Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-CDR NOT UPLOADED |
Tender Value
₹15.0 L
EMD Value
₹74,995
Closing Date
11 Mar 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
CONSTRUCTION BY WAY OF SYNTHETIC VOLLEYBALL COURT WITH TILING AND FENCING AT BHSS BUDGAM
2026_RDPR_305234_1
NIT_140_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
BUDGAM
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹74,995
12 Mar 2026
4 Mar 2026
12 Mar 2026
4 Mar 2026
11 Mar 2026
4 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
NAME OF WORK : CONSTRUCTION BY WAY OF SYNTHETIC VOLLEYBALL COURT WITH TILING AND FENCING AT BHSS BUDGAM
Contract No & Dated: AS PER ENIT (AA ORDER 68-DYSS OF 2025; 25/08/2025) Adv cost =15.00 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0_) Providing and laying charges for laying of stone solling duly hand packed in trenches BI01010001010000000000000515BI0100001126 CUM Excess(+) Full Conversion INR
0_) P/L in position cement concrete of M 7.5 Grade including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :4 F.A.(Natural/M-Sand) :8 C.A. ) with 40mm aggregate BI01010001010000000000000515BI0100001127 CUM _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and laying 60 mm thick factory made cement concreteinterlocking paver block of M-30 grade made by block making machinewith strong vibratory compaction and of approved size and design/shapelaid in required colour and pattern over and including 50mm thickcompacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge BI01010001010000000000000515BI0100001128 SQM _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing Cement concrete flooring/coping 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. BI01010001010000000000000515BI0100001129 SQM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) P/F of artificial FIFA APPROVED UV resistant polyethylene synthetic grass with rigid monofilment yarn, 40mm pile height and 1250g/sqm pile weight with total carpet weight not less than 2500g/sqm and infiill in the ratio of 2:1 with sand(size of sand 0.2mm-1.0mm) 15mm (minimum)height and Rubber 8mm(minimum)height infill weight not less than 2.25kg/sft .The stitch rate per meter should be minimum of 285 All line marking shall be white, unless in the drawings. line marking shall be sitched 'tufted' material (painted lines are not acceptable) the carpet should be laid as per the manufacturers manual incl. All applicable taxes, Lavies, Octoria, transportation loading/unloading complete. BI01010001010000000000000515BI0100001130 SQM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carraige by M.T. of Coarse Aggregate from Source to Site. BI01010001010000000000000515BI0100001138 CUM _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carraige by M.T. of Fine Aggregate from Source to Site. BI01010001010000000000000515BI0100001139 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carraige by M.T. of Stone Soling/Plum BI01010001010000000000000515BI0100001140 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Add provision for signboard, photographs and other unforeseen items BI01010001010000000000000515BI0100001141 JOB Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_991343.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .