Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC 309 THIRUVA GOUNDANUR BYE PASS SALEM 636 005 | SALEM | SALEM | TAMIL NADU | 636005 | ₹9.6 L Quoted ₹8.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.2 LRejected-AOC NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | THIRUVALLUR | TAMIL NADU | 600019 | ₹8.2 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹9.2 LRejected-AOC | ₹9.2 L | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | LAKSHMI ENTERPRISES L1 | KR CONTRACTOR L2 | ATHMIKA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for cutting and removing of existing rusted platforms and dismantling of damaged steel structural materials from APH A and B pass 9 Mtr floor elevation and devoluting scarp to stores. Including consumables and T&P's. | 7 | Ton | 10,300 ₹72,100 | 10,389 ₹72,723 | 10,800 ₹75,600 |
| 2.00 | Charges for Leading, lifting and transporting of Iron and steel materials from stores to site. Including consumables and T&P's. | 12 | Ton | 3,200 ₹38,400 | 3,206 ₹38,472 | 3,700 ₹44,400 |
| 3.00 | Charges for fabrication and erection of Damaged / eroded platform and supporting structures in APH A and B pass 18 Mtr floor elevation. Including consumables and T&P's. (Required structural material will be supplied by TNPGCL) | 11.4 | Ton | 51,200 ₹5,83,680 | 51,246 ₹5,84,204.4 | 58,500 ₹6,66,900 |
| 4.00 | Charges for dismantling the eroded/wornout floor Grills cutting, dismantling, leading, lifting to ground floor. Including consumables and T&P's. | 80 | m2 | 700 ₹56,000 | 765 ₹61,200 | 770 ₹61,600 |
| 5.00 | Charges for refixing of the new/same released Floor Grills leading, lifting of grills and erecting at 9 m elevation. Including consumables and T&P's. | 80 | m2 | 700 ₹56,000 | 765 ₹61,200 | 770 ₹61,600 |
| 6.00 | Charges for cleaning then painting of one coat of red oxide primer and two coat of PU based enamel paint in steel structures. Including cost of paint, consumables and T&P's. | 60 | m2 | 102 ₹6,120 | 102 ₹6,120 | 105 ₹6,300 |
Tender Value
Refer Docs
EMD Value
₹11,100
Closing Date
16 Apr 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle R and M 24 25 BM Dn Unit III Rectification of damaged eroded fabricated channel in Structures carrying platform in 9 Mtr elevation between A and B Pass and painting
2025_EB_537725_1
CE SE MI NCTPS I 6 25 26
Open Tender
Power/Energy Projects/Products
30 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,100
Yes
12 Jan 2026
3 Apr 2025
17 Apr 2025
3 Apr 2025
16 Apr 2025
3 Apr 2025
Amount
Charges for cutting and removing of existing rusted platforms and dismantling of damaged steel structural materials from APH A and B pass 9 Mtr floor elevation and devoluting scarp to stores. Including consumables and T&P's.
Charges for Leading, lifting and transporting of Iron and steel materials from stores to site. Including consumables and T&P's.
Charges for fabrication and erection of Damaged / eroded platform and supporting structures in APH A and B pass 18 Mtr floor elevation. Including consumables and T&P's. (Required structural material will be supplied by TNPGCL)
Charges for dismantling the eroded/wornout floor Grills cutting, dismantling, leading, lifting to ground floor. Including consumables and T&P's.
Charges for refixing of the new/same released Floor Grills leading, lifting of grills and erecting at 9 m elevation. Including consumables and T&P's.
Charges for cleaning then painting of one coat of red oxide primer and two coat of PU based enamel paint in steel structures. Including cost of paint, consumables and T&P's.
KR CONTRACTOR (BID ID -1293991)
ATHMIKA ENTERPRISES (BID ID -1296186)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid