Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance 432 VILLAGE SHEKHPUR SHIKR PUR GHASERA 123401 | GHASERA | REWARI | HARYANA | 123401 | -3.99% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 L+₹29,475.60 (6.34%)Admitted-Finance | +2.10% | ₹4.9 L+₹29,475.60 (6.34%) | L2 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,680
Closing Date
15 Aug 2026, 5:00 pmClosed
Amit Rathi
DIV Rewari
Annual Maintenance Estimate of Master Water Supply Scheme in U/E Narnaul .
2026_HBC_539474_1
2026D4961C1D 06EB 4A0E 8590 3D48C6279ED8258HSV
Open Tender
Civil Works
Works
15 days
Narnaul
2 documents required · 2 mandatory
₹295
₹9,680
Yes
17 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
15 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | N.S.Item Running, Operation of RAW Water Pump, filtration unit, and Clear Water (Physical, chemical and bacteriological tests) and clear water pump house at Water Treatment Plant Kalaka, HSVP Rewari. Running, Operation of Raw water pump sludge sump well of back wash motors consist of running of all the machinery and generators consist of various jobs i.e. loading and unloading of Alum. Preparation of qty. of Alum solution and dosing the Qty. of alum with the requirement of water as per direction of Lab in charge/ representative of EIC. The contractor will have to employ the skilled operating staff for smooth running of machinery. Running, operation of filtration unit also includes the running flocculates, flash mixer, compressor for back wash, running operation and mtc. of motor for lifting the water for back wash operating and maintaining the sluice valve for removal of sludge and back was which the filtrations per required for smooth running of filtration unit. The contractor will have to employee the operator and labour for smooth functioning of filtration unit as per general condition of contract. The employee of the contractor will be bound to on/off of the machinery as per massage given by the representative of EIC from various boosting station. The contractor will maintain the record/ log book of working machinery, generator, consumption of Alum etc. as per requirement and direction of EIC The complete work for running and operation of Raw Water Pump at water treatment plant Kalaka, Rewari will have to do by the contractor with entire satisfaction of EIC and number of workman should be strictly as per analysis attached. | - | per month | 4,84,000 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_618732.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .