Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 CrAdmitted-Finance | ₹12.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BHEL-GE GAS TURBINE SERVICES PVT LTD L1 |
|---|---|---|---|---|
| 10.00PART-A INSPECTION / SERVICES Charges for inspection / Services in CPP & OPH Gas Turbines (230-GTG-01/02/03, 21-GTG-04 & 21-GTG-05) for 1st Year - 2025 as per Scope fo Work with Time Schedule and Special Terms & Conditions Attached as Annexures. | ||||
| 20.00 | Combustion Inspection (CI), Mechanical | 1 | EA | 15,07,584 ₹15.1 L |
| 30.00 | Combustion Inspection (CI) Instrumentation | 1 | EA | 13,94,050 ₹13.9 L |
| 40.00 | Borescope Inspection (BI) | 1 | EA | 4,75,678 ₹4.8 L |
| 50.00 | Major Inspection of GT(MI) Mechanical | 1 | EA | 87,13,517 ₹87.1 L |
| 60.00 | Major Inspection of GT(MI) Instrumentation | 1 | EA | 44,55,707 ₹44.6 L |
| 70.00 | Auxilary Gear Box (AGB) Inspection | 1 | EA | 15,01,116 ₹15.0 L |
| 80.00 | Load Gear Box Inspection | 1 | EA | 15,18,772 ₹15.2 L |
| 90.00 | Extended Combustion Inspection / Hot Gas Path Inspection | 1 | EA | 39,66,937 ₹39.7 L |
| 100.00 | Mechanical / Control & Instrumentation -TA (Technical Adviser) - Per Day (8 hrs) | 1 | DAY | 1,00,964 ₹1.0 L |
Tender Value
Refer Docs
Closing Date
15 Feb 2025, 11:00 amClosed
G KANAGARAJ - DGM Contracts
CPCL, Manali - Chennai.
LTSA for Services / Inspection and refurbishment of Spares for Gas Turbines 230-GT-01 / 02 / 03 and 21-GT-04 / 05 at CPCL, Manali
2024_DGMMC_9791_1
CPCLK24470
Single
Services
CPCL, Manali - Chennai.
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
CPCL, Manali - Chennai.
5 Sept 2025
24 Dec 2024
15 Feb 2025
24 Dec 2024
15 Feb 2025
2 Jan 2025
31 Dec 2024
Amount
PART-A INSPECTION / SERVICES Charges for inspection / Services in CPP & OPH Gas Turbines (230-GTG-01/02/03, 21-GTG-04 & 21-GTG-05) for 1st Year - 2025 as per Scope fo Work with Time Schedule and Special Terms & Conditions Attached as Annexures.
Combustion Inspection (CI), Mechanical
Combustion Inspection (CI) Instrumentation
Borescope Inspection (BI)
Major Inspection of GT(MI) Mechanical
Major Inspection of GT(MI) Instrumentation
Auxilary Gear Box (AGB) Inspection
Load Gear Box Inspection
Extended Combustion Inspection / Hot Gas Path Inspection
Mechanical / Control & Instrumentation -TA (Technical Adviser) - Per Day (8 hrs)
Mechanical -TA (Technical Adviser) - Per Hour, Extra Hours beyond 8 hrs on normal working days and on Sundays and Public Hoidays
To & Fro Travel Charges (Economy Class), Boarding & Lodging Charges & Local Charges, Per TA per Visit, to be Paid at Actuals on submission of doumentary proof
Exhaust Plenum Replacement
IGV Relocation along with MI
GT Frame-V Rotor Repair
PART- B RECONDITIONING OF SPARES Charges for Reconditioning Services in CPP & OPH Gas Turbines (230-GTG-01/02/03, 21-GTG-04 & 21-G TG-05) for 1st Year - 2025 as per Scope fo Work with Time Schedule and Special Terms & Conditions Attached as Annexures
Repair of First Stage Nozzle S1N(1No)
Repair of 2nd Stage Nozzle S2N (1NO)
Repair of 1st Stage Shroud (STD)
Repair of 2nd Stage Shroud (STD)
Repair of 2nd Stage (Honey Comb) Shroud (Set=30Nos)
Repair of 1st Stage Buckets(1Set= 120 Nos.)
Repair of 2nd Stage Buckets (1Set=90 Nos.)
Repair of Combustion Liners
Repair of Transition Pieces
Repair, Testing Calibration of Dual Fuel Nozzle
Repair of Cross Fire Tubes
PART- C SUPPLY OF SPARES FOR RECONDITIONING & REPAIR Charges for Supply of Parts for Replacement towards Repair & Reconditioning of OPH Gas Turbines (230-GTG-01/02/03, 21-GTG-04 & 21-G TG-05) for 1st Year - 2025 as per Scope fo Work with Time Schedule and Special Terms & Conditions Attached as Annexures.
Hula Seal For Combustion Liner
Cowl Cap for Combustion Liner
Cowl Cap Assembly for Combustion Liner
XFT Collar for Combustion Liner
AFT Sleeve for Combustion Liner
Fixed Seal For Transition Pieces
Floating Seal for Transition Pieces
Transition Piece Assembly For Dual Fuel Nozzle
Air Cone for Dual Fuel Nozzle
Gas Tip for Dual Fuel Nozzle
Gasket for Dual Fuel Nozzle
Lock Plate for Dual Fuel Nozzle
T Connector for Dual Fuel Nozzle
Compressor Rotor Blade Kit with Spacer for Frame-V for GT Rotor Repair
Marriage Hardware for Frame-V for GT Rotor Repair
Note: 1. This LTSA contract is valid from 01.01.2025 to 31.12.2029 2. The above mentioned unit rates are for calendar year 2025. 3. To arrive at unit rates for calendar year 2026 = Unit Rate in 2025 X fixed annual escalation 4. Similarly for 2027, 2028, 2029, the unit rates will be calculated as above on annual compounding basis from 1st January of every year. 5. For Part - A & Part - B, the fixed annual escalation will be 6% 6. For Part - C, the annual escalation will be 4%
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid