | Nos | 435 | ₹25,230 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tendernotice_2.pdf
PDF • 1.71 MB
BOQ_2250162.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .