| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC 167 3 RAY BAHADUR ROAD KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | ₹5.0 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹5.1 LRejected-Finance 108 1A REGENT COLONY N S C BOSE ROAD KOLKATA 700040 | KOLKATA | WEST BENGAL | 700040 | ₹5.1 L | L2 | Rejected-Finance FINANCIAL BID IS OPENED |
| 3 | L3₹5.2 LRejected-Finance 215 201 P B ROAD KOLKATA 700041 | KOLKATA | WEST BENGAL | 700041 | ₹5.2 L | L3 | Rejected-Finance FINANCIAL BID IS OPENED |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
26 Feb 2026, 2:00 pmClosed
EX ENGINEER
11, BELVEDERE ROAD KOL -27
CONSTRUCTION OF COMMUNITY SHED AT 103, ALIPORE ROAD, KOLKATA-700027 IN WARD-82 UNDER KOLKATA MUNICIPAL CORPORATION
2026_KMC_1012069_1
KMC/ IX/082/215/2025-2026/D
Open Tender
CIVIL WORKS
45 days
BOROUGH-IX
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
25 Mar 2026
20 Feb 2026
28 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
BUILDING WORKS(O) FENCING.(A)ORIGINAL WORKS?.(11)Supplying, fitting, fixing, Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised "C" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. (The rate is exclusive of the cost of posts)(V) 100 mm. x 100 mm. x 6 g.
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m (3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . A. ROOFING & SHEETWALLING 14. Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work). (i) In Roof:- a) With 0.5 mm thick sheet
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(17)18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick (avg) cement mortar (1:4) in floor, stair & lobby including pointing in cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as per direction of Engineer - in - charge to match with the existing work. [Slurry for bedding @ 4.4 kg/Sq.m and pointing @2.0 kg/Sq.m](Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade)
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
CIVIL_new.pdf
Additional Documents • 1.90 MB
BOQ_2485282.xls
BOQ • 0.29 MB
T_D.pdf
Tender Documents • 0.57 MB