Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.1 LAccepted-Finance FLAT NO G 406 HANSA COURTYARD THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | TAMIL NADU | 600019 | ₹87.1 L | L1 | Accepted-Finance Lower rate |
| 2 | L2₹92.0 LAccepted-Finance NO 68 D BLOCK 2ND FLOOR S 1 FRONTIER HOMES ALIPH MAJITH NAGAR KELAMBAKKAM CHENGALPATTU DIST CHENNAI 603 103 | CHENGALPATTU | TAMIL NADU | 603103 | ₹92.0 L | L2 | Accepted-Finance Higher rate |
| Sl No | Description | Qty | Unit | Renga Engineering Works India Pvt Ltd L2 | Gold Engineering Works L1 |
|---|---|---|---|---|---|
| 1.00 | I. Material Portion:ISA 100 x 100 x 10 | 4.08 | MT | 75,000 ₹3,61,080 | 71,000 ₹3,41,822.4 Lowest |
| 2.00 | ISA 50 x 50 x 6 | 0.06 | MT | 70,000 ₹4,956 | 66,500 ₹4,708.2 Lowest |
| 3.00 | ISA 75 x 75 x 8 | 3.63 | MT | 72,500 ₹3,10,546.5 | 68,500 ₹2,93,412.9 Lowest |
| 4.00 | MS plate 12 mm thick | 10.5 | MT | 94,000 ₹11,64,660 | 90,000 ₹11,15,100 Lowest |
| 5.00 | ISMC 250 x 80 | 1.87 | MT | 75,000 ₹1,65,495 | 72,000 ₹1,58,875.2 Lowest |
| 6.00 | ISMC 200 x 75 | 0.89 | MT | 73,000 ₹76,664.6 | 70,000 ₹73,514 Lowest |
| 7.00 | ISMC 150 x 75 | 0.3 | MT | 72,500 ₹25,665 | 69,000 ₹24,426 Lowest |
| 8.00 | ISA 90 x 90x10 | 0.54 | MT | 74,000 ₹47,152.8 | 71,000 ₹45,241.2 Lowest |
| 9.00 | ISMB 200 x 100 | 0.26 | MT | 77,000 ₹23,623.6 | 73,000 ₹22,396.4 Lowest |
| 10.00 | ISMB 250 x 125 | 0.58 | MT | 77,000 ₹52,698.8 | 73,000 ₹49,961.2 Lowest |
Tender Value
Refer Docs
EMD Value
₹71,800
Closing Date
19 Jan 2026, 2:00 pmClosed
CE/NCTPS-I
CE/NCTPS-I
NCTPS I SE M II Circle ECHS Dn Strengthening of existing severely damaged corroded boom conveyor structures MCC room and operator cabin in Stacker 1B
2026_EB_638737_1
CE/NCTPSI/SE/MII/SpNo129/25-26
Open Tender
Power/Energy Projects/Products
Works
30 days
NCTPS Chennai
Refer the tender documents
3 documents required · 3 mandatory
₹0
₹71,800
Yes
26 Mar 2026
3 Jan 2026
20 Jan 2026
3 Jan 2026
19 Jan 2026
3 Jan 2026
I. Material Portion:ISA 100 x 100 x 10
ISA 50 x 50 x 6
ISA 75 x 75 x 8
MS plate 12 mm thick
ISMC 250 x 80
ISMC 200 x 75
ISMC 150 x 75
ISA 90 x 90x10
ISMB 200 x 100
ISMB 250 x 125
ISMB 300 x 140
ISMB 350 x 140
GI grating
II. Labour Portion: Dismantling of existing severely corroded/ damaged triper conveyor column and bracing for boom conveyor structures & operation cabin in Stacker -1B which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges and consumables etc.
Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including all hire charges.
Fabrication of boom conveyor structures & operation cabin in Stacker -1B by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges.
Erection of boom conveyor structures & operator cabin in Stacker -1B by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane, winch hire charges, consumables and T&P hire charges.
Erection of GI Gratings in newly erected steel support structure for Recliamer-1B working platform by marking, cutting welding, including transportation, painting of red Oxide paint, cost of consumables & T&Ps hire charges.
Cleaning the surface with shot blasting the boom conveyor structures & operator cabin in Reclaimer 1B including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges.
Painting charges for three coats of epoxy paints ( One coat of primer and two coat of epoxy paint) including epoxy thinner, consumables and T&P hire charges.
Cost of paint for one coat of Zinc phosphate epoxy primer (60-70 microns DFT) in the boom conveyor structures & operation cabin in stacker 1 B.
Cost of paint for one coat of MIO epoxy (100-120 microns DFT) in the structures boom conveyor structures & operation cabin in stacker 1 B.
Cost of paint for one coat of aromatic polyurethane epoxy (30-35 microns DFT) with total DFT of 190 to 225 microns in the structures of boom conveyor structures & operator cabin in Stacker 1 B.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_764443.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].