Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Finance | ₹9.5 L | L1 | Admitted-Finance |
| 2 | L2₹9.5 LAdmitted-Finance | ₹9.5 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not fulfill the NIT condition no. 2 (Viii) |
| 4 | Rejected-Technical 14 C POCKET A VIKAS PURI EXTN NEW DELHI 110018 | WEST | DELHI | 110018 | - | - | Rejected-Technical Not fulfill the NIT condition no. 2 (Viii) |
| Sl No | Description | Qty | Unit | M G Traders and Engineers L1 | Gupta Brothers L2 |
|---|---|---|---|---|---|
| 1.00 | Installation, Operation & Maintenance of a 25 HP sewage dewatering pump-set trolley at Indra Camp No. 2, JJC Vikaspuri with all necessary accessories such as Non-Return Valves, sluice valve, bends, flanges, Cables, MS suction line properly lowered into the sump-well, conforming to the site depth and MS delivery pipeline or other suitable pipeline is to be laid as per site requirement. This includes all required consumables such as nuts-bolts, washers, rubber packing, and execution activities like welding and alignment followed by proper reinstatement. Barricading with warning boards and external lighting arrangement around the trolley shall be placed to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels, and provide shelter to operating staff including minor civil works required during execution of work. Round-the-clock staffing with helper if required is to be ensured for continuous monitoring and operation as per the direction of the Engineer-in-Charge.
Note: Electricity required for running the pump-sets shall be provided by the department as per site conditions.
Period: 90 days x 3 Shift = 270 Shift. | 270 | Shifts | 5,79,150 ₹5.8 L | 5,83,200 ₹5.8 L |
| 2.00 | Installation, Operation & Maintenance of a 20 HP sewage dewatering pump-set trolley near JG3 Bank Road, Vikaspuri Keshopur with all necessary accessories such as Non-Return Valves, sluice valve, bends, flanges, Cables, MS suction line properly lowered into the sump-well, conforming to the site depth and MS delivery pipeline or other suitable pipeline is to be laid as per site requirement. This includes all required consumables such as nuts-bolts, washers, rubber packing, and execution activities like welding and alignment followed by proper reinstatement. Barricading with warning boards and external lighting arrangement around the trolley shall be placed to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels, and provide shelter to operating staff including minor civil works required during execution of work. Round-the-clock staffing with helper if required is to be ensured for continuous monitoring and operation as per the direction of the Engineer-in-Charge.
Note: Electricity required for running the pump-sets shall be provided by the department as per site conditions.
Period: 60 days x 3 Shift = 180 Shift. | 180 | Shifts | 3,66,120 ₹3.7 L | 3,69,000 ₹3.7 L |
Tender Value
₹11.2 L
EMD Value
₹22,500
Closing Date
14 May 2026, 3:00 pmClosed
Executive Engineers E(EnM)M-9
C-2A Block Opp. Geeta Mandir Janakpuri
(Group-2) Installation ,Operation / Maintenance of various Capacity Temporary Sewage pump Trolleys with all ancillary EnM equipment on hiring basis at (1) Indra Camp No. 2, JJC Vikaspuri (2) Near JG3 Bank Road, Vikaspuri Keshopur in Tilak Nagar Const
2026_DJB_291077_16
NIT NO. 01 (2026-27)/EE(EnM)M-9
Open Tender
Civil Works
150 days
C-2A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
DJB Account No. 50448339804
₹22,500
16 May 2026
8 May 2026
14 May 2026
8 May 2026
14 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Installation, Operation & Maintenance of a 25 HP sewage dewatering pump-set trolley at Indra Camp No. 2, JJC Vikaspuri with all necessary accessories such as Non-Return Valves, sluice valve, bends, flanges, Cables, MS suction line properly lowered into the sump-well, conforming to the site depth and MS delivery pipeline or other suitable pipeline is to be laid as per site requirement. This includes all required consumables such as nuts-bolts, washers, rubber packing, and execution activities like welding and alignment followed by proper reinstatement. Barricading with warning boards and external lighting arrangement around the trolley shall be placed to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels, and provide shelter to operating staff including minor civil works required during execution of work. Round-the-clock staffing with helper if required is to be ensured for continuous monitoring and operation as per the direction of the Engineer-in-Charge.
Note: Electricity required for running the pump-sets shall be provided by the department as per site conditions.
Period: 90 days x 3 Shift = 270 Shift. | 270 | Shifts | 80 | ₹21,600 | Item1 |
| 2 | Installation, Operation & Maintenance of a 20 HP sewage dewatering pump-set trolley near JG3 Bank Road, Vikaspuri Keshopur with all necessary accessories such as Non-Return Valves, sluice valve, bends, flanges, Cables, MS suction line properly lowered into the sump-well, conforming to the site depth and MS delivery pipeline or other suitable pipeline is to be laid as per site requirement. This includes all required consumables such as nuts-bolts, washers, rubber packing, and execution activities like welding and alignment followed by proper reinstatement. Barricading with warning boards and external lighting arrangement around the trolley shall be placed to ensure public safety.
The job also includes the erection of a temporary tin shed at the site to house the pump-sets, electrical panels, and provide shelter to operating staff including minor civil works required during execution of work. Round-the-clock staffing with helper if required is to be ensured for continuous monitoring and operation as per the direction of the Engineer-in-Charge.
Note: Electricity required for running the pump-sets shall be provided by the department as per site conditions.
Period: 60 days x 3 Shift = 180 Shift. | 180 | Shifts | 80 | ₹14,400 | Item2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_386256.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid