Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-AOC M S RRK PROJECTS D 306 ADG P CHENNAI 11 3RD CROSS SIR MV LAYOUT VIDHYARANYAPURA POST BANGALORE 560097 | BENGALURU URBAN | KARNATAKA | 560097 | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹31.8 L+₹16,425 (0.52%)Rejected-Finance | L2 | Rejected-Finance NOT BEING LOWEST | |
| 3 | L3₹32.5 L+₹81,260 (2.57%)Rejected-Finance BUILDING NO FLAT NO 19 6TH CROSS ROAD SANJEEVINI NAGAR MUDALAPALYA BANGALORE 560072 | BANGALORE | BANGALORE | KARNATAKA | 560072 | L3 | Rejected-Finance NOT BEING LOWEST | |
| 4 | L4₹45.0 L+₹13.3 L (42.0%)Rejected-Finance | L4 | Rejected-Finance NOT BEING LOWEST |
| Sl No | Description | Qty | Unit | RAHUL ENTERPRISES L3 | mahadevi Enterprises L2 | RRK PROJECTS L1 | RASI AND COMPANY L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for servicing and maintenance to Inverter type Highwall split AC of any make and capacity upto 3 TR including general servicing of indoor and outdoor unit as and when ordered as in preventive maintenance including cleaning, removing the dust particles of air filters replacement of all worn out parts greasing of fan motors, checking of gas pressure, charging of refrigerant, cleaning of condenser/evaporator coil with air blower, wet servicing of condenser coil unit with caustic soda etc including provision of all T&P required for taking down and refixing of outdoor unit like scaffolding if required complete for the smooth and satisfactorily functioning of the AC unit all as directed by Engineer-in-Charge.
NOTE : - Replacement of compressor and spares such as starting capacitor, running capacitor, fan motor, Blowers, PCBs, Refrigerant, Oil etc., if required shall be measured and paid separately under relevant items of this BOQ. | 190 | EACH JOB | 950 ₹1,80,500 | 750 ₹1,42,500 Lowest | 850 ₹1,61,500 | 2,500 ₹4,75,000 |
| 2.00 | Material and labour for servicing and maintenance of Non Inverter type Highwall split AC of any make and capacity upto 3 TR including general servicing of indoor and outdoor unit as and when ordered as in preventive maintenance including cleaning, removing the dust particles of air filters, replacement of all worn out parts, greasing of fan motors, checking of gas pressure, topping up of refrigerant cleaning of condenser/evaporator coil with air blower, wet servicing of condenser coil unit with caustic soda etc including provision for all arrangement for taking down out door unit all as required for the smooth and satisfactorily functioning of the AC unit all as directed by Engineer-in-Charge.
NOTE :
Replacement of compressor and spares such as starting capacitor, running capacitor, fan motor, Blowers, PCBs, Refrigerant, Oil etc., if required shall be measured and paid separately under relevant items of this Schedule. | 170 | EACH JOB | 950 ₹1,61,500 | 1,000 ₹1,70,000 | 700 ₹1,19,000 Lowest | 2,500 ₹4,25,000 |
| 3.00 | All as per Sl Item No 2 above but for tower AC upto 4 TR | 6 | EACH JOB | 1,000 ₹6,000 | 800 ₹4,800 Lowest | 1,200 ₹7,200 | 2,750 ₹16,500 |
| 4.00 | Supply and fixing in replacement of compressor upto 3TR capacity for Cassette type AC unit Non Inverter type complete all as specified and as directed. | 4 | EACH | 34,000 ₹1,36,000 | 38,500 ₹1,54,000 | 30,000 ₹1,20,000 | 17,400 ₹69,600 Lowest |
| 5.00 | Supply and fixing in replacement of compressor upto 3 TR capacity for Inverter Cassette type AC unit. complete all as specified and as directed. | 4 | EACH | 34,600 ₹1,38,400 | 52,500 ₹2,10,000 | 40,000 ₹1,60,000 | 19,575 ₹78,300 Lowest |
| 6.00 | Material and labour for repairing of electronic control circuit board of invertor type Split type AC upto 2.5 TR capacity indoor units including taking down old unserviceable one complete all as specified and as directed. | 20 | EACH | 1,500 ₹30,000 Lowest | 2,000 ₹40,000 | 5,000 ₹1,00,000 | 3,100 ₹62,000 |
| 7.00 | Material and labour for repairing of electronic control circuit board of inverter type Split type AC upto 2.5 TR capacity out door units including taking down old unserviceable one including scaffolding if required complete all as specified and as directed. | 25 | EACH | 1,500 ₹37,500 Lowest | 2,000 ₹50,000 | 5,000 ₹1,25,000 | 3,625 ₹90,625 |
| 8.00 | Material and labour for repairing of electronic control circuit board of inverter type Cassette AC upto 4 TR capacity indoor unit including taking down old unserviceable one complete all as specified and as directed. | 20 | EACH | 1,500 ₹30,000 Lowest | 2,500 ₹50,000 | 6,000 ₹1,20,000 | 4,500 ₹90,000 |
| 9.00 | Material and labour for repairing of electronic control circuit board of inverter type Cassette AC upto 4 TR capacity out door unit including taking down old unserviceable one including scaffolding if required complete all as specified and as directed. | 20 | EACH | 1,500 ₹30,000 Lowest | 2,650 ₹53,000 | 6,000 ₹1,20,000 | 5,425 ₹1,08,500 |
| 10.00 | Material and labour for repairing of electronic control circuit board of indoor units of split type AC upto 2.5 TR capacity including taking down old unserviceable one complete all as specified and as directed. | 20 | EACH | 1,500 ₹30,000 Lowest | 1,850 ₹37,000 | 2,000 ₹40,000 | 3,625 ₹72,500 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
18 Aug 2025, 6:00 pmClosed
GE I R AND D EAST BANGALORE
GE I R AND D EAST BANGALORE 560093
REPAIRS MAINTENANCE OF SPLIT WINDOW CASSETTE TYPE AC WATER COOLERS REFRIGERATORS AT CABS STIR AND CEMILAC UNDER GE I R D EAST BANGALORE
2025_MES_718506_1
8632/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE I R AND D EAST BANGALORE
CLASS D CATEGORY c(i)
8 documents required · 8 mandatory
₹500
GE I R AND D EAST BANGALORE
₹96,000
Yes
12 Sept 2025
22 Jul 2025
25 Aug 2025
22 Jul 2025
18 Aug 2025
6 Aug 2025
23 Jul 2025 - 2 Aug 2025
Amount
Material and labour for servicing and maintenance to Inverter type Highwall split AC of any make and capacity upto 3 TR including general servicing of indoor and outdoor unit as and when ordered as in preventive maintenance including cleaning, removing the dust particles of air filters replacement of all worn out parts greasing of fan motors, checking of gas pressure, charging of refrigerant, cleaning of condenser/evaporator coil with air blower, wet servicing of condenser coil unit with caustic soda etc including provision of all T&P required for taking down and refixing of outdoor unit like scaffolding if required complete for the smooth and satisfactorily functioning of the AC unit all as directed by Engineer-in-Charge. NOTE : - Replacement of compressor and spares such as starting capacitor, running capacitor, fan motor, Blowers, PCBs, Refrigerant, Oil etc., if required shall be measured and paid separately under relevant items of this BOQ.
Material and labour for servicing and maintenance of Non Inverter type Highwall split AC of any make and capacity upto 3 TR including general servicing of indoor and outdoor unit as and when ordered as in preventive maintenance including cleaning, removing the dust particles of air filters, replacement of all worn out parts, greasing of fan motors, checking of gas pressure, topping up of refrigerant cleaning of condenser/evaporator coil with air blower, wet servicing of condenser coil unit with caustic soda etc including provision for all arrangement for taking down out door unit all as required for the smooth and satisfactorily functioning of the AC unit all as directed by Engineer-in-Charge. NOTE : Replacement of compressor and spares such as starting capacitor, running capacitor, fan motor, Blowers, PCBs, Refrigerant, Oil etc., if required shall be measured and paid separately under relevant items of this Schedule.
All as per Sl Item No 2 above but for tower AC upto 4 TR
Supply and fixing in replacement of compressor upto 3TR capacity for Cassette type AC unit Non Inverter type complete all as specified and as directed.
Supply and fixing in replacement of compressor upto 3 TR capacity for Inverter Cassette type AC unit. complete all as specified and as directed.
Material and labour for repairing of electronic control circuit board of invertor type Split type AC upto 2.5 TR capacity indoor units including taking down old unserviceable one complete all as specified and as directed.
Material and labour for repairing of electronic control circuit board of inverter type Split type AC upto 2.5 TR capacity out door units including taking down old unserviceable one including scaffolding if required complete all as specified and as directed.
Material and labour for repairing of electronic control circuit board of inverter type Cassette AC upto 4 TR capacity indoor unit including taking down old unserviceable one complete all as specified and as directed.
Material and labour for repairing of electronic control circuit board of inverter type Cassette AC upto 4 TR capacity out door unit including taking down old unserviceable one including scaffolding if required complete all as specified and as directed.
Material and labour for repairing of electronic control circuit board of indoor units of split type AC upto 2.5 TR capacity including taking down old unserviceable one complete all as specified and as directed.
Supply and fixing in replacement of compressor upto 2.5 TR capacity for Highwall Split AC unit including taking down old unserviceable one complete all as specified and as directed.
Supply and fixing in replacement of compressor upto 2.5 TR capacity for Inverter type Highwall Split AC unit. complete all as specified and as directed.
Repairing and fixing of bush bearing of blower fan motor for Split type AC upto 2.5 TR capacity, including taking down old unserviceable one complete all as specified and as directed.
Supply and fixing of capacitor 4/6 MFD of blower fan motor for window/split type AC's including taking down old unserviceable one complete all as specified and as directed by Engineer-in-Charge.
Dismantling of unserviceable fan motor from the Air conditioner of upto 2.5 TR capacity and re-winding of fan motor with appropriate gauge of super enameled copper conductor to match with the existing design including heat varnishing, overhauling, testing and re-fixing the same complete all as specified and as directed by Engineer-in-Charge.
Supply and fixing of starting capacitor of 80/100 MFD capacity, AC 240 volts and 50 Hz including taking down of old unserviceable capacitor for 1.5/2.0/1.0 Tonne AC complete all as specified and as directed by Engineer-in-Charge. MAKE : UNIVERSAL / SARADA / POWER
Supply and fixing of running capacitor of 36/40/45/50 MFD capacity AC 240 volt and 50 Hz including taking down of old unserviceable capacitor for 1.0/1.5/2.0 Tonne AC complete all as specified and as directed by Engineer-in-Charge. MAKE : UNIVERSAL / SARADA / POWER
Taking out of old unserviceable relay of any type & supply and fixing of relay AC 230 volt single phase for window/split type upto 2.5 TR capacity complete all as specified and as directed by Engineer-in-Charge. Make : Ranutrol/Sriram/AE/Microtech.
Supply and fixing of Air filter for Split AC upto 2.5 TR capacity including taking down old unserviceable one complete all as specified and as directed by Engineer-in-Charge.
Material and labour for taking out of worn-out blower fan from split AC upto 2.5 TR capacity supply and fixing new Blower Fan complete all as specified and as directed by Engineer-in-Charge.
Material and labour for taking out blower Runner suitable for Split AC upto 2.5TR Capacity supply and fixing new blower runner complete all as specified and as directed by Engineer-in-Charge.
Supply and fixing in replacement by removing defective unserviceable fan blades from split type air-conditioners up to 3 TR capacity and supply and fix new blade suitable for air-conditioners of existing MAKE of LG / BLUE STAR / VOLTAS / CARRIER complete all as specified and as directed.
Supply and fixing MS iron stand with nuts bolts stable for 1.5/2TR split type and connected works complete all as specified and as directed by Engineer-in-Charge.
Material and labour for pressure testing with N2 gas and rectifying the leakages found in the high wall split and cassette-type ACs of any capacity including vacuumising and charging the refrigerant gas to the desired pressure and quantity complete for satisfactory functioning complete all as specified and as directed.
Supply and charging of R22 refrigerant complete all as specified and as directed by Engineer-in-Charge.
Supply and charging of R32 refrigerant complete all as specified and as directed by Engineer-in-Charge.
Supply and charging of R410A refrigerant complete all as specified and as directed by Engineer-in-Charge.
Supply and fixing of contactor assembly upto 1.5/2/3 TR Split type AC single phase 230 volt condensing unit of any make including taking down old unserviceable one complete all as specified and as directed by Engineer-in-Charge.
Supply and fixing in replacement of electronic control circuit board of invertor type Split type AC 1.5/2.0/3.0 TR capacity indoor units of suitable for split AC including taking down old unserviceable one complete all as specified and as directed.
Supply and fixing in replacement of electronic control circuit board of inverter type Split type AC 1.5/2.0/3.0 TR capacity out door units of suitable for split AC including taking down old unserviceable one complete all as specified and as directed.
Supply and fixing in replacement of swing motor for Highwall Split AC unit complete all as specified and as directed.
Supply and fixing in replacement of Remote Control Circuit including taking down the old unserviceable one split AC upto 3 TR capacity complete all as specified and as directed.
Material and labour for attending breakdown complaints pertains to high wall split and Package type/Tower AC ACs of any make up to 4TR capacity, as and when required by the Ref-Mech and helper, with necessary tools and tackles for checking the equipment at the existing location. Identify equipment faults, address and rectify minor problems, perform fault resetting, filter cleaning, and drain cleaning, and ensure the unit is fully functional in all respects, including provision for all arrangement for taking down out door unit if required completing all tasks as specified and as directed.
Taking out window type AC from the existing place for complete servicing and minor repair to minor circuital wiring, oiling and greasing, cleaning (condenser, blower motor, evaporator, etc.) and also cleaning with air pressure using chemical with fresh water and dry up properly and refixing in original position including testing complete all as specified and as directed.
Supply and fixing copper pipe with insulation kits 1/2" including cutting old unserviceable one and fixing new with brazing complete all as specified and as directed.
Supply and fixing copper pipe with insulation kits 3/8" including cutting old unserviceable one and fixing new with brazing complete all as specified and as directed.
Supply and fixing copper pipe with insulation kits 5/8" including cutting old unserviceable one and fixing new with brazing complete all as specified and as directed.
Supply and fixing copper pipe with insulation kits 1/4" including cutting old unserviceable one and fixing new with brazing complete all as specified and as directed.
Material and labour for taking out water cooler from the existing place for repairing of compressor, servicing, flushing and refixing the repaired compressor, leakage testing, vaccummnising the system, gas charging completely complete all as specified and as directed by Engineer-in-Charge. NOTE :- Refrigerant shall be measured separately.
Supply and fixing bush of fan motor for water cooler of capacity 80/150 Ltr including taking down old unserviceable one complete all as specified and as directed by Engineer-in-Charge.
Material and labour for fan capacitor for water cooler with suitable rating including taking down old unserviceable one complete all as specified and as directed by Engineer-in-Charge.
Material and labour for dismantling of unserviceable fan motor from water cooler of any capacity and re-winding of fan motor with appropriate gauge of super enameled copper conductor to match with the existing design including overhauling, testing and re-fixing the same complete all as specified and as directed by Engineer-in-Charge.
Material and labour for taking out of unserviceable starting capacitor for water cooler of 80/150 capacity, supply and fixing of new starting capacitor to match with the existing one complete all as specified and as directed by Engineer-in-Charge.
Material and labour for taking out of unserviceable running capacitor from 80/150 Ltrs capacity water cooler, supply and fixing of new capacitor of capacity 10 MFD (suitable for 1/3 HP) complete all as specified and as directed by Engineer-in-Charge.
Material and labour for taking out unserviceable relay from water cooler of capacity 80/150 Ltrs capacity (for 1/3 HP compressor), supply and fixing of new relay to match with the existing one complete all as specified and as directed by Engineer-in-Charge.
Material and labour for taking out of unserviceable over load protector, Supply and fixing new over load protector to water cooler of capacity 80/150 Ltrs complete all as specified and as directed by Engineer-in-Charge.
Material and labour for taking out of unserviceable thermostat switch, supply and fixing of new thermostat switch to the water cooler of any capacity complete all as specified and as directed by Engineer-in-Charge.
Material and labour for flushing of choked / condenser thoroughly with nitrogen pressure, refixing the same with proper brazing & leak testing complete all as specified and as directed by Engineer-in-Charge.
Taking out of existing worn out and unserviceable water faucets of any type 15mm bore, supply and fixing of cast copper alloy chromium plated push type / lift tap water faucets of 15mm bore complete all as specified and as directed by Engineer-in-Charge.
Taking out of existing worn out and unserviceable float valve 15mm bore of any type, supply and fixing of float valve of 15mm dia including inlet nipple and connecting unions etc complete all as specified and as directed by Engineer-in-Charge.
Supply only 4 KVA automatic voltage stabilizer of 190 to 250 Volt complete all as specified and as directed by Engineer-in-Charge.
Supply only 5 KVA automatic voltage stabilizer of 190 to 250 Volt complete all as specified and as directed by Engineer-in-Charge.
Material and labour for opening / dismantling and removing the indoor unit of split air conditioner of cap 1.5 /2 TR, supply and fix new indoor unit of split air conditioner of 1.5/2 TR complete all as specified and as directed. MAKE : LG / VOLTAS / BLUE STAR / SAMSUNG / CARRIER / HITACHI or as per existing make
Supply and fix in replacement of outdoor condensing unit of split type AC (normal/ invertor type )1.5/2 TR capacity complete all as specified and as directed. MAKE : VOLTAS / BLUE STAR / CARRIER or as per existing make
Supply and fixing heat insulation superior quality nitrile rubber for copper tubing any size of refrigerant line including necessary clamps PVC tape knots etc complete all as specified and as directed.
Disconnecting and taking down unserviceable internal wiring of split type air conditioner up to 3 TR capacity, supply and rewiring complete with copper conductors complete including testing and commissioning complete all as specified and as directed.
Supply and fixing Single pole and neutral enclosure with a two pin and earth plug and socket complete with one no 20 Amps MCB SP C curve type with complete connection complete all as specified and as directed.
Supply and fixing replacement PVC insulated cable flexible type with copper conductor of size 2.5 sq.mm 3 core suitable for window/split type air conditioner up to 3 TR for connecting to indoor to outdoor unit capacity complete all as specified and as directed.
Material and labour for submain wiring of 2 run 2.5 sq.mm size PVC insulated unsheathed multistranded copper conductor 1100 Volts FRLS grade drawn through and including suitable size of PVC conduit with all accessories in surface including one run of 2.5 sq.mm PVC insulated multi stranded copper wire for earth, ISI marked and connecting up complete including removing old unserviceable cables complete all as specified and as directed by Engineer-in-Charge. NOTE :- 3 runs of 2.5 sq.mm cable and one run of PVC conduit shall be measured as RM
Material and labour for submain wiring of 2 run 4 sq,mm size PVC insulated unsheathed multi stranded copper conductor 1100 Volts FRLS grade drawn through and including suitable size of PVC conduit with all accessories in surface including one run of 4.0 sq,mm PVC insulated multistranded copper wire for earth, ISI marked and connecting up complete including removing old unserviceable cables all complete all as specified and as directed by Engineer-in-Charge. NOTE : 3 runs of 4 sq,mm cable and one run of PVC conduit shall be measured as RM
Material and labour for submain wiring of two runs of 6 sq,mm size PVC insulated unsheathed multistranded copper conductor 1100 Volts FRLS grade drawn through and including suitable size of PVC conduit with all accessories in surface including one run of 6.0 sq,mm PVC insulated multistranded copper wire for earth, ISI marked and connecting up complete including removing old unserviceable cables complete all as specified and as directed by Engineer-in-Charge. NOTE : 3 runs of 6 sq,mm cable and one run of PVC conduit shall be measured as RM
Supply and fixing in replacement of AC drain CPVC pipe of size 20 mm dia complete including fixing on walls/ceilings etc cutting holes in the walls for passing the pipe iwith all T&P required for fixing the pipe including scaffolding if required including all CPVC plain and brass threaded fittings which includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge.
Supply and fixing in replacement of AC drain CPVC pipe of size 25mm dia complete including fixing on walls/ceilings etc cutting holes in the walls for passing the pipe iwith all T&P required for fixing the pipe including scaffolding if required including all CPVC plain and brass threaded fittings which includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge.
Servicing and maintenance to electric connection of Air compressor complete unit of make ELGI , model No -EG18 FAB : BQLS030423 make including general servicing of complete unit as and when ordered as in preventive maintenance including cleaning, removing the dust particles replacement of old unserviceable spare parts, greasing, etc all as required for the smooth and satisfactorily functioning of the units all as directed by Engineer-in-Charge. NOTE :- Replacement of spares will be measured and paid separately.
Air filter element E18T022
Oil filter element -75 LPM
Air Oil separator pinion
Oil air lube XD-20L(BPCL)
Ref Compressor
RefGas R-134 A
Temperature Controller
Temperature Sensor
Fan assembly
Capillary tube
Supply and fixing in replacement of single phase transformer 230 volts IP 20 50 Hz 30 VA of ELGI dryer ELRD-150 bar compressor including taking down of old unserviceable one complete all as specified and as directed.
Servicing and maintenance to electric connection of Air drier Model No-ELRD150 complete unit of make ELGI Compressor make including general servicing of complete unit as and when ordered as in preventive maintenance including cleaning, removing the dust particles, replacement of old unserviceable spare parts, greasing, including checking and repairing of complete internal wiring etc all as required for the smooth and satisfactorily functioning of the units all as directed by Engineer-in-Charge. NOTE : Replacement of spares will be measured and paid separately
Filter element (FF) 15/30
Filter element (PF) 15/30
1/2 FRL AAT 24 64033
Filter element AK 10/30
Auto drain valve 1/2 AAT 24 64019
Comprehensive Maintenance to Precision type AC for Data centre runs round the clock of capacity 6 TR with 06 nos of ODU and 06 nos of rack type indoor units of Vertiv make including general servicing of indoor unit and outdoor unit as and when ordered as in preventive maintenance including cleaning, removing the dust particles of air filters replacement of all worn out parts greasing of fan motors, checking of gas pressure, charging of refrigerant etc complete with all T&P required including scaffolding if required for the smooth and satisfactorily functioning of the AC units all as directed by Engineer-in-Charge. Location: CEMILAC
mahadevi Enterprises (BID ID -3389858)
RAHUL ENTERPRISES (BID ID -3386015)
RASI AND COMPANY (BID ID -3396961)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .