Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.6 LAccepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 1 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
5 May 2022, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit I Boiler Statutory Inspection 2022 23 Flue Gas duct A side Patch up works and other repair works between APH outlet to ESP inlet
2022_EB_229721_1
SE / M-I / MTPS-I / BM / OT. 60 /2022-23
Open Tender
Power/Energy Projects/Products
Works
10 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,500
Yes
10 May 2022
21 Apr 2022
6 May 2022
21 Apr 2022
5 May 2022
21 Apr 2022
Amount
Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate and transporting of scrap to Central Stores/M.T.P.S-I.
Labour charges for welding eroded initial welding joints in the flue gas duct below 2 metre.
Labour charges for welding eroded initial welding joints in the flue gas duct above 2 metre .
Charges for transporting of 6mm M.S/Chequered plates from Central Stores/MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions below 1.5 m of the flue gas duct and welding the same.
Charges for transporting of 6mm M.S./ Chequered plates from Central Stores/ MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions above 1.5 meters side wall portions of the flue gas ducts and welding the same.
Charges for transporting of 6mm M.S./ Chequered plates from Central Stores /MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the flue gas ducts and welding the same.
Charges for removal of wear resistance plate for patch up the eroded intricate portion and re fixing the same after completing the patch up.
Cutting gas
Welding Rod
Consumables and T & Ps for item S.No.1 to 7
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .