₹35,880
Closing Date
11 Mar 2024, 3:00 pmClosed
Block Development officer, (v.pt)Kottur
Block Development office, Kottur
1. Desilting of Lakshminarayanapuram Uppu kulam,Construction Of Inlet in Mavattagudi Panchayat. 2. Construction of Samathava Suduadu Cremation Shed,
2024_RDTN_440245_1
RC.No.466/2024/aa1/04/03/2024 AGAMT-II 2024-2025 Mavattagudi P4
Open Tender
Civil Works - Water Works
Item Rate
180 days
Kottur Block
As per Tender Document
3 documents required · 3 mandatory
₹0
₹35,880
Yes
12 Mar 2024
5 Mar 2024
11 Mar 2024
5 Mar 2024
11 Mar 2024
5 Mar 2024
Amount
1. Desilting of Lakshminarayanapuram Uppu kulam,Construction Of Inlet in Mavattagudi Panchayat.
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
SUB EstimateConstruction Of Inlet & Outlet
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Providing Layaing RCC Pipe NP2 For Culvert including cost, conveyance for all materials & labour charges etc complete
Refilling Earth Filling between wall including cost, conveyance for all materials & labour charges etc complete
Provision for Name Borad
2. Construction of Samathava Suduadu Cremation Shed, Retaining wall and Approch Road @ Lakshminarayanapuram in Mavattagudi Panchayat
Providing 250mm dia RCC pile hole using hand bore drill and RCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete
Earthwork excavation in hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Sand Filling with good river sand including cost and conveyance of all materials and all labour charges etc.,complete
Cement concrete 1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
RCC 1:11/2:3 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete For Tiebeam
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials and all labour charges etc.,complete
Cement concrete 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete
Cost and supply and fabrication steel including cost and conveyance of all materials to site and all labour charges etc.,complete
Plastering in CM 1:3 mix using 10mm thick including cost and conveyance of all materials and all labour charges etc.,complete
Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials and all labour charges etc.,complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
SUB Estimate Construction Retaining Wall
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
SUB Estimate Approch BT Road
Picking the existing BT/WBM Surface including cost and conveyance of all materials and all labour charges
Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metre per 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.S.T.specification.
Providing and laying tack coat over unprimed WBM surface using 4kg of bitumen binder for 10sqm area including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat bitumen aprayer etc.,complete as per clause 503 of MOST specification.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Collection and supply of gravel from approved quarry including cost and conveyance of all materials and all labour charges to stacking to department gauge for pre measurement etc.,complete for berms
Provision for Name Borad
3. Construction of CC road @ Vishalachpuram Nadu Theru Salai inMavattagudi Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
4.Providing of CC road @ Vishalachipuram Mela Theru Salai in Mavattagudi Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
VIJAYENDRAN M
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .